Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Furnish and installl 1 new remote stobe panel, 2, new fire life safety device, tie existisng strobes Current use: Office | Permit id: 200412030655 | |||||
Build out of data storage suite with raised floor libert floor cooling units electrical room and roof coolers mounted on (e)steel platform. Sprinkler system previous & fire alarm revision under seperate applications. Date: December 15, 2005 Current use: Warehouse no fr | Permit id: #200512150462 | |||||
SCORE 89 Provide submit as built drawings for appl#200412030655 bldg. Is 5 stories not 3 stories on original Current use: Office | Permit id: #200507137490 | |||||
SCORE 96 Modification to existing sprinkler system 4 add ssu. Add new system under floor = 83 ssu. Change to a preaction system. Current use: Office | Permit id: #200610124781 | |||||
SCORE 100 1st floor - tenant improvement on 1 f new data center and electrical room. Current use: Warehouse no fr | Permit id: #200608179759 | |||||
SCORE 100 Install pre-action detection in computer room and electrical room on 1st floor. And audibles in computer room on 1st floor. Current use: Office | Permit id: #200611077009 | |||||
SCORE 100 Addition of monitor modules for interface into a new pre-action systrem (by others) for the building d suite 160. Current use: Office | Permit id: #200611077014 | |||||
SCORE 99 1 new diesel generator in service yard. No other work under this permit. Date: November 29, 2006 Contractor: Undecided Undecided Current use: Warehouse no fr | Permit id: #200611298692 | |||||
SCORE 100 1 new diesel generator in service yard. No other work under this permit. Current use: Warehouse no fr | Permit id: #200611298692 | |||||
SCORE 100 Install pre-action detection system & audigies for the equipment and electrical room. No office increase. Current use: Office | Permit id: #200602144556 | |||||
SCORE 94 Add 4 vesda smoke sampling detyector unit in an existing server electricalroomand the each unit to the suites preaction detection system Current use: Office | Permit id: #200602215006 | |||||
SCORE 98 Expansion to (e) pre action system. Relocate valve assembly. Underfloor protection. 88 new sprinklers. No increase in size. Current use: Office | Permit id: #200602235216 | |||||
SCORE 67 Build out of data storage suite with raised floor libert floor cooling units electrical room and roof coolers mounted on (e)steel platform. Sprinkler system previous & fire alarm revision under seperate applications. Current use: Warehouse no fr | Permit id: #200512150462 | |||||
SCORE 100 Add 2 monitor modules for interface into pre-action system for suite #103. The pre-action system is provided by others under a seperate permit. A relay module is also being added for fsd closure. These fsds are being installed with the pre-action project. Current use: Office | Permit id: #200605020385 | |||||
Tenant improvement on 1 f new data center and electrical room. Date: August 17, 2006 Current use: Warehouse no fr | Permit id: #200608179759 | |||||
SCORE 67 Alter raised floor design from pedestals w 4 base plates anchored to concrete to 6 bases using adhesive w max stress ratio of 32. 74% change live load to 1 psf resubmit design for equipment platform (steel) on roof rev. To approved building pa#2005 12 15 0462 Current use: Warehouse no fr | Permit id: #200609011303 | |||||
SCORE 100 Install underground trenchen for electrical raceway for (10) new light poles. Light poles 25-0 high. Work on (e) parking lot. Plus paving trench hole. Current use: Parking lot | Permit id: #200710165512 | |||||
SCORE 62 Construct new interior walls for new data center. Installation of ac units mounted to the floor. Installation of one new diesel generator and one diesel fuel storage tank for the generator outside of the building. Current use: Office | Permit id: #200709102184 | |||||
SCORE 77 Installation of support for electrical equipment on concrete slab 3rd floor (all equipment under seperate permit) Current use: Phone xchnge/eq | Permit id: #200712200962 | |||||
SCORE 100 Install preaction detection and control system for suite 106 and electrical room Current use: Office | Permit id: #200706143928 | |||||
SCORE 100 Install 2 monitor modules in suite 106 for pre action sprinkler system Current use: Office | Permit id: #200706275233 | |||||
SCORE 99 New generator (diesel) in service yard. No other work with this permit. Current use: Warehouse no fr | Permit id: #200706275284 | |||||
SCORE 100 Suite #106 - modification to existing sprinkler system and over head. Add sub-floor fire protection. Overhead ssu=115. Sub floor ssu=79. Separate permit - fire alarm connection. Current use: Office | Permit id: #200706295620 | |||||
SCORE 100 Gdround floor & roof constuct new data center chillers on roof new electick room generator on seperate permit Current use: Antenna | Permit id: #200705181770 | |||||
SCORE 100 Erect a non-electric wall single faced non-illluminated new sign Current use: Office | Permit id: #200801092132 | |||||
SCORE 100 Alteration to existing fire sprinkler system add ssp heads under new 7-6 wide 18 deep duct. Current use: Phone xchnge/eq | Permit id: #200810164358 | |||||
SCORE 56 Bldg d - install new condenser unit on the roof and connect toex. Chillea water system. Install unit struct cover over ex. Chillea water pumps. Connect new condenser to ex. Electrical disconnect. Current use: Phone xchnge/eq | Permit id: #200807015761 | |||||
SCORE 100 Ti for the 5th floor. Remove (e) work stations and build 5 offices. Lighting mechanical and electrical work will be under separate permits. Current use: Office | Permit id: #200802255441 | |||||
SCORE 62 Revision to appl #200709102184 to existing 1. 25 mega watt generator to be replaced with new 2 mega watt generator #9. Current use: Office | Permit id: #200803197464 | |||||
SCORE 67 Addition of 1-20 kw generator and belly tank. Concrete pad for generator add breaker (e) switch gear for generator. Conduit and bus duct from generator to gear Current use: Office | Permit id: #200804280768 | |||||
SCORE 98 1) furnish and install ton glycol liebert unit on 3rd floor 2) tap into (e) glycol lines 3) rework supply and drain lines as needed liebert model #dh267w with seismic floor stand. Current use: Office | Permit id: #200804300919 | |||||
SCORE 100 Ti for fire sprinkler detection on the 2nd floor. Modify the ex. Pre-action detection in new ups room for correct coverage Current use: Office | Permit id: #200805283013 | |||||
Install new condenser unit on the roof and connect toex. Chillea water system. Install unit struct cover over ex. Chillea water pumps. Connect new condenser to ex. Electrical disconnect. Date: July 1, 2008 Current use: Phone xchnge/eq | Permit id: #200807015761 | |||||
SCORE 100 Alteration to existing fire sprinkler system. Add 11 ssp heads under ducts in co-locate room 80108. Relocate 6 ssu heads to obtain ordinary hazard occupancy with 1 sf max spacing in room 80101 Current use: Phone xchnge/eq | Permit id: #200901079695 | |||||
SCORE 100 Alteration of data and electric rooms on 4th fl of bldg f . Replace partial roof top mechanical electrical equipment with new structural supports replace (1) generator in existing generator yard. Fire alarm & sprinklers under separate permit. Current use: Warehouse no fr | Permit id: #200907233307 | |||||
SCORE 95 Data center upgrade phase ii - new chiller w struct roof platform no change to exist bldg. Current use: Office | Permit id: #200911181597 | |||||
3rd floor & roof data center upgrade - new (hvac) chillers & ups struct roof platform new work is tenant upgrade improvement no change to existing bldg. Date: May 28, 2009 Value: $500,000 Current use: Office | Permit id: #200905289249 | |||||
SCORE 65 Construct steel support rack for new battery installation. 3rd floor utility room Current use: Office | Permit id: #201001144765 | |||||
SCORE 100 Addition of a relay module in the north elevator machine rm to activate a flashing firefighters hat led in the north elev car. The raly will send a signal to the car upon an alarm condition from the existing smoke detrctors in the e. M. R Current use: Warehouse no fr | Permit id: #201011094653 | |||||
SCORE 100 Revision to pa# 2009-0723-3307-per field conditions revise 2 hour rated construction to match (e) 1 hour rated construction Current use: Warehouse no fr | Permit id: #201002086130 | |||||
SCORE 100 Rev. To pa# 2009. 07. 23. 3307. Revise structural steel lay out for roof top equipment Current use: Warehouse no fr | Permit id: #201002237020 | |||||
SCORE 100 4th floor. Revise (e) sprinkler system (overhead)-add 2 new sprinkler systems to subfloor. All systems are to be preaction 4 & wet system in corridor. 3 new pre-action sys. 1 exist preaction sys valve (connect new pipe). 1 wet pipe riser (386 sprinkler); demo exist pipe in area. Current use: Phone xchnge/eq | Permit id: #201003128094 | |||||
SCORE 100 4th floor-design & install 2 pre-action dectection & control systems within suites #402 & 403 Current use: Office | Permit id: #201004130124 | |||||
SCORE 100 4th floor - addition of 3 monitor modules and relocate 2 monitor modules 1 control relay module for drt suites 402 & 403 on 4th fl. Monitor modules will be used to interface 2 new pre-action systems and sprinkler waterflow tampes switches into (e) fire alarm system. Current use: Office | Permit id: #201004291345 | |||||
SCORE 99 Install 1-225a 208 120v panel fed from (e) service. Install (8)l21- receptacles & (24)l6- receptacles. Current use: Office | Permit id: #201005061878 | |||||
SCORE 99 Install above ground storage tank permit Date: May 11, 2010 Contractor: J. Jones M. Lynch S. Aubert Edgar Ramos Current use: Phone xchnge/eq | Permit id: #201005112195 | |||||
SCORE 88 Astound generator upgrade at 2 paul ave. Current use: Office | Permit id: #201007066004 | |||||
SCORE 99 Added generator details as per fire permit inspector reference # pa 2009. 07. 23. 3307 Current use: Warehouse no fr | Permit id: #201007156718 | |||||
SCORE 100 4th floor-addition of 1 smoke detector & 1 relay module for the corridor door holders installed at an entrance door Current use: Office | Permit id: #201007196883 | |||||
SCORE 77 To obtain final inspection for work approved under pa # 200712200962. All work completed. Current use: Phone xchnge/eq | Permit id: #201008209211 | |||||
SCORE 95 3rd floor:revision to 200911181597: reduce scope of work. No chillers no pumps no structural platform Current use: Office | Permit id: #201107220882 | |||||
SCORE 100 Work occurs on partial (e) 4th flr interior improvement includes non bearing partitions raised access floor ceilings mechanical electrical plumbing and fire protection. Current use: Office | Permit id: #201108162518 | |||||
SCORE 100 Add 93 fire sprinklers and new 4 main to extg sprinkler system on the 4th floor fed from an existing fire pump. Pre action system Current use: Office | Permit id: #201111148836 | |||||
SCORE 100 Revision to 201108162518. Install 5 new 45 minute fire rated window systems along existing 1 hr rated fire partition which separates the existing office space from data center space Current use: Office | Permit id: #201112090429 | |||||
SCORE 100 Install server racks on the 4th floor data room. Ti approved under pa #201108162518. Current use: Office | Permit id: #201112271341 | |||||
SCORE 95 Astound revision to supply pump location. Supply pump to be relocated from generator enclusure to staionary fuel tank. Install electrical and low voltage conduits and wires per drawings. Revision to app#201007066004 Current use: Office | Permit id: #201102079737 | |||||
SCORE 100 New battery room within existing mechanical room new electrical room modification to metal canopy d. A. Upgrades. Note: separate battery system operation permit required from sffd Current use: Office | Permit id: #201108122415 | |||||
SCORE 100 4th floor: demo (e) non structural walls doors. Remove & store (e) fences & gates. Remove & store (e) mechanical equipment. Remove electrical plumbing duct work associated with equipment Current use: Office | Permit id: #201108162530 | |||||
SCORE 99 Reroofing Current use: Office | Permit id: #201108182704 | |||||
SCORE 100 Provide hvac for ups & pdu room. Date: September 8, 2011 Contractor: Southland Industries Current use: Office | Permit id: #201109084102 | |||||
SCORE 100 4th floor-change server room to office space. Pre action above ceiling to stay. Add 85 smoke detectors to drop ceilings. 15 horn strobes 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel. Current use: Office | Permit id: #201109215144 | |||||
New entry lobby with security desk interior upgrade finishes & fixtures. New exterior cladding higher parpapet walls aluminum panel & stucco. Date: January 11, 2012 Current use: Office | Permit id: #201201112043 | |||||
