Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Active | Permit id: 682347 | |||||
New construction permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Active | Permit id: 653423 | |||||
Mechanical permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Active | Permit id: 686769 | |||||
Zoning/use permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Completed | Permit id: 630737 | |||||
Electrical permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Completed | Permit id: 728144 | |||||
Administrative permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Completed | Permit id: 748432 | |||||
Zoning use permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Completed | Permit id: 630737 | |||||
Administrative permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Active | Permit id: 733912 | |||||
Plumbing permit ![]() Client: Frankford Stacks Lp | Client Company: Robert Shaw | Permit status: Completed | Permit id: 730912 | |||||
SCORE 96 Temporary certificate of occupancy for unit 2c only. ![]() ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 749503 | |||||
SCORE 100 250amp service with 4 meters,100amp subpanel each apt,100amp house panel,75 recessed fixtures,1 tamper proof receptacles,interconnect smokes,carbon dioxide detectors,9 phones and 9 cables per 2008m nec (triplex)install fire alarm ![]() ![]() Permit type: Electrical permit | Permit status: Completed | Completion date: January 9, 2017 | Permit id: 728144 | |||||
SCORE 87 For the installation of hvac system to include register diffusers, supply exhaust ductwork, appliances, kitchenhood exhaust fans, and all other work as per approved plans. Separate permit required for any mep and fire suppression work. See ap#702367 for plans. ![]() ![]() Permit type: Mechanical permit | Permit status: Completed | Completion date: March 9, 2017 | Permit id: 716689 | |||||
SCORE 87 The installation of three high efficency 96%, two stage, multispeed, 40k btu, gas furnaces with evaportor coils and 1. 5 condensers. (all units and ductwork self-contained within tenant space. No penetrations through rated assemblies) ![]() ![]() Permit type: Mechanical permit | Permit status: Completed | Completion date: January 9, 2017 | Permit id: 686769 | |||||
SCORE 100 Installation of automatic sprinkler system with two inch (2") fire service line, backflow prevention device and fire department connection in accordance with nfpa 13 throughout a four (4) story structure with roof decks. Separate permits required for all electrical and plumbing work. See permit # 681649 for plan. ![]() ![]() Permit type: Suppression permit | Permit status: Completed | Completion date: January 9, 2017 | Permit id: 682347 | |||||
SCORE 96 For the new construction of a four (4) story structure as per plans. Separate permits required for mechanical, electrical, plumbing and fire suppression system. Sprinkler head shall be positioned in the center of bay windows the fire alarm system shall included strobe and horn on the roof deck per bbs variance no. 26167. Part of unity of use as per approved zoning. See application 638741 for plans ![]() ![]() Permit type: New construction permit | Permit status: Completed | Completion date: March 7, 2017 | Permit id: 653423 | |||||
SCORE 96 Foundations only as per plans. See permit # 638745 for plans ![]() ![]() Permit type: New construction permit | Permit status: Completed | Completion date: February 21, 2017 | Permit id: 644091 | |||||
Relocation of lot lines to create (4) lots from (1) lot. Unity of use. ![]() Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 24, 2015 | Permit id: 630737 | |||||
SCORE 96 Temporary certificate of occupancy for units 2a,2b and 2c only. ![]() ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: March 9, 2017 | Permit id: 733912 | |||||
SCORE 96 Temporary certificate of occupancy for unit 2b only. ![]() ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: January 9, 2017 | Permit id: 748432 | |||||
SCORE 93 Excavate and install new sewer line and water line ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: January 9, 2017 | Permit id: 730912 | |||||
Plumbing permit ![]() Client: Frankford Stacks Lp | Permit status: Active | Permit id: 673687 | |||||
Plumbing permit ![]() Client: Frankford Stacks Lp | Permit status: Active | Permit id: 673687 | |||||
SCORE 93 New construction: interior plumbing of a 4-story bldg. With (3) dwelling units. The installation will comply with the philadelphia plumbing code 2004. A separate permit is required for the 6" combination sewer and the 2" domestic water service to the street mains. Fuel gas piping and equipment is not included in this permit. ![]() ![]() Client: Frankford Stacks Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 7, 2017 | Permit id: 673687 |