Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: March 15, 2016 Client: Abbott Inc | Permit status: Completed | Permit id: 673448 | |||||
Alteration permit Date: March 15, 2016 Client: Abbott Inc | Permit status: Completed | Permit id: 673448 | |||||
SCORE 100 Seal sewer lateral, remove trap and fai pa one call #2017-1230924 Date: May 8, 2017 Contractor: Mr Ds Plumbing And Heating Client: Abbott Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 6, 2017 | Permit id: 781349 | |||||
SCORE 100 Complete demolition of 3 story row houses. Date: November 28, 2017 Contractor: Geppert Bros. Inc Client: Abbott Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 28, 2017 | Permit id: 826680 | |||||
SCORE 100 For the complete demolition of a three-story structure as per plan. A covered walkway or sidewalk closure shall be required within 8 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits may be required. Any deviation will require an amended building permit. Removal of asbestos required prior to commencement of work Date: November 30, 2017 Contractor: Geppert Bros. Inc Client: Abbott Inc | Permit type: Demolition permit | Permit status: Active | Completion date: November 30, 2017 | Permit id: 826681 | |||||
SCORE 99 Repair fractured retaining wall repair stucco a separate permit is required for any additional alterations that are not specifically addressed on case 498731. Date: March 15, 2016 Contractor: Piccari Construction Co Inc Client: Abbott Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 673448 |