Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: April 29, 2014 Contractor: A S I Hastings Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2014-Resalt- | |||||
SCORE 86 Ground mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 18, 2013 Contractor: Eriksson Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 279-091-21-00 | |||||
SCORE 100 Repair fire damaged sfd - - replace studs, drywall, & exterior siding (104 sqft) in family rm & replace exterior walls (39 lf) in upstairs bedroom. Also doing work not associated w fire damage which includes - - roof re-structure for entire sfd (23 sqft), adding 363 sqft to sfd, 27 lf of interior partitions, remove & replace existing windows (92 sqft), remove & replace interior stair railing, remove chimney, new fau & new water heater in attic, misc electrical, plumbing, & mechanical. Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1004-20 | Parcel: 279-091-21-00 |