SCORE 100 Ref pa# 2012-06-18-2762 issued 6-22-12. Combining pre-action systems for room 402 & 403 into (1) preaction system-lev 4 for t. I. @ subfloor & overhead piping. Date: October 4, 2012 Contractor: Theodore Robert Vinther Current use: Office | Permit id: #201210041298 | |||||
SCORE 100 Addition of 1 smoke detector 2 duct detectors 3 monitor modules 1 relay mdule 3 strobes for mmr remodels on floor 2 and 3. All new devices connect onto fire alarm system Current use: Office | Permit id: #201211053475 | |||||
SCORE 100 Combining preaction systems fro rooms #colo 402 & #colo 403 into (1) preaction system @ lev 4 t. I. @ subfloor & overhead piping. Revision to appln #201210041298. Date: November 19, 2012 Contractor: Theodore Robert Vinther Current use: Office | Permit id: #201211194510 | |||||
SCORE 100 Addition of 1 smoke detector 1 monitor module 1 central modul for 2nd fire alarm permit on the mmr retrofit project on floors 2 and 3. Initial work under 201211053475 Current use: Office | Permit id: #201212146200 | |||||
SCORE 100 Install new door & associated framing install 2 new computer room air conditioning relocate 1 9e) crac install supplemental steel platform to accomodate the footprint of the condenser seismic anchorage. Relocate vfds. Current use: Office | Permit id: #201202174415 | |||||
SCORE 86 New entry lobby with security desk interior upgrade finishes & fixtures. New exterior cladding higher parpapet walls aluminum panel & stucco. Current use: Office | Permit id: #201201112043 | |||||
SCORE 100 4 f #402 & #403- relocate 2 devices & re-program (e) pre-action detection system Current use: Office | Permit id: #201206072046 | |||||
SCORE 99 Demo demising wall separating suite 402 and 403 to form a single suite. Current use: Office | Permit id: #201206182762 | |||||
SCORE 100 Addition on 1 heat detector (on floor 2) and 1 relay module for firefighters hat signal under the south elevator machine room. Upgrade on the roof level. All devices connect onto the fire alarm system. Current use: Office | Permit id: #201208036453 | |||||
SCORE 100 Fire sprinkler tenant improvement. Add 4 upright sprinkler heads at room 207a 2nd fl. Add 5 upgright sprinkler heads at room 312a 3rd fl Current use: Office | Permit id: #201208157423 | |||||
SCORE 100 Revision to consist of reconfiguration of the new entrance into the data center and relocation of one crac unit. Ref app#201202174415 Current use: Office | Permit id: #201301077328 | |||||
Ste d160: revision to pa# 2012-0217-4415 to fill in shear wall including structural plans. Date: January 11, 2013 Value: $1,500 Current use: Office | Permit id: #201301117762 | |||||
SCORE 100 Site demolition & partial building b. Demolition regrading site for new vehicular road. New wood shear wall with cement plaster finish as in fill at the end of truncated building b. New 26 high acoustic wall around west end of future generator group & landscaping. Compliance with ordiance no Current use: Warehouse no fr | Permit id: #201310229889 | |||||
Replacement of the entire fire alarm system for the building. Date: October 24, 2013 Current use: Office | Permit id: #201310240087 | |||||
SCORE 100 Addition of 1 relay module 1 horn strobe 4 strobes for security office remodel floor 1. All new devices connect onto fire alarm system. Ref. Permit app#201308083798. Current use: Office | Permit id: #201310280322 | |||||
Add (1) one smoke detector to existing data center for pre-action releasing detector added due to lack of coverage Date: November 4, 2013 Current use: Office | Permit id: #201311041046 | |||||
SCORE 98 1st floor. Add relocate & remove fire sprinkler heads per ti. 2 add 11 relocate & 1 remove. Pa#2013-0808-3798. Current use: Office | Permit id: #201311202343 | |||||
SCORE 100 Replacement of the entire fire alarm system for the building on a like-for-like basis per the csfm code interpretation 12-001. The replacement system does not meet correct codes. Current use: Office | Permit id: #201310240087 | |||||
SCORE 100 Revision to app#201308083798. Mechanical and electrical drawings to change and update the engineers of record. Current use: Office | Permit id: #201312174361 | |||||
SCORE 96 Project involves intallation of 8 server racks inside an extg data center. Seismic supports will be installed for the server rack and the overhead cable tray. One door will be installed. All power for server racks will be powered from extg panels. Date: March 28, 2013 Contractor: Eric Hoffman Current use: Office | Permit id: #201303283308 | |||||
SCORE 74 Install new 10 pvc c9 privtae main fire underground tie in all existing appurtenances and abandon existing 10 fire main in place- include 1 hydarnt and 6 sprinkler underground. Current use: Phone xchnge/eq | Permit id: #201306068865 | |||||
SCORE 100 New generator pad at exterior of 2 paul ave. Current use: Office | Permit id: #201306109049 | |||||
SCORE 100 Installation of new generator. Generator pad under permit #2013-0610-9049. Current use: Office | Permit id: #201307151840 | |||||
SCORE 100 Bldg. D - flr 1:addition of 3 modules for monitoring of new generator at building d. New devicesconnect onto fire alarm system. (pa ref#201307151840) Current use: Office | Permit id: #201308023388 | |||||
1st floor mezzanine & roof top renovation & expansion of (e) entry lobby. Renovation of (e) bathrooms & facade. New driveway entry portal structure. Replace (e) roof top screens. Remove (e) secondary entry exterior canopy structure Date: August 8, 2013 Value: $1,500,000 Current use: Office | Permit id: #201308083798 | |||||
SCORE 100 Revision to 201306109049: number and size of generator anchors shown on previous permit dwgs Current use: Office | Permit id: #201308093913 | |||||
SCORE 100 1st floor mezzanine & roof top renovation & expansion of (e) entry lobby. Renovation of (e) bathrooms & facade. New driveway entry portal structure. Replace (e) roof top screens. Remove (e) secondary entry exterior canopy structure Current use: Office | Permit id: #201308083798 | |||||
SCORE 100 Revision to appl #2013. 0808. 3798 - install (n) shear walls @ 1st floor & mezz. Current use: Office | Permit id: #201401236928 | |||||
SCORE 72 Installation of (5) new computer room air conditoiners. Current use: Office | Permit id: #201402198861 | |||||
SCORE 100 4th floor: add 5 input add 5 relay modules to supervise and shutdown 5 new hvac units installed under permit app#201402198861. Work to be added to the extg fire alarm system. Current use: Office | Permit id: #201403110446 | |||||
1st and 2nd floor:t. I. For electrical rooms. New data center area common area electrical support area new concrete pads for generators new platform at roof for mechanical equipment and installtion of 2 new generators. N a for the maher ordinance #155-13 Date: April 17, 2014 Current use: Office | Permit id: #201404173555 | |||||
SCORE 100 Install 2 new evacuation maps for 1st floor to comply with current sffd evacution map guidelines. Maher n a. Current use: Office | Permit id: #201405196138 | |||||
SCORE 100 Ref pa# 2014 04 17 3555; design of mechanical roof top units on building d condensing one air unit. Upgrade to (e) roof screen b. Maher: compliance with ordinance no# 155-13 not required Current use: Office | Permit id: #201406279770 | |||||
SCORE 100 1st and 2nd floor:t. I. For electrical rooms. New data center area common area electrical support area new concrete pads for generators installtion of 2 new generators. N a for the maher ordinance #155-13 Current use: Office | Permit id: #201404173555 | |||||
SCORE 100 Install 2 new single interlock preaction systems in suite 2 and main electrical room - using 2 sprinklers and modify demo portions of 2 existing wet systems 13 heads. 201404173555 Current use: Office | Permit id: #201409035253 | |||||
SCORE 100 2nd floor:provide detection and controls for suite d 250. Pre-action system. N a for the maher ordinance #155-13. Ref app#201409035253 Current use: Office | Permit id: #201409176524 | |||||
SCORE 95 Metro job #50387 - ground level - suite d-1 - refer to electrical permit ew20121025121 Date: January 28, 2013 Contractor: Metropolitan Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130128024 | |||||
SCORE 95 Rei job #380135 installation of a redundant swing system for suite d1 f103 & f106. Installing (1) 3000a distribution board (5) 3000a atss & (1) cam-lock cabinet plus the associated feeders. Tie into existing 3000a systems. Allows dlr to bring in a temp gen set when they service the existing gen sets. Other equipment: (14) 100a ats (2) 40a ats (14) 110a 480v 3p breakers allows for inrush (2) 40a 480v 3p breakers. Date: August 14, 2012 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120814421 | |||||
SCORE 95 Rei job #222051 - 2 paul - installation of bms controls conduit and wire for dlr suite in building d suite 250. Date: August 13, 2014 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140813421 | |||||
SCORE 95 Installation of 2 new diesel generators with 3 0 gallon belly tanks each. New structural pads located outside of bld d Date: April 13, 2015 Contractor: Owner Permit type: Building permit | Current use: Office | Permit id: #201504133480 | |||||
SCORE 95 Less thank 250amp Date: February 25, 2013 Contractor: Crown Electric Inc Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130206721 | |||||
SCORE 95 Work in building "f" : roof elevator machine room-south elevator 2nd floor elevator lobby at loading dock side. Heat detector and relay module. Date: August 3, 2012 Contractor: Siemens Industry Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201208034329 | |||||
SCORE 95 Rei job #220149 - 2 paul - 4th floor t. I. Date: January 6, 2014 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140106882 | |||||
SCORE 56 1-200a feed 3 phase 480v 1-200a sub panel. Date: January 30, 2012 Contractor: Electrical Professional Services Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E20120130447 | |||||
SCORE 100 Reprogaming of suite 2 fire life safety system matrix preaction panels maher Date: March 11, 2015 Contractor: Fabian Valdiosera Permit type: Building permit | Current use: Office | Permit id: #201503110464 | |||||
SCORE 95 Rei job #380135 installation of a mechanical ats units fro existing cracs in suites f103 and f106. We are running feeders from existing switchboards to a total of 16 100a ats intercepting the feeds to existing crac units and re-feeding the crac units from the new ats units. Date: August 14, 2012 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120814481 | |||||
SCORE 96 Check electrical connection on (6) small work stations Date: July 25, 2013 Contractor: Solutions Office Interiors Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130725861 | |||||
4th floor at bldg f: installatio of new hollow metal door and frame in existing wall and installation o fnew security cage in existig data center. Maher n/a. Date: March 30, 2015 Permit type: Building permit | Current use: Office | Permit id: #201503302286 | |||||
SCORE 56 Outside generator: moving (e) circuit for supply fuel motor; other equipment: supply motor for generator fuel supply moving Date: April 11, 2011 Contractor: Hadsell Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201104114153 | |||||
SCORE 95 Install 2 450a switchgear breaker remove and demo (2) pdus cable (4) rpps cables and (24) whips in suite 403). Refeed (4) existing panel in suite 403 panel b1-4 b2-4 b3-1 and b3-2. Date: December 15, 2011 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20111215121 | |||||
SCORE 95 Run 4 inch conduit - 1st thru 4th fls Date: January 22, 2014 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140122941 | |||||
SCORE 95 Install one 2mw generator to provide redundant power for three suites. Generator to be connected to an existing redundant power switchboard. Date: July 10, 2013 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130710461 | |||||
SCORE 89 Install (16) circuits at 208 1ph from existing panelboards. Install data cable to 8 new racks. Provide power to single point of connection for new secuirty door. Date: March 25, 2013 Contractor: Redwood Electric Group Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130325782 | |||||
SCORE 95 Add 5 input modules add 5 relay modules to (e) fire alarm system. Date: March 11, 2014 Contractor: Orr Protection Systems Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201403117949 | |||||
SCORE 56 Replacement of ups equipment and supply power panels. No electric heating. Date: November 15, 2011 Contractor: Storts Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20111115061 | |||||
SCORE 56 Expanding existing building management system to monitor: two new ups three new crac units two new power distribution units five new ats switch Date: November 9, 2012 Contractor: Schneider Electric Bldgs. Americas Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20121109561 | |||||
