Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 Up to three temporary well points (mw-f, mw-g, mw-h) will be installed to delineate the extent of light non-aqueous phase liquid (lnapl). One well point will be installed within district public property, in the area east of exiting wells mw-b and mw-c. At the request of ddoe, two points will be installed on the adjacent rock creek park property, to the west (since work associated with the construction of these wells will not impede sidewalk access and will not be located on the adjacent sidewalk, these wells will not be located withing district public space). However, for your reference, all three proposed wells are shown on the uploaded site plan and tcp, but this request is for the construction of one well. After each location is cleared for the presence of underground utilities, a boring will be advanced. A track-mountd geoprobe direct push rig, equipped with air rotary capabilities will be used. Temporary monitoring wells will be installed at each location to a depth of approx. 35 Date: May 27, 2014 Contractor: Gene Burke Client: Glen Rosenberg, Vp And General Counsel | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 25, 2014 | Permit id: Pa92713-R1 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Notpaid | Expiration date: July 30, 2016 | Permit id: 0 | |||||
SCORE 92 Construction staging area Date: May 9, 2016 Contractor: Flippo Construction Joe Marchio Permit status: Expired | Expiration date: June 4, 2016 | Permit id: Pa10250712 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Notpaid | Expiration date: October 17, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Flippo Construction Permit status: Notpaid | Expiration date: February 17, 2017 | Permit id: 0 | |||||
SCORE 93 Up to three temporary well points (mw-f, mw-g, mw-h) will be installed to delineate the extent of light non-aqueous phase liquid (lnapl). One well point will be installed within district public property, in the area east of exiting wells mw-b and mw-c. At the request of ddoe, two points will be installed on the adjacent rock creek park property, to the west (since work associated with the construction of these wells will not impede sidewalk access and will not be located on the adjacent sidewalk, these wells will not be located withing district public space). However, for your reference, all three proposed wells are shown on the uploaded site plan and tcp, but this request is for the construction of one well. After each location is cleared for the presence of underground utilities, a boring will be advanced. A track-mountd geoprobe direct push rig, equipped with air rotary capabilities will be used. Temporary monitoring wells will be installed at each location to a depth of approx. 35 Date: April 29, 2014 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: June 26, 2014 | Permit id: Pa92713 | |||||
SCORE 82 Construction staging area Date: February 10, 2016 Contractor: Mike Elyussif Permit status: Permit expired | Expiration date: March 18, 2016 | Permit id: Pa10229283 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Not paid | Expiration date: October 17, 2016 | Permit id: 0 | |||||
SCORE 92 Construction staging area Date: September 12, 2016 Contractor: Flippo Construction Joe Marchio Permit status: Permit expired | Expiration date: October 18, 2016 | Permit id: Pa10334657 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Not paid | Expiration date: July 30, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Flippo Construction Permit status: Not paid | Expiration date: February 17, 2017 | Permit id: 0 | |||||
SCORE 70 Up to three temporary well points (mw-f, mw-g, mw-h) will be installed to delineate the extent of light non-aqueous phase liquid (lnapl). One well point will be installed within district public property, in the area east of exiting wells mw-b and mw-c. At the request of ddoe, two points will be installed on the adjacent rock creek park property, to the west (since work associated with the construction of these wells will not impede sidewalk access and will not be located on the adjacent sidewalk, these wells will not be located withing district public space). However, for your reference, all three proposed wells are shown on the uploaded site plan and tcp, but this request is for the construction of one well. After each location is cleared for the presence of underground utilities, a boring will be advanced. A track-mountd geoprobe direct push rig, equipped with air rotary capabilities will be used. Temporary monitoring wells will be installed at each location to a depth of approx. 35 Date: March 6, 2014 Contractor: Gene Burke Client: Glen Rosenberg, Vp And General Counsel | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: June 26, 2014 | Permit id: Pa92713 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Notpaid | Expiration date: July 30, 2016 | Permit id: 0 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Notpaid | Expiration date: October 17, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Flippo Construction Permit status: Notpaid | Expiration date: February 17, 2017 | Permit id: 0 | |||||
SCORE 93 Construction staging area Date: May 1, 2014 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: September 23, 2014 | Permit id: Pa10133086 | |||||
SCORE 100 Construction staging area Date: June 3, 2015 Contractor: Dcwater Cip Permit status: Permit expired | Expiration date: June 27, 2015 | Permit id: Pa10189333 | |||||
SCORE 86 Construction staging area Date: July 23, 2015 Contractor: Flippo Construction Permit status: Permit expired | Expiration date: August 28, 2015 | Permit id: Pa10200087 | |||||
SCORE 82 Construction staging area Date: March 25, 2016 Contractor: Mike Elyussif Permit status: Permit expired | Expiration date: April 27, 2016 | Permit id: Pa10234666 | |||||
SCORE 86 Construction staging area Date: January 11, 2016 Contractor: Flippo Construction Permit status: Permit expired | Expiration date: February 10, 2016 | Permit id: Pa10225012 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Not paid | Expiration date: July 30, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: October 14, 2016 Contractor: Dcwater Cip Permit status: Permit expired | Expiration date: November 17, 2016 | Permit id: Pa10347710 | |||||
SCORE 92 Construction staging area Contractor: Flippo Construction Joe Marchio Permit status: Not paid | Expiration date: October 17, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Flippo Construction Permit status: Not paid | Expiration date: February 17, 2017 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: February 21, 2017 Contractor: Flippo Construction Permit status: Permit expired | Expiration date: March 19, 2017 | Permit id: Pa10374734 |