Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: April 10, 2013 Client: Mc Donald Meghan | Permit status: Completed | Permit id: 464305 | |||||
Mechanical permit Date: April 1, 2013 Client: Mc Donald Meghan | Permit status: Completed | Permit id: 462265 | |||||
Zoning permit Date: March 27, 2013 Client: Mc Donald Meghan | Permit status: Completed | Permit id: 446254 | |||||
Addition permit Date: March 27, 2013 Client: Mc Donald Meghan | Permit status: Completed | Permit id: 446259 | |||||
Plumbing permit Date: April 9, 2013 Client: Mc Donald Meghan | Permit status: Expired | Permit id: 463996 | |||||
Demolition permit Date: February 19, 2013 Client: Mc Donald Meghan | Permit status: Completed | Permit id: 454195 | |||||
Permit for the erection of an addition of third floor living area. Bedroom & bathroom. Addition of roof deck with pilot house to an existing attached single family dwelling size and location as shown on submitted plan. Date: January 16, 2013 Client: Mc Donald Meghan | Applicant: James Speckhals | Permit type: Appeal | Permit status: Granted | Completion date: March 20, 2013 | Permit id: 19698 | |||||
SCORE 96 Addition of third floor living area. Bedroom & bathroom. Addition of roof deck with pilot house to an existing attached single family dwelling size and location as shown on submitted plan. Date: March 27, 2013 Contractor: Doozer Construction Llc Client: Mc Donald Meghan | Permit type: Zoning permit | Permit status: Completed | Completion date: March 27, 2013 | Permit id: 446254 | |||||
SCORE 96 Addition of third floor living area. Bedroom & bathroom. Addition of roof deck with pilot house to an existing attached single family dwelling. Separate permits required for electric; plumbing and mechanical. Date: March 27, 2013 Contractor: Doozer Construction Llc Client: Mc Donald Meghan | Permit type: Addition permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 446259 | |||||
SCORE 96 Demolition of interior drywall on 2nd floor and the removal of roof covering. Removal of front brick facade. Date: February 19, 2013 Contractor: Doozer Construction Llc Client: Mc Donald Meghan | Permit type: Demolition permit | Permit status: Completed | Completion date: April 10, 2013 | Permit id: 454195 | |||||
SCORE 91 Install one 45,0 btu hvac unit (sfd) Date: April 1, 2013 Contractor: Igor Sourotkine Client: Mc Donald Meghan | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 462265 | |||||
SCORE 100 Replace waste and water line set fixture 1-wc, 1 bath tub, 1 lav sink, 1 kit sink Date: April 9, 2013 Contractor: Norman Cole Sr, Client: Mc Donald Meghan | Permit type: Plumbing permit | Permit status: Expired | Completion date: December 6, 2015 | Permit id: 463996 | |||||
SCORE 88 12 lights 14 outlets 4 co smokes detectors, 8 switches per 2008 nec (sfd) Date: April 10, 2013 Contractor: All Circuits Electrical Contr Client: Mc Donald Meghan | Permit type: Electrical permit | Permit status: Completed | Completion date: September 30, 2013 | Permit id: 464305 |