SCORE 100 Card acess system on the 4th floor. Date: October 4, 2011 Contractor: A D T Security Services Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201110048057 | |||||
SCORE 95 Metro job #54164 - ground floor - building entrance - (54) lights (8) switches (19) receptacles lutron dimming system Date: October 11, 2013 Contractor: Metropolitan Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20131011181 | |||||
SCORE 96 Suite d2 room 102: f & i (20) 225a panelboards and feeders f & i (240) l6-30r receptacles f & i 560lf 24inx6in wire basket tray overhead f & i (120) grounding it equipment racks Date: October 14, 2014 Contractor: Cupertino Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201410143558 | |||||
SCORE 95 Furnish & install (2) est monitor modules at pre-action risers with nitrogen generation system. Date: October 15, 2015 Contractor: Orr Protection Systems Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151015481 | |||||
SCORE 95 4th floor level 3: fire alarm smoke detectors. Date: September 21, 2011 Contractor: Orr Protection Systems Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201109217816 | |||||
SCORE 95 Rei job #3801 - remove and relocate 2 fa horns 2 fa pull stations 4 eop buttons 2 wall mounted disconnect swithces and conduit and grounding condutor. Date: September 18, 2012 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120918341 | |||||
SCORE 98 2nd floor suite d 2 - fire witness test Date: October 3, 2014 Contractor: Intelligent Technologies Permit type: Electrical permit | Permit status: Reinstated | Permit id: E201409172846 | |||||
SCORE 95 Metro job #60507 - 1st floor - decommission electrical systems and remove - electrical demo Date: December 28, 2015 Contractor: Metropolitan Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201512283181 | |||||
SCORE 80 Installation of 2 (10 kw optional standby) diesel generator sets with 3 0 gallon belly tanks each. New structural pads located outside of building-d. Permit type: Building permit | Current use: Office | Permit id: #201504133480 | |||||
SCORE 100 2nd floor - fire alarm work to add notification devices into the demo area on floor 2 which is now unoccupied; additions are 13 horn/strobes 3 modules and a horn/strobe power supply. Maher na Permit type: Building permit | Current use: Office | Permit id: #201601086618 | |||||
SCORE 96 2nd flr suite d250: f&i(6) 225a panelboards and feeders f&i (88) l6-30r receptacles Date: April 6, 2016 Contractor: Cupertino Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201604066047 | |||||
SCORE 95 Rei job #220171 - t-mobile generator replacement. Installation of 2 new disel generators. The new generators will be connected to a new generator distribution board. The new distribution board will distribute power to existing bypass isolation transfer switches. Control for the new disel generators will be installed in an existing control room. Date: April 5, 2016 Contractor: Rosendin Electric Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201604057286 | |||||
SCORE 100 Furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. Maher na Permit type: Building permit | Current use: Office | Permit id: #201604064063 | |||||
SCORE 100 To obtain a final inspection for work already aproved under pa# 201401236928 all work is complete Permit type: Building permit | Current use: Office | Permit id: #201604114392 | |||||
Diesel generator & fuel storage associated with (n) data storage under pe #201602190117. Maher ordinance is not required. Date: April 15, 2016 Permit type: Building permit | Current use: Office | Permit id: #201604154927 | |||||
SCORE 100 Install (2) new est-siga-ct1 monitor modules at pre-action risers with nitrogen generation system. Maher na Permit type: Building permit | Current use: Office | Permit id: #201604265716 | |||||
SCORE 100 2nd flr: interior soft demo in advance of ti per ab-017. Maher na Permit type: Building permit | Current use: Office | Permit id: #201604296139 | |||||
SCORE 95 Connections to new electrical and mechanical equipment. Date: May 23, 2016 Contractor: Decker Electric Co Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201605238274 | |||||
SCORE 100 Installation of new generator. Generator pad under permit #2013-0610-9049. Permit type: Building permit | Expiration date: August 6, 2015 | Current use: Office | Permit id: #201307151840 | |||||
SCORE 100 Fire sprinkler tenant improvement. Added (4) upright sprinkler heads room #207a added (5) upright sprinkler heads room #312a. Date: August 15, 2012 Contractor: Allied Fire Protection Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120815843 | |||||
1st and 2nd floor:t. I. For electrical rooms. New data center area common area electrical support area new concrete pads for generators new platform at roof for mechanical equipment and installtion of 2 new generators. N/a for the maher ordinance #155-13 Date: April 17, 2014 Permit type: Building permit | Current use: Office | Permit id: #201404173555 | |||||
SCORE 100 4th floor-design & install 2 pre-action dectection & control systems within suites #402 & 403 Permit type: Building permit | Expiration date: April 30, 2011 | Current use: Office | Permit id: #201004130124 | |||||
SCORE 100 Fire sprinkler tenant improvement. Add 4 upright sprinkler heads at room 207a 2nd fl. Add 5 upgright sprinkler heads at room 312a 3rd fl Permit type: Building permit | Expiration date: December 15, 2012 | Current use: Office | Permit id: #201208157423 | |||||
Installation of 2 new diesel generators with 3 0 gallon belly tanks each. New structural pads located outside of bld d Date: April 13, 2015 Permit type: Building permit | Current use: Office | Permit id: #201504133480 | |||||
1st floor mezzanine & roof top renovation & expansion of (e) entry/lobby. Renovation of (e) bathrooms & facade. New driveway entry portal structure. Replace (e) roof top screens. Remove (e) secondary entry exterior canopy structure Date: August 8, 2013 Value: $1,500,000 Permit type: Building permit | Current use: Office | Permit id: #201308083798 | |||||
SCORE 100 Revision to 201306109049: number and size of generator anchors shown on previous permit dwgs Permit type: Building permit | Expiration date: December 9, 2013 | Current use: Office | Permit id: #201308093913 | |||||
SCORE 100 Addition on 1 heat detector (on floor 2) and 1 relay module for "firefighters hat signal under the "south elevator machine room. Upgrade on the roof level. All devices connect onto the fire alarm system. Permit type: Building permit | Expiration date: December 3, 2012 | Current use: Office | Permit id: #201208036453 | |||||
SCORE 100 Bldg. D - flr 1:addition of 3 modules for monitoring of new generator at building d. New devicesconnect onto fire alarm system. (pa ref#201307151840) Permit type: Building permit | Expiration date: December 2, 2013 | Current use: Office | Permit id: #201308023388 | |||||
SCORE 77 To obtain final inspection for work approved under pa # 200712200962. All work completed. Permit type: Building permit | Expiration date: December 20, 2010 | Current use: Phone xchnge/equip | Permit id: #201008209211 | |||||
SCORE 99 Reroofing Permit type: Building permit | Expiration date: August 18, 2013 | Current use: Office | Permit id: #201108182704 | |||||
SCORE 100 4th floor: demo (e) non structural walls doors. Remove & store (e) fences & gates. Remove & store (e) mechanical equipment. Remove electrical plumbing duct work associated with equipment Permit type: Building permit | Expiration date: August 16, 2012 | Current use: Office | Permit id: #201108162530 | |||||
SCORE 100 New battery room within existing mechanical room new electrical room modification to metal canopy d. A. Upgrades. Note: separate battery system operation permit required from sffd Permit type: Building permit | Expiration date: February 19, 2014 | Current use: Office | Permit id: #201108122415 | |||||
SCORE 89 Work category: 4pb; add 2 single interlock pre-action systems at the northeast corner of the second level of build d at 2 paul st. Date: August 5, 2016 Contractor: Eco Fire Sprinklers Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160805535 | |||||
SCORE 100 Revision to 201108162518. Install 5 new 45 minute fire rated window systems along existing 1 hr rated fire partition which separates the existing office space from data center space Permit type: Building permit | Expiration date: December 14, 2012 | Current use: Office | Permit id: #201112090429 | |||||
SCORE 100 Install server racks on the 4th floor data room. Ti approved under pa #201108162518. Permit type: Building permit | Expiration date: June 28, 2012 | Current use: Office | Permit id: #201112271341 | |||||
SCORE 100 Work category: 5m; install condensate and non-potable make-up water. Date: December 14, 2011 Contractor: Acco Engineered Systems Permit type: Plumbing permit | Permit status: Complete | Permit id: Pmw20111214316 | |||||
SCORE 100 Replacement of the entire fire alarm system for the building on a like-for-like basis per the csfm code interpretation 12-001. The replacement system does not meet correct codes. Permit type: Building permit | Expiration date: December 18, 2015 | Current use: Office | Permit id: #201310240087 | |||||
SCORE 100 Revision to app#201308083798. Mechanical and electrical drawings to change and update the engineers of record. Permit type: Building permit | Expiration date: April 17, 2014 | Current use: Office | Permit id: #201312174361 | |||||
SCORE 100 Work category: 4pb; pipe demolition connected to gas system; 2 pre-action demolition turn to wet system on the 2nd floor Date: December 10, 2015 Contractor: Rlh Fire Protection Cma Fire Protect Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151210567 | |||||
SCORE 100 Addition of 1 smoke detector 1 monitor module 1 central modul for 2nd fire alarm permit on the mmr retrofit project on floors 2 and 3. Initial work under 201211053475 Permit type: Building permit | Expiration date: April 14, 2013 | Current use: Office | Permit id: #201212146200 | |||||
SCORE 100 Revision to pa# 2009-0723-3307-per field conditions revise 2 hour rated construction to match (e) 1 hour rated construction Permit type: Building permit | Expiration date: August 9, 2010 | Current use: Warehouse no frnitur | Permit id: #201002086130 | |||||
SCORE 100 Rev. To pa# 2009. 07. 23. 3307. Revise structural steel lay out for roof top equipment Permit type: Building permit | Expiration date: June 24, 2010 | Current use: Warehouse no frnitur | Permit id: #201002237020 | |||||
SCORE 100 Install new door & associated framing install 2 new computer room air conditioning relocate 1 9e) crac install supplemental steel platform to accomodate the footprint of the condenser seismic anchorage. Relocate vfds. Permit type: Building permit | Expiration date: February 22, 2013 | Current use: Office | Permit id: #201202174415 | |||||
SCORE 72 Installation of (5) new computer room air conditoiners. Permit type: Building permit | Expiration date: March 3, 2016 | Current use: Office | Permit id: #201402198861 | |||||
SCORE 100 Work category: 4pb; 13-787 fire sprinkler relocates Date: February 21, 2014 Contractor: Ayoob And Peery Plumbing Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140221155 | |||||
SCORE 96 4th flr: instll nw pre-engineered nitrogen generation system & 2 vic series 757 air maint. Device. Install 2 atuo air releases. Provide & instll 2 nw 4" butterfly valve @ preaction system. Rmve & replace of selective fire sprk main & branchline piping an install aux drains. #201108162530 Date: February 5, 2015 Contractor: Walschon Fire Protection Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150205816 | |||||
A new data center tenant suite with supporting equipment rooms & uninteruptible power supply (ups) rooms. Improvements to consist of new walls doors finishes & new mechanical & electrical work. Exterior improvements to consist of new condensers & an air handling unit on the rooftop & new generator Date: February 19, 2016 Permit type: Building permit | Current use: Warehouse no frnitur | Permit id: #201602190117 | |||||
Astound revision to supply pump location. Supply pump to be relocated from generator enclusure to staionary fuel tank. Install electrical and low voltage conduits and wires per drawings. Revision to app#201007066004 Date: February 7, 2011 Value: $3,000 Permit type: Building permit | Expiration date: June 7, 2011 | Current use: Office | Permit id: #201102079737 | |||||
SCORE 65 Construct steel support rack for new battery installation. 3rd floor utility room Permit type: Building permit | Expiration date: July 14, 2010 | Current use: Office | Permit id: #201001144765 | |||||
