Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Complete renovation of the first floor. A part of wall between hall area and living room to be opened according to architectural plan (attached). Existing kitchen to be relocated in a new place. All exterior walls to be exposed to the studs, insulated with a fiberglass insulation. Blueboards to be installed, plastered and painted. Existing bathroom to be completely re-done. A new tub, vanity, bathroom sink, toilet to be installed. New hardwood flooring to be installed in all rooms. Bathroom floor to be tiled. Walls surrounding new tub in bathroom to be tiled up to the ceiling. All apartment electrical circuitry to be re-wired and upgraded according to the current electric code. Recessed lights to be installed in kitchen/living room area. Two new electric panels (one for unit #1 and another for common area) to be installed in basement area. All new plumbing for new kitchen and bathroom to be installed. Three energy efficient windows to be installed replacing existing single pane windows Date: June 25, 2015 Value: $183,500 Permit type: Addition/alteration | Completion date: July 7, 2015 | Current use: Two-family | Parcel: 9073 | |||||
Replacement of existing two story deck with a new one. First floor part is going to be enclosed, insulated, windows installed and finished both sides, interior and exterior. Rubber roof to be installed, and a floating deck to be built on top of the roof. The new construction will be attached to the existing house structure and resting on three sonar tube pillars. New wiring to be installed in the first floor addition for light fixtures and receptacles. Hardwood flooring to be installed. Date: August 20, 2015 Value: $46,600 Permit type: Addition/alteration | Completion date: August 28, 2015 | Current use: Two-family | Parcel: 9073 | |||||
SCORE 96 Complete removal and replacement of siding Permit type: Siding | Completion date: November 19, 2015 | Parcel: 9073 | |||||
SCORE 96 Removal and full replacement of siding Permit type: Siding | Completion date: January 5, 2016 | Parcel: 9073 | |||||
SCORE 63 Complete renovation of the first floor. A part of wall between hall area and living room to be opened according to architectural plan (attached). Existing kitchen to be relocated in a new place. All exterior walls to be exposed to the studs, insulated with a fiberglass insulation. Blueboards to be installed, plastered and painted. Existing bathroom to be completely re-done. A new tub, vanity, bathroom sink, toilet to be installed. New hardwood flooring to be installed in all rooms. Bathroom floor to be tiled. Walls surrounding new tub in bathroom to be tiled up to the ceiling. All apartment electrical circuitry to be re-wired and upgraded according to the current electric code. Recessed lights to be installed in kitchen living room area. Two new electric panels (one for unit #1 and another for common area) to be installed in basement area. All new plumbing for new kitchen and bathroom to be installed. Three energy efficient windows to be installed replacing existing single pane windows Permit type: Addition/alteration | Completion date: July 7, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 9073 | |||||
SCORE 63 Replacement of existing two story deck with a new one. First floor part is going to be enclosed, insulated, windows installed and finished both sides, interior and exterior. Rubber roof to be installed, and a floating deck to be built on top of the roof. The new construction will be attached to the existing house structure and resting on three sonar tube pillars. New wiring to be installed in the first floor addition for light fixtures and receptacles. Hardwood flooring to be installed. Permit type: Addition/alteration | Completion date: August 28, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 9073 |