Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 2 amp service change Date: September 11, 2007 Contractor: The Electric Connection Client: Ariel Solomon,Vic Solomon | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 28, 2007 | Current use: Single family d | |||||
SCORE 95 Sewer repair in row, (forest ave), 3x cut in pavement reqd Date: January 25, 2008 Contractor: Pipeline Industries Inc Client: Leyla Wefalle,Mark Wefalle | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 65 Addition of s. F. To enclose portion of front porch as enlarged kitchen area, relocated plumbing fixtures. Includes associated electrical and plumbing. Client: Leyla Wefalle,Mark Wefalle | Applicant: Doug Baumgartner | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 25, 2009 | Current use: Single family d | |||||
SCORE 93 Installation of a flush mount, grid-tied, 6. 9kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: December 10, 2014 Contractor: Endurance Solar And Engineering Client: Leyla Steele, Steele | Applicant: Endurance Solar & Engineering | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2015 | Current use: Single family d | |||||
SCORE 93 Installation of a flush mount, grid-tied, 6. 9kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Leyla Steele | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-05498 | |||||
Addition of s. F. To enclose portion of front porch as enlarged kitchen area, relocated plumbing fixtures. Includes associated electrical and plumbing. Date: March 26, 2008 Value: $5 Client: Leyla Wefalle | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: March 25, 2009 | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-00757 | |||||
SCORE 95 Sewer repair in row, (forest ave), 3footx10foot cut in pavement reqfootd Date: January 25, 2008 Contractor: Pipeline Industries, Inc Client: Leyla Wefalle | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2008-00270 | |||||
Addition of s. F. To enclose portion of front porch as enlarged kitchen area, relocated plumbing fixtures. Includes associated electrical and plumbing. Date: March 26, 2008 Value: $5,000 Client: Leyla Wefalle | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: March 25, 2009 | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-00757 |