New entry lobby with security desk interior upgrade finishes & fixtures. New exterior cladding higher parpapet walls aluminum panel & stucco. Date: January 11, 2012 Permit type: Building permit | Current use: Office | Permit id: #201201112043 | |||||
SCORE 100 Revision to consist of reconfiguration of the new entrance into the data center and relocation of one crac unit. Ref app#201202174415 Permit type: Building permit | Expiration date: May 9, 2013 | Current use: Office | Permit id: #201301077328 | |||||
Ste d160: revision to pa# 2012-0217-4415 to fill in shear wall including structural plans. Date: January 11, 2013 Value: $1,500 Permit type: Building permit | Expiration date: May 15, 2013 | Current use: Office | Permit id: #201301117762 | |||||
SCORE 100 Revision to appl #2013. 0808. 3798 - install (n) shear walls @ 1st floor & mezz. Permit type: Building permit | Expiration date: May 23, 2014 | Current use: Office | Permit id: #201401236928 | |||||
SCORE 88 Astound generator upgrade at 2 paul ave. Permit type: Building permit | Expiration date: July 22, 2011 | Current use: Office | Permit id: #201007066004 | |||||
SCORE 99 Added generator details as per fire permit inspector reference # pa 2009. 07. 23. 3307 Permit type: Building permit | Expiration date: November 16, 2010 | Current use: Warehouse no frnitur | Permit id: #201007156718 | |||||
SCORE 100 4th floor-addition of 1 smoke detector & 1 relay module for the corridor door holders installed at an entrance door Permit type: Building permit | Expiration date: November 19, 2010 | Current use: Office | Permit id: #201007196883 | |||||
Revision to 200911181597: reduce scope of work. Date: July 22, 2011 Value: $1 Permit type: Building permit | Current use: Office | Permit id: #201107220882 | |||||
SCORE 100 New generator pad at exterior of 2 paul ave. Permit type: Building permit | Expiration date: January 12, 2014 | Current use: Office | Permit id: #201306109049 | |||||
SCORE 100 Diesel generator & fuel storage associated with (n) data storage under pa #201602190117. Maher ordinance is not required. Permit type: Building permit | Expiration date: November 20, 2016 | Current use: Office | Permit id: #201604154927 | |||||
SCORE 86 New entry lobby with security desk interior upgrade finishes & fixtures. New exterior cladding higher parpapet walls aluminum panel & stucco. Permit type: Building permit | Expiration date: December 1, 2014 | Current use: Office | Permit id: #201201112043 | |||||
SCORE 99 Demo demising wall separating suite 402 and 403 to form a single suite. Permit type: Building permit | Expiration date: June 22, 2013 | Current use: Office | Permit id: #201206182762 | |||||
SCORE 74 Install new 10"pvc c9 privtae main fire underground tie in all existing appurtenances and abandon existing 10" fire main in place- include 1 hydarnt and 6 sprinkler underground. Permit type: Building permit | Expiration date: June 11, 2014 | Current use: Phone xchnge/equip | Permit id: #201306068865 | |||||
SCORE 94 Undergrond fire service - ref pa #2013. 06. 06. 8865 Date: June 12, 2013 Contractor: Preston Pipelines Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20130612536 | |||||
SCORE 96 Project involves intallation of 8 server racks inside an extg data center. Seismic supports will be installed for the server rack and the overhead cable tray. One door will be installed. All power for server racks will be powered from extg panels. Date: March 28, 2013 Contractor: Eric Hoffman Permit type: Building permit | Current use: Office | Permit id: #201303283308 | |||||
SCORE 100 4th floor: add 5 input add 5 relay modules to supervise and shutdown 5 new hvac units installed under permit app#201402198861. Work to be added to the extg fire alarm system. Permit type: Building permit | Expiration date: July 11, 2014 | Current use: Office | Permit id: #201403110446 | |||||
SCORE 99 Install above ground storage tank permit Date: May 11, 2010 Contractor: J. Jones M. Lynch S. Aubert Edgar Ramos Permit type: Building permit | Current use: Phone xchnge/equip | Permit id: #201005112195 | |||||
SCORE 100 Addition of a relay module in the north elevator machine rm to activate a flashing firefighters hat led in the north elev car. The raly will send a signal to the car upon an alarm condition from the existing smoke detrctors in the e. M. R Permit type: Building permit | Expiration date: March 9, 2011 | Current use: Warehouse no frnitur | Permit id: #201011094653 | |||||
SCORE 100 Work occurs on partial (e) 4th flr interior improvement includes non bearing partitions raised access floor ceilings mechanical electrical plumbing and fire protection. Permit type: Building permit | Expiration date: May 10, 2014 | Current use: Office | Permit id: #201108162518 | |||||
SCORE 100 Add 93 fire sprinklers and new 4"main to extg sprinkler system on the 4th floor fed from an existing fire pump. Pre action system Permit type: Building permit | Expiration date: November 14, 2012 | Current use: Office | Permit id: #201111148836 | |||||
SCORE 100 Add 93 fire sprinkler heads to existing fire sprinklers system on 4th floor. Date: November 14, 2011 Contractor: Allied Fire Protection Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20111114470 | |||||
SCORE 100 Addition of 1 smoke detector 2 duct detectors 3 monitor modules 1 relay mdule 3 strobes for mmr remodels on floor 2 and 3. All new devices connect onto fire alarm system Permit type: Building permit | Expiration date: March 5, 2013 | Current use: Office | Permit id: #201211053475 | |||||
SCORE 100 Combining preaction systems fro rooms #colo 402 & #colo 403 into (1) preaction system @ lev 4 t. I. @ subfloor & overhead piping. Revision to appln #201210041298. Date: November 19, 2012 Contractor: Theodore Robert Vinther Permit type: Building permit | Current use: Office | Permit id: #201211194510 | |||||
Add (1) one smoke detector to existing data center for pre-action releasing detector added due to lack of coverage Date: November 4, 2013 Permit type: Building permit | Current use: Office | Permit id: #201311041046 | |||||
SCORE 98 1st floor. Add relocate & remove fire sprinkler heads per ti. 2 add 11 relocate & 1 remove. Pa#2013-0808-3798. Permit type: Building permit | Expiration date: May 20, 2014 | Current use: Office | Permit id: #201311202343 | |||||
SCORE 100 Work category: 5p; renovation of existing bathrooms and new sewer line from drain tile to storm catch basin. Date: November 25, 2013 Contractor: Bellanti Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131125306 | |||||
3rd floor:revision to 200911181597: reduce scope of work. No chillers no pumps no structural platform Date: October 28, 2011 Value: $1 Permit type: Building permit | Expiration date: February 28, 2012 | Current use: Office | Permit id: #201107220882 | |||||
SCORE 100 4th floor: add 77 fire sprinklers from existing system. Date: October 14, 2011 Contractor: Allied Fire Protection Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20111014736 | |||||
Replacement of the entire fire alarm system for the building. Date: October 24, 2013 Permit type: Building permit | Current use: Office | Permit id: #201310240087 | |||||
SCORE 100 Ref pa# 2012-06-18-2762 issued 6-22-12. Combining pre-action systems for room 402 & 403 into (1) preaction system-lev 4 for t. I. @ subfloor & overhead piping. Date: October 4, 2012 Contractor: Theodore Robert Vinther Permit type: Building permit | Current use: Office | Permit id: #201210041298 | |||||
SCORE 100 Provide hvac for ups & pdu room. Date: September 8, 2011 Contractor: Southland Industries Permit type: Building permit | Current use: Office | Permit id: #201109084102 | |||||
SCORE 100 4th floor-change server room to office space. Pre action above ceiling to stay. Add 85 smoke detectors to drop ceilings. 15 horn strobes 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel. Permit type: Building permit | Expiration date: September 21, 2012 | Current use: Office | Permit id: #201109215144 | |||||
SCORE 100 New condensing units in area allocated by client to serve ups room new dx split system with condensing unit to serve pdu room install new condensate piping for all dx split systems. Date: September 21, 2011 Contractor: Southland Industries Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20110921134 | |||||
SCORE 89 Relocation of floor sink & drinking fountain. Installation of a humidification system Date: September 17, 2014 Contractor: Critchfield Mechanical Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140917148 | |||||
SCORE 100 Section of the ceiling is being raised 2 feet. 2 smoke detectors and 1 sampling port are to be raised 21 additional lbs of hfc-227 are to be added to cover the additional cubic feet. Also replace four nozzles. Maher na Permit type: Building permit | Expiration date: January 13, 2017 | Current use: Office | Permit id: #201609137472 | |||||
1st floor mezzanine & roof top renovation & expansion of (e) entry lobby. Renovation of (e) bathrooms & facade. New driveway entry portal structure. Replace (e) roof top screens. Remove (e) secondary entry exterior canopy structure Date: August 8, 2013 Value: $1,500,000 Permit type: Building permit | Current use: Office | Permit id: #201308083798 | |||||
SCORE 99 Reroofing Permit type: Building permit | Expiration date: August 18, 2013 | Current use: Office | Permit id: #201108182704 | |||||
SCORE 95 Installation of 2 new diesel generators with 3 0 gallon belly tanks each. New structural pads located outside of bld d Date: April 13, 2015 Contractor: Owner Permit type: Building permit | Current use: Office | Permit id: #201504133480 | |||||
1st and 2nd floor:t. I. For electrical rooms. New data center area common area electrical support area new concrete pads for generators new platform at roof for mechanical equipment and installtion of 2 new generators. N a for the maher ordinance #155-13 Date: April 17, 2014 Permit type: Building permit | Current use: Office | Permit id: #201404173555 | |||||
SCORE 95 Astound revision to supply pump location. Supply pump to be relocated from generator enclusure to staionary fuel tank. Install electrical and low voltage conduits and wires per drawings. Revision to app#201007066004 Permit type: Building permit | Expiration date: June 7, 2011 | Current use: Office | Permit id: #201102079737 | |||||
4th floor at bldg f: installatio of new hollow metal door and frame in existing wall and installation o fnew security cage in existig data center. Maher n a. Date: March 30, 2015 Permit type: Building permit | Current use: Office | Permit id: #201503302286 | |||||
SCORE 95 3rd floor:revision to 200911181597: reduce scope of work. No chillers no pumps no structural platform Permit type: Building permit | Expiration date: February 28, 2012 | Current use: Office | Permit id: #201107220882 | |||||
SCORE 100 To obtain final inspection for work approved under pa #201401236928. All work is complete. Permit type: Building permit | Expiration date: February 24, 2017 | Current use: Office | Permit id: #201610240979 | |||||
SCORE 100 To obtain final inspection for work approved under pa #201308083798. All work is complete. Permit type: Building permit | Expiration date: February 24, 2017 | Current use: Office | Permit id: #201610240981 | |||||
SCORE 100 Provide hvac for ups & pdu room. Date: September 8, 2011 Contractor: Southland Industries Permit type: Building permit | Current use: Office | Permit id: #201109084102 | |||||
Install seal tight flex whips with outlets under raised floor in server room. (1st floor) Permit status: Complete | Permit id: E200901286147 | |||||
Renewal of expired permit #ew20071009201 to complete inspections: installation of data processing equipment electrical supply. Permit status: Complete | Permit id: E20101104959 | |||||
Installation of conduit & wire from existing pdus to starline bus system to power rackable cabinets. 2 paul avenue 1st floor ste. 106 job#29445m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071113962 | |||||
Installing a new generator and bus duct from the generator to an existing paralleling gear. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080519463 | |||||
Metro job #60507 - 1st floor - decommission electrical systems and remove - electrical demo Permit status: Filed | Permit id: Ew201512283181 | |||||
Less thank 250amp Permit status: Complete | Permit id: Ew20130206721 | |||||
Rei job #222051 - 2 paul - installation of bms controls conduit and wire for dlr suite in building d suite 250. Permit status: Issued | Permit id: Ew20140813421 | |||||
Renewal of expired permit #ew20070427941 to complete inspections: installation of cooling unit electrical supply. Permit status: Complete | Permit id: E20101104958 | |||||
Install (16) circuits at 208 1ph from existing panelboards. Install data cable to 8 new racks. Provide power to single point of connection for new secuirty door. Permit status: Complete | Permit id: Ew20130325782 | |||||
