Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: May 13, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 150560 | |||||
Electrical permit Date: June 13, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Expired | Permit id: 158217 | |||||
Plumbing permit Date: June 10, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 156238 | |||||
Electrical permit Date: May 26, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 612647 | |||||
Plumbing permit Date: May 13, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 609791 | |||||
Alteration permit Date: May 1, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 607114 | |||||
Electrical permit Date: May 26, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 612647 | |||||
Plumbing permit Date: May 13, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 609791 | |||||
Alteration permit Date: May 1, 2015 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 607114 | |||||
Electrical permit Date: June 13, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Expired | Permit id: 158217 | |||||
Plumbing permit Date: June 10, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 156238 | |||||
Alteration permit Date: May 13, 2008 Client: Tabb Sheldon Tabb Barbara F | Permit status: Completed | Permit id: 150560 | |||||
SCORE 98 Interior renovations to 3rd floor. Rec. Room and 4th floor. Study Date: May 13, 2008 Contractor: Gardner Fox Associates Inc Client: Tabb Sheldon Tabb Barbara F | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 150560 | |||||
SCORE 99 Fixture installation Date: June 10, 2008 Contractor: Falcone And Truman Plumbing Inc Client: Tabb Sheldon Tabb Barbara F | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 4, 2015 | Permit id: 156238 | |||||
SCORE 73 Interior renovation redoing two bathroom, replacing 1-tub and adding a walk in shower with new vanity, toilet, sink and floor in master bath ez permit standard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 1, 2015 Contractor: Gregory Scardigli General Cont Client: Tabb Sheldon Tabb Barbara F | Permit type: Alteration permit | Permit status: Completed | Completion date: August 24, 2015 | Permit id: 607114 | |||||
SCORE 89 Run new drains and water lines to 4 piece bath on 3rd fl. Replace shower pan,wc,vanity on 2nd fl bathroom connecting to existing plumbing (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: May 13, 2015 Contractor: Mr Tubs Plumbing And Heating Llc Client: Tabb Sheldon Tabb Barbara F | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 24, 2015 | Permit id: 609791 | |||||
SCORE 100 Install 9 recessed cans, 1 exhaust fan, 1 appliance circuit, 1 bathroom gfci circuit as per 2005 nec (cc district) Date: June 13, 2008 Contractor: Salvatore Depalma Client: Tabb Sheldon Tabb Barbara F | Permit type: Electrical permit | Permit status: Expired | Completion date: June 13, 2008 | Permit id: 158217 | |||||
SCORE 89 Demo and renovate 2 bathrooms, add lighting, recepts, relocate switching install new devices and fixtures as per 2008 nec (cc district) Date: May 26, 2015 Contractor: Bob Holmes Electrical Cont Llc Client: Tabb Sheldon Tabb Barbara F | Permit type: Electrical permit | Permit status: Completed | Completion date: November 16, 2015 | Permit id: 612647 |