Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: July 6, 2011 Client: Termini Vincent | Permit status: Completed | Permit id: 349085 | |||||
Electrical permit Date: August 5, 2013 Client: Termini Vincent | Permit status: Expired | Permit id: 487170 | |||||
Alteration permit Date: May 10, 2013 Client: Termini Vincent | Permit status: Completed | Permit id: 470515 | |||||
Electrical permit Date: August 5, 2013 Client: Termini Vincent | Permit status: Expired | Permit id: 487170 | |||||
Demolition permit Date: November 17, 2016 Client: Termini Vincent | Permit status: Active | Permit id: 737705 | |||||
Alteration permit Date: May 10, 2013 Client: Termini Vincent | Permit status: Completed | Permit id: 470515 | |||||
Mechanical permit Date: July 6, 2011 Client: Termini Vincent | Permit status: Completed | Permit id: 349085 | |||||
SCORE 64 Install 2-water closet, 2-lav, 1-tub, 1-kitchen sink, 1-wash box and 1-dishwasher."self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 8, 2017 Contractor: Hekuran Rrapushaj Client: Marp Prefco Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 806661 | |||||
SCORE 82 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 28, 2017 Contractor: Alb Express Client: Marp Prefco Llc | Permit type: Alteration permit | Permit status: Active | Completion date: June 28, 2017 | Permit id: 795746 | |||||
SCORE 96 Remove existing heater install new 70,0 btu gasfired furnace including all necessary duct work. Date: July 6, 2011 Contractor: Alexander Pitts Client: Marp Prefco Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 5, 2012 | Permit id: 349085 | |||||
SCORE 100 Tear off main roof down to wood deck. Replace sheathing as needed with 3 4 plywood. Install high density fiberboard with fiberglass basesheet and white granulated rubber roof. Install new 4 inch copper eaves box with new 4 inch spouts and new metal flashing. Date: May 10, 2013 Contractor: North American Roofer Inc Client: Marp Prefco Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 470515 | |||||
SCORE 100 100amp service cable, meter socket, circuit panel, 3-1 smoke detectors as per nec 2008 (sfd) Date: August 5, 2013 Contractor: A.M. Electric Inc Client: Marp Prefco Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: August 5, 2013 | Permit id: 487170 | |||||
SCORE 82 Interior demo of non-load bearing walls only,no structural work on this permit Date: November 17, 2016 Contractor: Riverfront Moving And Storage Client: Marp Prefco Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: October 31, 2017 | Permit id: 737705 | |||||
SCORE 82 Renovation of single family dwelling. Replace existing stair. New floors and drywall.(details as shown on the attached plan) Date: December 5, 2017 Contractor: Alb Express Client: Marp Prefco Llc | Permit type: Alteration permit | Permit status: Active | Completion date: December 5, 2017 | Permit id: 816872 |