Amazon a1 suite: (32) 225a panels Permit status: Expired | Permit id: E201105265173 | |||||
Obtain final inspection for expired permit #e201006178162. 3 f data center replace generator. Permit status: Complete | Permit id: E201105134925 | |||||
Install (8) 30a receptacles (cage power). Permit status: Complete | Permit id: E200903167696 | |||||
Suite d2 room 102: f & i (20) 225a panelboards and feeders f & i (240) l6-30r receptacles f & i 560lf 24inx6in wire basket tray overhead f & i (120) grounding it equipment racks Permit status: Complete | Permit id: E201410143558 | |||||
In 7 locations parallel distribution panels to existing panels on the 5th floor Permit status: Complete | Permit id: Ew20030723232 | |||||
Work to be done in suite 103: install a 225a 120 208v panel in suite 103 (fed from suite 106). Install (24) l6- receptacles and (8) l21- receptacles. Tie panel into (e) epo system. 1-225a 1-225a 120 208v 32 receptacles Permit status: Complete | Permit id: E201005067220 | |||||
Metro job #50387 - ground level - suite d-1 - refer to electrical permit ew20121025121 Permit status: Complete | Permit id: Ew20130128024 | |||||
Install 5 kua ups system associated maintanance bypass panel associated battery system epo circuit and associated five 1 0 amp feeders Permit status: Complete | Permit id: E201002105332 | |||||
Pulling in cats and cat6 cable terminating on patch panel and other siee rj45. Putting in fiber tray and fiber jumpers. Permit status: Expired | Permit id: E201001074700 | |||||
Circuits: (6) panels switchboards: (1) 600amp motor control center installation of new motor control center. Connect to hvac pumps and controls. 2 paul - roof job#29090m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080612242 | |||||
Rei job #380123 2 paul avenue 4th floor rooms 401 415 thru 419 and 429. Demo of existing white space installation of new lights electrical gear ups units pdus rpps relocation of some panels re-feeding existing a c units. Permit status: Complete | Permit id: Ew20110822269 | |||||
Rei job #220149 - 2 paul - 4th floor t. I. Permit status: Filed | Permit id: Ew20140106882 | |||||
3rd flr: occupied by tenant wave holdings astound broadband rcn telecom as well as area outside the bldg within the generator field Permit status: Complete | Permit id: E201112129586 | |||||
Survey review per inspector roger Permit status: Complete | Permit id: Ew20100126361 | |||||
Rei job 221092. No. Of circuits: 1 feeders: 350mcm. Permit status: Complete | Permit id: Ew20040604981 | |||||
Install unistrut support system for cables and conduit [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070320224 | |||||
Re-route existing feeders from dp-2 to dp-ups5. Install new feeders to existing distribution panels to dp-1. 2 paul 2nd floor job#30052m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080206361 | |||||
Install 2 450a switchgear breaker remove and demo (2) pdus cable (4) rpps cables and (24) whips in suite 403). Refeed (4) existing panel in suite 403 panel b1-4 b2-4 b3-1 and b3-2. Permit status: Complete | Permit id: Ew20111215121 | |||||
1 circuits 1 strobe palen. 3rd floor equipment room 1quest. Ste 304. Furnish and install 1 new reodt strobe panel 2 new fire life safety devices tie existing strobe into new strobe into new strobe panel and tie into bodg facp Permit status: Complete | Permit id: E20041203741 | |||||
3 f: install (1) 400amp 3 4w 480 277 panelboard. Permit status: Complete | Permit id: E201403288440 | |||||
2nd floor suite d 2 - fire witness test Permit status: Reinstated | Permit id: E201409172846 | |||||
Electrical permit for 2 paul suites f402 & f403. The area of the rooms: colo 402: 4 449 sq. Ft colo 403: 9 518 sq. Ft elec. Rm 403: 2 876 sq. Ft elec. Rm 402: 2 044 sq. Ft Permit status: Complete | Permit id: Ew20100212201 | |||||
2nd & 3rd flrs: addition of new critical infrastructure: 8-225 amps (1)1000a 1-800a 1-600a 15 kv (1-1600a 2-100a 2-225a 480v (1)1600a 480v 1-800a 480v (6)225a 1-1000kva 2-288kva 8 lights 4 switches 4 receptacles 2 ef 3crac 3 condensing unit Permit status: Complete | Permit id: E201108197090 | |||||
Temporary wiring for temp. Generators 4 of 3000amp bus duct. Connect to generator run alarm conduit for generator also. Bus duct and conduit to run from generator yard (outside) to 2nd floor electrical room. Job#28561m [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070814485 | |||||
4th floor level 3: fire alarm smoke detectors. Permit status: Complete | Permit id: E201109217816 | |||||
Install electrical devices for preaction detection system on 1st floor equipment & electrical room. Permit status: Complete | Permit id: E200602145103 | |||||
1- 2meg generator pipe wire control Permit status: Complete | Permit id: E20021104246 | |||||
Rei job #380135 installation of a mechanical ats units fro existing cracs in suites f103 and f106. We are running feeders from existing switchboards to a total of 16 100a ats intercepting the feeds to existing crac units and re-feeding the crac units from the new ats units. Permit status: Complete | Permit id: Ew20120814481 | |||||
Card acess system on the 4th floor. Permit status: Complete | Permit id: E201110048057 | |||||
1st floor - no. Of lights- switches-12 receptacles-20. Permit status: Complete | Permit id: Ew20031007522 | |||||
2 lights; 3 switches; 3 receptacles; 1 new 1 relocated panels switchboards; relocate 4 existing feeders; temp power; 2 paul yard expansion cei job #13-4-12699- jj Permit status: Complete | Permit id: Ew20140113822 | |||||
Re-wiring of existing circuits &new sub-panels for metering of new circuits in two cages; incidental clean-up of existing unused wiring and outlets. Permit status: Complete | Permit id: Ew20101111763 | |||||
Replace (e) fuel pump sets (2) each with new pump sets Permit status: Complete | Permit id: E200706259094 | |||||
Outside generator: moving (e) circuit for supply fuel motor; other equipment: supply motor for generator fuel supply moving Permit status: Complete | Permit id: E201104114153 | |||||
Install one 2mw generator to provide redundant power for three suites. Generator to be connected to an existing redundant power switchboard. Permit status: Complete | Permit id: Ew20130710461 | |||||
Witness test Permit status: Complete | Permit id: E200309162862 | |||||
Adding a circuit for a new 1 3 hp exhaust fan. Permit status: Cancelled | Permit id: Ew20100902283 | |||||
Receptacles: (204) circuits: (213) panel switchboards: (1-1200amp distribution-from main switch to distribution panel) connect to existing 1200amp 480volt breaker. Install new 1200amp 480v distribution panel. Connect to 4 pdus and 4 hvac units with disconnects. Install 204 l5-20s connected to pdus. 2 paul avenue 2nd floor job#28561m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070717061 | |||||
Install 2 new 40amp circuit breaker 2 circuits 07-4190 Permit status: Complete | Permit id: E200702205331 | |||||
Roof: connect (1) a c unit on roof connect for monitoring cabinet 4 volt - amp Permit status: Complete | Permit id: E200901145627 | |||||
1. Low voltage as patch cables harnesses - qty: 78 = 826 cables. 2. Cabinet & ladder rach installation. 3. Fiber tray to ladder rack installation. Permit status: Complete | Permit id: E200902116632 | |||||
Work in building "f" : roof elevator machine room-south elevator 2nd floor elevator lobby at loading dock side. Heat detector and relay module. Permit status: Issued | Permit id: E201208034329 | |||||
Replacing an existing 3000amp 480v ats switch with new one. Installing a temporary 2 megawatt generator a temporary ats and temporary cabling. Permit status: Complete | Permit id: Ew20100706001 | |||||
Installation of 1 receptacles in lab. Permit status: Complete | Permit id: E201006017713 | |||||
Install 23 120vac-20amp l5- receptacles and 6 208vac 30amp l6- receptacle on 2nd floor for on24 and bandcon. 2 paul 2nd floor job#29780m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071220687 | |||||
Job 380053 - digital realty - 2 paul ave. No of lights - 175 switches - 15 receptacles - 25 circuits - 112 panels switchboards - 10. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20060929342 | |||||
3rd floor: 52 receptacles; feeders no. & size: 5 @ 225a 3 phase; panelboard switchboard no. & size: 52 @ 2p 30a; transformer no. & size: 1 @ 225kva; (1) installation of owners 225 kva power distribution unit. (2) installation of approximately four (4) 225a feeders. (3). Installation of owners 225a plug on bus duct (approx 60) (4) installation one (1) 350a feeders. Permit status: Expired | Permit id: E200912224399 | |||||
Witness test 9 15 2003 Permit status: Expired | Permit id: E200309162861 | |||||
Install electrical wiring for ups and hvac systems sub-panels and controls [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20071009201 | |||||
Connect new 2mw generator to existing 3000amp bus duct. 2 paul - generator yard job#30995m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080709721 | |||||
Install new panels and circuit wiring for data process equipment cabinets [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080116581 | |||||
Furnish & install (2) est monitor modules at pre-action risers with nitrogen generation system. Permit status: Complete | Permit id: Ew20151015481 | |||||
Install 100-amp 480-volt feeder to new subpanel. Connect 4-30-amp rectifiers. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080828983 | |||||
Install seal tight flex whips with outlets under raised floor in server room. Permit status: Complete | Permit id: E200902096532 | |||||
Fire warning test. Permit status: Complete | Permit id: E200602145102 | |||||
Rei job #3801 - remove and relocate 2 fa horns 2 fa pull stations 4 eop buttons 2 wall mounted disconnect swithces and conduit and grounding condutor. Permit status: Complete | Permit id: Ew20120918341 | |||||
Suite 1 4 45kva transformer Permit status: Complete | Permit id: E200610192342 | |||||
Fire alarm modification and new epo system. (9) smoke detectors (6) pa bells (13) control relays (hvac shutdown) (8) epo station (1) epo control panel interface to shunt trip breakers for main power and ups batteries. Job#30571 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080612241 | |||||
Expanding existing building management system to monitor: two new ups three new crac units two new power distribution units five new ats switch Permit status: Complete | Permit id: Ew20121109561 | |||||
Rei job#380067 data center - electrical distribution generator light fixtures and empty conduit for security [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070604393 | |||||
Fire warning test Permit status: Complete | Permit id: E200805288000 | |||||
2 paul avenue suite 1 job#27531m receptacles: (168) panels switchboards: (48) install 48 new panelboards from 6 existing pdus and 168 new 208volt receptacles need 4 inspections over 4 months (3 phases) server room installation for rack power [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070214001 | |||||
Install direct current battery line up and rectifier units battery room and dc plant room Permit status: Complete | Permit id: E20030710103 | |||||
Add 1-5 kva ups and distribition to racks add 1 250kva ups and distribution to racks add 1 section to switchboard 1-25 section 1-112. 5. Permit status: Complete | Permit id: E20090616368 | |||||
2 paul avenue - 3rd floor - astound - 4 cables - telcom permit - wbe job # 02-112569 contact eric thompson - 415-798-0015 Permit status: Cancelled | Permit id: Ew20100625661 | |||||
2 paul ste # 103 sf ca 51 lights 6 switches 18 receptacles 4-1200a 2- 600a 1- 150a 2-225a 4- 300a kva ups 8- 250a pdus Permit status: Complete | Permit id: E200602175218 | |||||
3rd flr: installation of dc power plant and battery back-up for communications equipment: 11 cables Permit status: Complete | Permit id: E201002245581 | |||||
Installation of 3 pdus power logie monitoring system and interface to existing epo system. 3 circuits and 3 panels. Permit status: Complete | Permit id: E20080903830 | |||||
3 f data center replace generator. Permit status: Complete | Permit id: E201006178162 | |||||
Metro job #50387 - ground level - suite d1 - (2) 4" conduits w 600mcm (2) 400a 480v panels (3) ats Permit status: Complete | Permit id: Ew20121025121 | |||||
Install two (2) 400-amp 48-vdc supplies in the meet me room on the 3rd flr [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080117801 | |||||
Furnish & install a complete electrical system incl distribution panels; lighting - electrical devices fire alarm & power connections to motors Permit status: Complete | Permit id: E200303255633 | |||||
1-200a feed 3 phase 480v 1-200a sub panel. Permit status: Expired | Permit id: E20120130447 | |||||
4th flr: stes 402 & 403 colo 402 electrical rm 402e colo 403 electrical rm 403e Permit status: Expired | Permit id: E201004307123 | |||||
