Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Install new 2ton system with 8kw electric heat and one 3. 5 ton system with 15kw electric heat. Permit type: Mechanical hvac | Permit status: Permit issued | Current use: Single family | |||||
SCORE 59 Construct 2-story addition to existing single-family dwelling as per plans. Permit type: Renovation (structural) | Permit status: Permit approval letter | Current use: Single family | |||||
SCORE 84 Wire 2nd story addition Date: July 25, 2016 Contractor: Elbred R. Malone Jr Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Current use: Single family | |||||
SCORE 66 Construct 2-story addition to existing single-family dwelling as per plans. Permit type: Renovation (structural) | Permit status: Certificate of occupancy | Current use: Single family | |||||
SCORE 98 Gas line 2-wh danny866-7162 ck3521 Date: November 17, 2016 Contractor: Daniel Lambert Client: Joseph A Aluise | Permit type: Mechanical fuel gas | Permit status: Certificate of completion | Current use: Unknown | |||||
SCORE 79 Cell site for mo0367 (17-32985-rstc) at 20 cadiz street Date: November 1, 2017 Contractor: Joint Use Engineering James Eric Deville Permit type: Change of address | Permit status: Permit issued | Current use: Business use | |||||
SCORE 84 Adding electrical non metered service to entergy electrical pole for cell site Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Current use: Business use |