Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Electrical Date: November 1, 2011 Contractor: Dennis Bovey Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11041-90000-233 | |||||
SCORE 96 Replace 8 window(s). Same size, location, number, type. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11016-90000-216 | |||||
SCORE 99 Electrical Date: December 15, 2013 Contractor: Haim Ezra Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-90000-348 | |||||
SCORE 61 Pv1, roof-mounted 5. 4kw dc photovoltaic system installation with trans Date: November 27, 2013 Contractor: Tanami Shiri Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-312 | |||||
SCORE 100 Re-roof (partial) with class a or b material weighing less than 6 poun Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13016-20000-247 | |||||
SCORE 96 Add sill plate anchors bolts and cripple wall plywood per l. A. City st Permit type: Bldg-alter/repair | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16016-90000-260 | |||||
SCORE 89 Bathroom remodel for residential buildings (no structural changes). Permit type: Bldg-alter/repair | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16016-20000-290 | |||||
SCORE 86 Structural foundation repair at (e) sfd; slab replacement, partial fo Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16016-10000-243 |