Computer room 3rd floor qwest ste 304. Permit status: Complete | Permit id: E200503234564 | |||||
Witness test fire warning suite #106 Permit status: Expired | Permit id: E200706148795 | |||||
T i lights plugs switches. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080306701 | |||||
Job #55248 - 4th floor - installation of conduit & conductors into customer furnished pdu cabinet - (1) pdu w (4) branch circuit panels Permit status: Filed | Permit id: Ew20140224761 | |||||
Rei job #380135 installation of a redundant swing system for suite d1 f103 & f106. Installing (1) 3000a distribution board (5) 3000a atss & (1) cam-lock cabinet plus the associated feeders. Tie into existing 3000a systems. Allows dlr to bring in a temp gen set when they service the existing gen sets. Other equipment: (14) 100a ats (2) 40a ats (14) 110a 480v 3p breakers allows for inrush (2) 40a 480v 3p breakers. Permit status: Complete | Permit id: Ew20120814421 | |||||
Replacement of ups equipment and supply power panels. No electric heating. Permit status: Complete | Permit id: Ew20111115061 | |||||
Receptacles: (60) circuits: (62) two cac units-1 amps. Addition of sixty (60) 20amp receptacles (l5-20twist lock) from panels dp-b3a+b. Also addition of two(2) cac units to be energized from panel dp-ops3. 2 paul 2nd floor job#28189 c o #1 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070614741 | |||||
Metro job #54164 - ground floor - building entrance - (54) lights (8) switches (19) receptacles lutron dimming system Permit status: Complete | Permit id: Ew20131011181 | |||||
Fire warning test at 2 paul ave. Building "d" of a commercial building on 1st floor Permit status: Complete | Permit id: E200611072880 | |||||
Install 1 3 phase panel with amp feeder Permit status: Complete | Permit id: E200302204273 | |||||
Provide & install 8 hid fixtures & 7 flour. Fixtures Permit status: Complete | Permit id: E20021112579 | |||||
Renewal of expired permit #ew20080116581 to complete inspections: installation of panels and circuits to data equipment outlet. Permit status: Complete | Permit id: E20101104957 | |||||
480 208y transformer w switch for indoor hvac unit wiring [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070427941 | |||||
38 receptacles 2-75 kva tranformer 480 120-208v 3 phase 2-new 225a panels 120 208v 3 phase 2-225 breaker enclosure 208v 2-125a breaker 480v 3 pole 1 wire mold 6 lights Permit status: Complete | Permit id: E200704196957 | |||||
Fire warning test. Permit status: Complete | Permit id: E200605238015 | |||||
1 light. Permit status: Expired | Permit id: E200711133147 | |||||
Building d #2 2 f with minor work on 1 f- (4) 800a (5) 3000a (2) 400a (1) 225a (2) 100a (1) 1200a panelboards (2) 2500kva. (2) kva (2) 15 kva transformers 183 lights 24 switches 36 receptacles 8 fans (2) 2mw generators. Permit status: Complete | Permit id: E201408061728 | |||||
Lights: (36) switches: (9) circuits: (15) panels switchboards: (1 3000amp switchboard) 1 4000amp distribution 4 2000amp pdus connection to 5 30ton hvac and 2 cooling tower-pumps xo communications - colo expansion electrical distribution system jb#28561m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070813306 | |||||
Check electrical connection on (6) small work stations Permit status: Complete | Permit id: Ew20130725861 | |||||
Lights: (10) underground conduit and feeders for parking lot lighting 2 paul avenue parking lot job#28899m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071005001 | |||||
Computer room 3rd floor qwest ste 304. Witness test only. Permit status: Complete | Permit id: E200503234560 | |||||
1 light. Permit status: Complete | Permit id: E200807299634 | |||||
Temporary installations of backup power equipment to effect repair of existing ups equipment Permit status: Complete | Permit id: Ew20100310366 | |||||
Install two (2) 400-amp 48-vdc supplies in the meet me room third floor [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080123921 | |||||
Panels switchboards:(1-1200amp 2-800amp 1-600amp) w appropriate feeders (1) 5 kvaups (1) 3 kva transformer (1) 225 kva transformer xo communication ups project to include power distribution. 2 paul - 2nd floor job#28189m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070518102 | |||||
Astound broadband llc server room - additional qty. (1) 800a panelboard information technology equipment racks and power outlets. Permit status: Complete | Permit id: Ew20091204021 | |||||
1st flr: facebook ste #106- installation of cable raceway (low voltage)data cabling mounting of rackable service cabinets to floor requires drilling of concrete floor Permit status: Complete | Permit id: E200711143181 | |||||
Connections to new electrical and mechanical equipment. Permit status: Filed | Permit id: Ew201605238274 | |||||
Run 4 inch conduit - 1st thru 4th fls Permit status: Expired | Permit id: Ew20140122941 | |||||
Add 5 input modules add 5 relay modules to (e) fire alarm system. Permit status: Expired | Permit id: E201403117949 | |||||
2nd flr suite d250: f&i(6) 225a panelboards and feeders f&i (88) l6-30r receptacles Permit status: Complete | Permit id: E201604066047 | |||||
Rei job #220171 - t-mobile generator replacement. Installation of 2 new disel generators. The new generators will be connected to a new generator distribution board. The new distribution board will distribute power to existing bypass isolation transfer switches. Control for the new disel generators will be installed in an existing control room. Permit status: Complete | Permit id: Ew201604057286 | |||||
1 circuits; (14) 400v 25a panelboards; 6 ft of basket tray -16-144-08103-09 Permit status: Filed | Permit id: Ew201610181237 | |||||
Add 5 input modules add 5 relay modules to (e) fire alarm system. Permit status: Expired | Permit id: E201403117949 | |||||
Run 4 inch conduit - 1st thru 4th fls Permit status: Expired | Permit id: Ew20140122941 | |||||
Astound broadband llc server room - additional qty. (1) 800a panelboard information technology equipment racks and power outlets. Permit status: Complete | Permit id: Ew20091204021 | |||||
Panels switchboards:(1-1200amp 2-800amp 1-600amp) w appropriate feeders (1) 5 kvaups (1) 3 kva transformer (1) 225 kva transformer xo communication ups project to include power distribution. 2 paul - 2nd floor job#28189m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070518102 | |||||
Temporary installations of backup power equipment to effect repair of existing ups equipment Permit status: Complete | Permit id: Ew20100310366 | |||||
Install two (2) 400-amp 48-vdc supplies in the meet me room third floor [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080123921 | |||||
1 light. Permit status: Complete | Permit id: E200807299634 | |||||
Lights: (10) underground conduit and feeders for parking lot lighting 2 paul avenue parking lot job#28899m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071005001 | |||||
Check electrical connection on (6) small work stations Permit status: Complete | Permit id: Ew20130725861 | |||||
Lights: (36) switches: (9) circuits: (15) panels switchboards: (1 3000amp switchboard) 1 4000amp distribution 4 2000amp pdus connection to 5 30ton hvac and 2 cooling tower-pumps xo communications - colo expansion electrical distribution system jb#28561m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070813306 | |||||
Building d #2 2 f with minor work on 1 f- (4) 800a (5) 3000a (2) 400a (1) 225a (2) 100a (1) 1200a panelboards (2) 2500kva. (2) kva (2) 15 kva transformers 183 lights 24 switches 36 receptacles 8 fans (2) 2mw generators. Permit status: Complete | Permit id: E201408061728 | |||||
38 receptacles 2-75 kva tranformer 480 120-208v 3 phase 2-new 225a panels 120 208v 3 phase 2-225 breaker enclosure 208v 2-125a breaker 480v 3 pole 1 wire mold 6 lights Permit status: Complete | Permit id: E200704196957 | |||||
480 208y transformer w switch for indoor hvac unit wiring [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070427941 | |||||
Renewal of expired permit #ew20080116581 to complete inspections: installation of panels and circuits to data equipment outlet. Permit status: Complete | Permit id: E20101104957 | |||||
Fire warning test at 2 paul ave. Building "d" of a commercial building on 1st floor Permit status: Complete | Permit id: E200611072880 | |||||
Metro job #54164 - ground floor - building entrance - (54) lights (8) switches (19) receptacles lutron dimming system Permit status: Complete | Permit id: Ew20131011181 | |||||
Receptacles: (60) circuits: (62) two cac units-1 amps. Addition of sixty (60) 20amp receptacles (l5-20twist lock) from panels dp-b3a+b. Also addition of two(2) cac units to be energized from panel dp-ops3. 2 paul 2nd floor job#28189 c o #1 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070614741 | |||||
Replacement of ups equipment and supply power panels. No electric heating. Permit status: Complete | Permit id: Ew20111115061 | |||||
Rei job #380135 installation of a redundant swing system for suite d1 f103 & f106. Installing (1) 3000a distribution board (5) 3000a atss & (1) cam-lock cabinet plus the associated feeders. Tie into existing 3000a systems. Allows dlr to bring in a temp gen set when they service the existing gen sets. Other equipment: (14) 100a ats (2) 40a ats (14) 110a 480v 3p breakers allows for inrush (2) 40a 480v 3p breakers. Permit status: Complete | Permit id: Ew20120814421 | |||||
Job #55248 - 4th floor - installation of conduit & conductors into customer furnished pdu cabinet - (1) pdu w (4) branch circuit panels Permit status: Filed | Permit id: Ew20140224761 | |||||
T i lights plugs switches. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080306701 | |||||
Witness test fire warning suite #106 Permit status: Expired | Permit id: E200706148795 | |||||
Computer room 3rd floor qwest ste 304. Permit status: Complete | Permit id: E200503234564 | |||||
4th flr: stes 402 & 403 colo 402 electrical rm 402e colo 403 electrical rm 403e Permit status: Expired | Permit id: E201004307123 | |||||
1-200a feed 3 phase 480v 1-200a sub panel. Permit status: Expired | Permit id: E20120130447 | |||||
Metro job #50387 - ground level - suite d1 - (2) 4" conduits w 600mcm (2) 400a 480v panels (3) ats Permit status: Complete | Permit id: Ew20121025121 | |||||
Install two (2) 400-amp 48-vdc supplies in the meet me room on the 3rd flr [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080117801 | |||||
3rd flr: installation of dc power plant and battery back-up for communications equipment: 11 cables Permit status: Complete | Permit id: E201002245581 | |||||
2 paul ste # 103 sf ca 51 lights 6 switches 18 receptacles 4-1200a 2- 600a 1- 150a 2-225a 4- 300a kva ups 8- 250a pdus Permit status: Complete | Permit id: E200602175218 | |||||
2 paul avenue - 3rd floor - astound - 4 cables - telcom permit - wbe job # 02-112569 contact eric thompson - 415-798-0015 Permit status: Cancelled | Permit id: Ew20100625661 | |||||
Add 1-5 kva ups and distribition to racks add 1 250kva ups and distribution to racks add 1 section to switchboard 1-25 section 1-112. 5. Permit status: Complete | Permit id: E20090616368 | |||||
Install direct current battery line up and rectifier units battery room and dc plant room Permit status: Complete | Permit id: E20030710103 | |||||
2 paul avenue suite 1 job#27531m receptacles: (168) panels switchboards: (48) install 48 new panelboards from 6 existing pdus and 168 new 208volt receptacles need 4 inspections over 4 months (3 phases) server room installation for rack power [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070214001 | |||||
Expanding existing building management system to monitor: two new ups three new crac units two new power distribution units five new ats switch Permit status: Complete | Permit id: Ew20121109561 | |||||
Fire alarm modification and new epo system. (9) smoke detectors (6) pa bells (13) control relays (hvac shutdown) (8) epo station (1) epo control panel interface to shunt trip breakers for main power and ups batteries. Job#30571 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080612241 | |||||
Suite 1 4 45kva transformer Permit status: Complete | Permit id: E200610192342 | |||||
Fire warning test. Permit status: Complete | Permit id: E200602145102 | |||||
Install seal tight flex whips with outlets under raised floor in server room. Permit status: Complete | Permit id: E200902096532 | |||||
Furnish & install (2) est monitor modules at pre-action risers with nitrogen generation system. Permit status: Complete | Permit id: Ew20151015481 | |||||
Connect new 2mw generator to existing 3000amp bus duct. 2 paul - generator yard job#30995m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080709721 | |||||
Install electrical wiring for ups and hvac systems sub-panels and controls [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20071009201 | |||||
