Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 72 Installation of heat pump- add 2 heat systems to permit on 8 2 2012 awatson per stanley smith Date: July 17, 2012 Contractor: Clarence W. Blount Permit type: Hvac | Permit status: Issued | Permit id: Bm-201201981 | |||||
SCORE 86 Electrical work-repair cut wires Date: June 29, 2012 Contractor: E And D Electric Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201205259 | |||||
Constituent is working out of the scope of work. Stop work order is being enforced and has been posted at the job site per santo bowles. Absolutely no inspections should be made until the current building permit has been revised. Please see ann heard for further details. Date: May 31, 2012 Permit type: Na | Permit status: No violation found | Permit id: 12cap-00000511 | |||||
SCORE 86 Electrical work-rewire due to vandalism Date: May 17, 2012 Contractor: Gerald Electric Services Permit type: Electrical | Permit status: Issued | Permit id: Be-201204025 | |||||
SCORE 86 Residential single family general repair, re-roof repairs (non structural), paint interior, gutters (replace repair), repair existing holes in the drywall only (maxmium 3 sheets replacement), pull up & replace carpet, hard wood, or tile flooring (no structural work), deck, repair existing deck or porch (boards only no structural work), bath & kitchen cabinets countertops (repair replace existing). Date: May 11, 2012 Contractor: Mecca Development Permit type: Repair | Permit status: Issued | Permit id: Bb-201202334 | |||||
Working without permits Date: May 1, 2012 Permit type: Na | Permit status: No violation found | Permit id: 12cap-00000393 |