Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 To remove the top layer of roofing and to provide and install a new single-ply epdm (rubber)roof system. To remove the old gutter and to replace it with a new copper gutter. All work to be done on the main roof. Client: Chin Lillian E | Permit type: Roofing | Permit status: Open | Current use: 1-2fam | Permit id: Sf531445 | Parcel: 0501116000 | |||||
SCORE 93 On the fire escapes remove all loose brick and reinstall new. Remove existing caulking and apply new. Remove all rotten wood around five windows and reinstall new wood. Powerwash building. All work cannot be seen from a public way. Client: Chin Lillian E | Permit type: Interior/exterior work | Current use: 1-2fam | Permit id: Sf163997 | Parcel: 501116000 | |||||
SCORE 100 To remove the top layer of roofing and to provide and install a new single-ply epdm (rubber)roof system. To remove the old gutter and to replace it with a new copper gutter. All work to be done on the main roof. Client: Chin Lillian E | Permit type: Short form bldg permit | Expiration date: April 22, 2016 | Current use: 1-2fam | Permit id: Sf531445 | Parcel: 0501116000 | |||||
SCORE 93 On the fire escapes remove all loose brick and reinstall new. Remove existing caulking and apply new. Remove all rotten wood around five windows and reinstall new wood. Powerwash building. All work cannot be seen from a public way. Client: Chin Lillian E | Permit type: Short form bldg permit | Expiration date: January 19, 2013 | Current use: 1-2fam | Permit id: Sf163997 | Parcel: 0501116000 |