Witness test 9 15 2003 Permit status: Expired | Permit id: E200309162861 | |||||
Install 100-amp 480-volt feeder to new subpanel. Connect 4-30-amp rectifiers. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080828983 | |||||
3rd floor: 52 receptacles; feeders no. & size: 5 @ 225a 3 phase; panelboard switchboard no. & size: 52 @ 2p 30a; transformer no. & size: 1 @ 225kva; (1) installation of owners 225 kva power distribution unit. (2) installation of approximately four (4) 225a feeders. (3). Installation of owners 225a plug on bus duct (approx 60) (4) installation one (1) 350a feeders. Permit status: Expired | Permit id: E200912224399 | |||||
Job 380053 - digital realty - 2 paul ave. No of lights - 175 switches - 15 receptacles - 25 circuits - 112 panels switchboards - 10. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20060929342 | |||||
Installation of 1 receptacles in lab. Permit status: Complete | Permit id: E201006017713 | |||||
Install new panels and circuit wiring for data process equipment cabinets [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20080116581 | |||||
Work in building "f" : roof elevator machine room-south elevator 2nd floor elevator lobby at loading dock side. Heat detector and relay module. Permit status: Issued | Permit id: E201208034329 | |||||
1. Low voltage as patch cables harnesses - qty: 78 = 826 cables. 2. Cabinet & ladder rach installation. 3. Fiber tray to ladder rack installation. Permit status: Complete | Permit id: E200902116632 | |||||
Roof: connect (1) a c unit on roof connect for monitoring cabinet 4 volt - amp Permit status: Complete | Permit id: E200901145627 | |||||
Install 2 new 40amp circuit breaker 2 circuits 07-4190 Permit status: Complete | Permit id: E200702205331 | |||||
Receptacles: (204) circuits: (213) panel switchboards: (1-1200amp distribution-from main switch to distribution panel) connect to existing 1200amp 480volt breaker. Install new 1200amp 480v distribution panel. Connect to 4 pdus and 4 hvac units with disconnects. Install 204 l5-20s connected to pdus. 2 paul avenue 2nd floor job#28561m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070717061 | |||||
Adding a circuit for a new 1 3 hp exhaust fan. Permit status: Cancelled | Permit id: Ew20100902283 | |||||
Witness test Permit status: Complete | Permit id: E200309162862 | |||||
Install one 2mw generator to provide redundant power for three suites. Generator to be connected to an existing redundant power switchboard. Permit status: Complete | Permit id: Ew20130710461 | |||||
Outside generator: moving (e) circuit for supply fuel motor; other equipment: supply motor for generator fuel supply moving Permit status: Complete | Permit id: E201104114153 | |||||
Replace (e) fuel pump sets (2) each with new pump sets Permit status: Complete | Permit id: E200706259094 | |||||
Re-wiring of existing circuits &new sub-panels for metering of new circuits in two cages; incidental clean-up of existing unused wiring and outlets. Permit status: Complete | Permit id: Ew20101111763 | |||||
2 lights; 3 switches; 3 receptacles; 1 new 1 relocated panels switchboards; relocate 4 existing feeders; temp power; 2 paul yard expansion cei job #13-4-12699- jj Permit status: Complete | Permit id: Ew20140113822 | |||||
1st floor - no. Of lights- switches-12 receptacles-20. Permit status: Complete | Permit id: Ew20031007522 | |||||
Card acess system on the 4th floor. Permit status: Complete | Permit id: E201110048057 | |||||
Rei job #380135 installation of a mechanical ats units fro existing cracs in suites f103 and f106. We are running feeders from existing switchboards to a total of 16 100a ats intercepting the feeds to existing crac units and re-feeding the crac units from the new ats units. Permit status: Complete | Permit id: Ew20120814481 | |||||
1- 2meg generator pipe wire control Permit status: Complete | Permit id: E20021104246 | |||||
Install electrical devices for preaction detection system on 1st floor equipment & electrical room. Permit status: Complete | Permit id: E200602145103 | |||||
4th floor level 3: fire alarm smoke detectors. Permit status: Complete | Permit id: E201109217816 | |||||
2nd & 3rd flrs: addition of new critical infrastructure: 8-225 amps (1)1000a 1-800a 1-600a 15 kv (1-1600a 2-100a 2-225a 480v (1)1600a 480v 1-800a 480v (6)225a 1-1000kva 2-288kva 8 lights 4 switches 4 receptacles 2 ef 3crac 3 condensing unit Permit status: Complete | Permit id: E201108197090 | |||||
Temporary wiring for temp. Generators 4 of 3000amp bus duct. Connect to generator run alarm conduit for generator also. Bus duct and conduit to run from generator yard (outside) to 2nd floor electrical room. Job#28561m [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070814485 | |||||
Electrical permit for 2 paul suites f402 & f403. The area of the rooms: colo 402: 4 449 sq. Ft colo 403: 9 518 sq. Ft elec. Rm 403: 2 876 sq. Ft elec. Rm 402: 2 044 sq. Ft Permit status: Complete | Permit id: Ew20100212201 | |||||
2nd floor suite d 2 - fire witness test Permit status: Reinstated | Permit id: E201409172846 | |||||
3 f: install (1) 400amp 3 4w 480 277 panelboard. Permit status: Complete | Permit id: E201403288440 | |||||
1 circuits 1 strobe palen. 3rd floor equipment room 1quest. Ste 304. Furnish and install 1 new reodt strobe panel 2 new fire life safety devices tie existing strobe into new strobe into new strobe panel and tie into bodg facp Permit status: Complete | Permit id: E20041203741 | |||||
Install 2 450a switchgear breaker remove and demo (2) pdus cable (4) rpps cables and (24) whips in suite 403). Refeed (4) existing panel in suite 403 panel b1-4 b2-4 b3-1 and b3-2. Permit status: Complete | Permit id: Ew20111215121 | |||||
Fire warning test. Permit status: Complete | Permit id: E200605238015 | |||||
Re-route existing feeders from dp-2 to dp-ups5. Install new feeders to existing distribution panels to dp-1. 2 paul 2nd floor job#30052m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080206361 | |||||
Install 23 120vac-20amp l5- receptacles and 6 208vac 30amp l6- receptacle on 2nd floor for on24 and bandcon. 2 paul 2nd floor job#29780m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071220687 | |||||
Rei job #3801 - remove and relocate 2 fa horns 2 fa pull stations 4 eop buttons 2 wall mounted disconnect swithces and conduit and grounding condutor. Permit status: Complete | Permit id: Ew20120918341 | |||||
Install unistrut support system for cables and conduit [scope of work does not include residential electric space heater installation.] Permit status: Expired | Permit id: Ew20070320224 | |||||
Rei job 221092. No. Of circuits: 1 feeders: 350mcm. Permit status: Complete | Permit id: Ew20040604981 | |||||
Rei job#380067 data center - electrical distribution generator light fixtures and empty conduit for security [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070604393 | |||||
Fire warning test Permit status: Complete | Permit id: E200805288000 | |||||
Survey review per inspector roger Permit status: Complete | Permit id: Ew20100126361 | |||||
Rei job #380123 2 paul avenue 4th floor rooms 401 415 thru 419 and 429. Demo of existing white space installation of new lights electrical gear ups units pdus rpps relocation of some panels re-feeding existing a c units. Permit status: Complete | Permit id: Ew20110822269 | |||||
Rei job #220149 - 2 paul - 4th floor t. I. Permit status: Filed | Permit id: Ew20140106882 | |||||
3rd flr: occupied by tenant wave holdings astound broadband rcn telecom as well as area outside the bldg within the generator field Permit status: Complete | Permit id: E201112129586 | |||||
Circuits: (6) panels switchboards: (1) 600amp motor control center installation of new motor control center. Connect to hvac pumps and controls. 2 paul - roof job#29090m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080612242 | |||||
Pulling in cats and cat6 cable terminating on patch panel and other siee rj45. Putting in fiber tray and fiber jumpers. Permit status: Expired | Permit id: E201001074700 | |||||
Install 5 kua ups system associated maintanance bypass panel associated battery system epo circuit and associated five 1 0 amp feeders Permit status: Complete | Permit id: E201002105332 | |||||
Metro job #50387 - ground level - suite d-1 - refer to electrical permit ew20121025121 Permit status: Complete | Permit id: Ew20130128024 | |||||
In 7 locations parallel distribution panels to existing panels on the 5th floor Permit status: Complete | Permit id: Ew20030723232 | |||||
Obtain final inspection for expired permit #e201006178162. 3 f data center replace generator. Permit status: Complete | Permit id: E201105134925 | |||||
Install (8) 30a receptacles (cage power). Permit status: Complete | Permit id: E200903167696 | |||||
Suite d2 room 102: f & i (20) 225a panelboards and feeders f & i (240) l6-30r receptacles f & i 560lf 24inx6in wire basket tray overhead f & i (120) grounding it equipment racks Permit status: Complete | Permit id: E201410143558 | |||||
1 light. Permit status: Expired | Permit id: E200711133147 | |||||
Amazon a1 suite: (32) 225a panels Permit status: Expired | Permit id: E201105265173 | |||||
Installation of 3 pdus power logie monitoring system and interface to existing epo system. 3 circuits and 3 panels. Permit status: Complete | Permit id: E20080903830 | |||||
Install (16) circuits at 208 1ph from existing panelboards. Install data cable to 8 new racks. Provide power to single point of connection for new secuirty door. Permit status: Complete | Permit id: Ew20130325782 | |||||
Renewal of expired permit #ew20070427941 to complete inspections: installation of cooling unit electrical supply. Permit status: Complete | Permit id: E20101104958 | |||||
Rei job #222051 - 2 paul - installation of bms controls conduit and wire for dlr suite in building d suite 250. Permit status: Issued | Permit id: Ew20140813421 | |||||
Less thank 250amp Permit status: Complete | Permit id: Ew20130206721 | |||||
Metro job #60507 - 1st floor - decommission electrical systems and remove - electrical demo Permit status: Filed | Permit id: Ew201512283181 | |||||
Installing a new generator and bus duct from the generator to an existing paralleling gear. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080519463 | |||||
Installation of conduit & wire from existing pdus to starline bus system to power rackable cabinets. 2 paul avenue 1st floor ste. 106 job#29445m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20071113962 | |||||
Renewal of expired permit #ew20071009201 to complete inspections: installation of data processing equipment electrical supply. Permit status: Complete | Permit id: E20101104959 | |||||
Work to be done in suite 103: install a 225a 120 208v panel in suite 103 (fed from suite 106). Install (24) l6- receptacles and (8) l21- receptacles. Tie panel into (e) epo system. 1-225a 1-225a 120 208v 32 receptacles Permit status: Complete | Permit id: E201005067220 | |||||
Install seal tight flex whips with outlets under raised floor in server room. (1st floor) Permit status: Complete | Permit id: E200901286147 | |||||
Computer room 3rd floor qwest ste 304. Witness test only. Permit status: Complete | Permit id: E200503234560 | |||||
1st flr: facebook ste #106- installation of cable raceway (low voltage)data cabling mounting of rackable service cabinets to floor requires drilling of concrete floor Permit status: Complete | Permit id: E200711143181 | |||||
Replacing an existing 3000amp 480v ats switch with new one. Installing a temporary 2 megawatt generator a temporary ats and temporary cabling. Permit status: Complete | Permit id: Ew20100706001 | |||||
Provide & install 8 hid fixtures & 7 flour. Fixtures Permit status: Complete | Permit id: E20021112579 | |||||
Connections to new electrical and mechanical equipment. Permit status: Filed | Permit id: Ew201605238274 | |||||
3 f data center replace generator. Permit status: Complete | Permit id: E201006178162 | |||||
Furnish & install a complete electrical system incl distribution panels; lighting - electrical devices fire alarm & power connections to motors Permit status: Complete | Permit id: E200303255633 | |||||
Install 1 3 phase panel with amp feeder Permit status: Complete | Permit id: E200302204273 | |||||
2nd flr suite d250: f&i(6) 225a panelboards and feeders f&i (88) l6-30r receptacles Permit status: Complete | Permit id: E201604066047 | |||||
Rei job #220171 - t-mobile generator replacement. Installation of 2 new disel generators. The new generators will be connected to a new generator distribution board. The new distribution board will distribute power to existing bypass isolation transfer switches. Control for the new disel generators will be installed in an existing control room. Permit status: Complete | Permit id: Ew201604057286 | |||||
