Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Provide 5 dedicated amp circuit on 6 plugs and added subpanel of amps with 8 recess lights on sensor switch in existing multi-purpose room for redwood apts. Date: October 8, 2013 Contractor: A B T Electric Permit status: Finaled | Permit id: B13-4033 | |||||
SCORE 56 New accessible pedestrian ramp & stairs to existing multi-purpose room at redwood park apartments. Note: design review approved by noah housh under aed no loss of parking or tree removals. Date: August 27, 2013 Contractor: Robert South Architect Permit status: Issued | Permit id: B13-2845 | |||||
SCORE 86 At clubhouse install approx of 3 4" gas piping overhead in pool equipment room. Stub gas piping out through wall and run underground approx ft of poly yellow gas piping to outdoor bbq. Date: May 11, 2015 Contractor: Mapleservice Of Santa Rosa Inc Permit type: Non-residential plumbing | Permit status: Issued | Current use: Non-residential | Permit id: B15-1997 | Parcel: 034021012 | |||||
SCORE 100 Replace gallon nat gas water heater in outside closet Date: October 2, 2014 Contractor: North Coast Energy Services Incorporated Permit status: Finaled | Permit id: B14-3972 | |||||
SCORE 96 Replace air conditioner condensor and coil payne pa13nr018-13 seer; 18,0 btus. Date: August 14, 2012 Contractor: Lunt Heating And Air Conditioning Inc Permit status: Finaled | Permit id: B12-2799 |