1 circuits; (14) 400v 25a panelboards; 6 ft of basket tray -16-144-08103-09 Permit status: Filed | Permit id: Ew201610181237 | |||||
Furnish and installl 1 new remote stobe panel, 2, new fire life safety device, tie existisng strobes Date: December 3, 2004 Value: $15,975 Permit type: Otc alterations permit | Expiration date: December 3, 2004 | Current use: Office | Permit id: 200412030655 | |||||
Provide submit as built drawings for appl#200412030655 bldg. Is 5 stories not 3 stories on original Date: July 13, 2005 Value: $1 Permit type: Otc alterations permit | Expiration date: July 13, 2005 | Current use: Office | Permit id: 200507137490 | |||||
Sidewalk repair Date: December 13, 2006 Permit type: Otc alterations permit | Expiration date: December 13, 2006 | Permit id: M50922 | |||||
Build out of data storage suite with raised floor,libert floor cooling units,electrical room and roof coolers mounted on (e)steel platform. Sprinkler system previous & fire alarm revision under seperate applications. Date: April 13, 2006 Value: $500,000 Permit type: Additions alterations or repairs | Completion date: September 14, 2006 | Expiration date: December 15, 2005 | Current use: Warehouse,no frnitur | Permit id: 200512150462 | |||||
Install pre-action detection system & audigies for the equipment and electrical room. No office increase. Date: February 14, 2006 Value: $10,500 Permit type: Otc alterations permit | Completion date: June 2, 2006 | Expiration date: February 14, 2006 | Current use: Office | Permit id: 200602144556 | |||||
Add 4 vesda smoke sampling detyector unit in an existing server electricalroomand the each unit to the suites preaction detection system Date: February 21, 2006 Value: $30,000 Permit type: Otc alterations permit | Expiration date: February 21, 2006 | Current use: Office | Permit id: 200602215006 | |||||
Expansion to (e) pre action system. Relocate valve assembly. Underfloor protection. 88 new sprinklers. No increase in size. Date: February 23, 2006 Value: $17,600 Permit type: Otc alterations permit | Completion date: September 14, 2006 | Expiration date: February 23, 2006 | Current use: Office | Permit id: 200602235216 | |||||
Add 2 monitor modules for interface into pre-action system for suite #103. The pre-action system is provided by others under a seperate permit. A relay module is also being added for fsd closure. These fsds are being installed with the pre-action project. Date: May 2, 2006 Value: $1,800 Permit type: Otc alterations permit | Completion date: June 2, 2006 | Expiration date: May 2, 2006 | Current use: Office | Permit id: 200605020385 | |||||
1st floor - tenant improvement on 1 f, new data center and electrical room. Date: November 8, 2006 Value: $4,000,000 Permit type: Additions alterations or repairs | Completion date: December 29, 2006 | Expiration date: August 17, 2006 | Current use: Warehouse,no frnitur | Permit id: 200608179759 | |||||
Alter raised floor design from pedestals w 4" base plates anchored to concrete to 6" bases using adhesive w max stress ratio of 32. 74%, change live load to 1 psf, resubmit design for equipment platform (steel) on roof, rev. To approved building pa#2005 12 15 0462 Date: September 1, 2006 Value: $1 Permit type: Otc alterations permit | Completion date: September 14, 2006 | Expiration date: September 1, 2006 | Current use: Warehouse,no frnitur | Permit id: 200609011303 | |||||
Modification to existing sprinkler system, 4 add ssu. Add new system under floor = 83 ssu. Change to a preaction system. Date: December 18, 2006 Value: $76,000 Permit type: Additions alterations or repairs | Completion date: December 22, 2006 | Expiration date: October 12, 2006 | Current use: Office | Permit id: 200610124781 | |||||
Install pre-action detection in computer room and electrical room on 1st floor. And audibles in computer room on 1st floor. Date: November 7, 2006 Value: $15,000 Permit type: Otc alterations permit | Completion date: January 4, 2007 | Expiration date: November 7, 2006 | Current use: Office | Permit id: 200611077009 | |||||
Addition of monitor modules for interface into a new pre-action systrem (by others) for the building "d" suite 160. Date: November 7, 2006 Value: $2,100 Permit type: Otc alterations permit | Completion date: January 4, 2007 | Expiration date: November 7, 2006 | Current use: Office | Permit id: 200611077014 | |||||
1 new diesel generator in service yard. No other work under this permit. Date: December 21, 2006 Value: $87,000 Permit type: Additions alterations or repairs | Completion date: January 4, 2007 | Expiration date: November 29, 2006 | Current use: Warehouse,no frnitur | Permit id: 200611298692 | |||||
To obtain final inspection for work approved under pa # 201312174361. All work is complete. N a maher Date: March 13, 2017 Value: $1 Permit type: Otc alterations permit | Completion date: March 24, 2017 | Expiration date: March 13, 2017 | Current use: Office | Permit id: 201703131267 | |||||
Fire alarm work to add a fire alarm system at building a & b. Maher: n a Date: April 6, 2017 Value: $38,000 Permit type: Additions alterations or repairs | Expiration date: March 23, 2017 | Current use: Office | Permit id: 201703232138 | |||||
Reinforce wood truss & const. Stair penthouse Date: December 13, 1990 Value: $73,000 Permit type: Additions alterations or repairs | Completion date: January 25, 1991 | Expiration date: August 23, 1990 | Current use: Warehouse,no frnitur | Permit id: 9016715 | |||||
Reroofing Date: August 13, 1997 Value: $400,000 Permit type: Otc alterations permit | Expiration date: August 13, 1997 | Current use: Warehouse,no frnitur | Permit id: 9715399 | |||||
Install board over skip sheeting Date: August 21, 1997 Value: $75,000 Permit type: Otc alterations permit | Expiration date: August 21, 1997 | Current use: Warehouse,no frnitur | Permit id: 9716175 | |||||
Removal of architectural banners assessible parking entrance Date: December 18, 1997 Value: $70,000 Permit type: Otc alterations permit | Expiration date: December 18, 1997 | Current use: Warehouse,no frnitur | Permit id: 9725329 | |||||
Voluntary seismic upgrade Date: December 18, 1997 Value: $120,000 Permit type: Additions alterations or repairs | Expiration date: December 18, 1997 | Current use: Warehouse,no frnitur | Permit id: 9725331 | |||||
Install 5 sprinkler heads Date: January 20, 1998 Value: $1,000 Permit type: Otc alterations permit | Expiration date: January 20, 1998 | Current use: Warehouse,no frnitur | Permit id: 9800893 | |||||
Revision to 9725329 Date: January 26, 1998 Value: $1 Permit type: Otc alterations permit | Expiration date: January 26, 1998 | Current use: Warehouse,no frnitur | Permit id: 9801338 | |||||
Minor tenant improvemnt-enterprise zone,arch barriers remove Date: November 2, 1998 Value: $135,000 Permit type: Additions alterations or repairs | Expiration date: September 10, 1998 | Current use: Warehouse,no frnitur | Permit id: 9818110 | |||||
Ez-minor tenant improvements architectural barriers Date: November 2, 1998 Value: $80,000 Permit type: Otc alterations permit | Expiration date: November 2, 1998 | Current use: Warehouse, furniture | Permit id: 9822513 | |||||
Interior demolition, knock out for new openings Date: March 21, 1984 Value: $10,000 Permit type: Additions alterations or repairs | Completion date: October 12, 1984 | Expiration date: March 6, 1984 | Current use: Warehouse,no frnitur | Permit id: 8402357 | |||||
And 9 new truck loading docks 8x9 in concrete wall. Date: May 24, 1984 Value: $200,000 Permit type: Additions alterations or repairs | Completion date: November 19, 1985 | Expiration date: March 8, 1984 | Current use: Warehouse,no frnitur | Permit id: 8402509 | |||||
Fire sprinkler Date: January 12, 1999 Value: $3,000 Permit type: Otc alterations permit | Expiration date: January 12, 1999 | Current use: Office | Permit id: 9900684 | |||||
Minor tenant improvement, change to permit #864167 Date: January 15, 1999 Value: $100 Permit type: Otc alterations permit | Expiration date: January 15, 1999 | Current use: Warehouse, furniture | Permit id: 9900948 | |||||
Construct new partitions,installation-electricl & hvac Date: May 4, 1999 Value: $4,000,000 Permit type: Additions alterations or repairs | Completion date: January 20, 2000 | Expiration date: February 18, 1999 | Current use: Manufacturing | Permit id: 9903140 | |||||
Accessible toilet room and corridor, telephone cable vaults Date: June 14, 1999 Value: $400,000 Permit type: Additions alterations or repairs | Completion date: December 14, 1999 | Expiration date: February 24, 1999 | Current use: Warehouse,no frnitur | Permit id: 9903599 | |||||
Roof top grille screening,install drycoolers pumps &steel gr Date: June 18, 1999 Value: $250,000 Permit type: Additions alterations or repairs | Completion date: January 20, 2000 | Expiration date: February 26, 1999 | Current use: Warehouse, furniture | Permit id: 9903754 | |||||
Demo 0f (e)type 3 bldg in order to install new emergency Date: March 19, 1999 Value: $100,000 Permit type: Additions alterations or repairs | Completion date: December 14, 1999 | Expiration date: March 3, 1999 | Current use: Warehouse,no frnitur | Permit id: 9904100 | |||||
Interior tenant imprvmnt-construct telecom facility,hvac Date: June 28, 1999 Value: $100,000 Permit type: Additions alterations or repairs | Expiration date: April 6, 1999 | Current use: Manufacturing | Permit id: 9906554 | |||||
Reroofing Date: May 12, 1999 Value: $240,000 Permit type: Otc alterations permit | Expiration date: May 12, 1999 | Current use: Office | Permit id: 9909348 | |||||
Install 1 hr wall install partition walls between office Date: May 28, 1999 Value: $150,000 Permit type: Additions alterations or repairs | Completion date: June 13, 2001 | Expiration date: May 25, 1999 | Current use: Office | Permit id: 9910268 | |||||
Install mechanical and electrical Date: May 28, 1999 Value: $75,000 Permit type: Additions alterations or repairs | Completion date: June 13, 2001 | Expiration date: May 25, 1999 | Current use: Office | Permit id: 9910269 | |||||
Installation of fire sprinkler @ 4th fl Date: July 7, 1999 Value: $266,864 Permit type: Additions alterations or repairs | Completion date: January 20, 2000 | Expiration date: May 26, 1999 | Current use: Office | Permit id: 9910451 | |||||
Installation of a new addressable fire alarm system Date: June 8, 1999 Value: $28,000 Permit type: Otc alterations permit | Completion date: December 14, 1999 | Expiration date: June 8, 1999 | Current use: Office | Permit id: 9911344 | |||||
Installation of complete fire alarm system buildout Date: June 8, 1999 Value: $24,900 Permit type: Otc alterations permit | Expiration date: June 8, 1999 | Current use: Office | Permit id: 9911345 | |||||
Struct steel supports(12 satellite dish under sep permit) Date: June 19, 1999 Value: $35,000 Permit type: Additions alterations or repairs | Completion date: June 13, 2001 | Expiration date: June 9, 1999 | Current use: Office | Permit id: 9911347 | |||||
Roof screen plans bldg unit f Date: November 1, 1999 Value: $120,000 Permit type: Additions alterations or repairs | Expiration date: June 15, 1999 | Current use: Warehouse,no frnitur | Permit id: 9911833 | |||||
Install 3 fm2 with areaction interface Date: October 1, 1999 Value: $518,188 Permit type: Additions alterations or repairs | Expiration date: June 23, 1999 | Current use: Office | Permit id: 9912514 | |||||
Fire alarm system addition Date: July 8, 1999 Value: $14,750 Permit type: Otc alterations permit | Completion date: June 13, 2001 | Expiration date: July 8, 1999 | Current use: Office | Permit id: 9913907 | |||||
Fire alarm system addition Date: July 8, 1999 Value: $10,200 Permit type: Otc alterations permit | Expiration date: July 8, 1999 | Current use: Office | Permit id: 9913908 | |||||
Revise to app #9911347 revise structural steel supports Date: July 21, 1999 Value: $1 Permit type: Additions alterations or repairs | Completion date: June 13, 2001 | Expiration date: July 9, 1999 | Current use: Office | Permit id: 9913958 | |||||
Provide fire protection 3rd floor, fire sprinkler,pre action Date: August 20, 1999 Value: $43,000 Permit type: Additions alterations or repairs | Expiration date: July 16, 1999 | Current use: Warehouse,no frnitur | Permit id: 9914466 | |||||
12 satellite dishes and hchv equip (3 dry coolers pumps vfd) Date: March 18, 2000 Value: $15,000 Permit type: Additions alterations or repairs | Expiration date: July 20, 1999 | Current use: Office | Permit id: 9914706 | |||||
Install fm2 fire suppression system Date: July 28, 1999 Value: $31,750 Permit type: Otc alterations permit | Expiration date: July 28, 1999 | Current use: Office | Permit id: 9915406 | |||||
Install fm2 fire suppression system Date: July 28, 1999 Value: $36,081 Permit type: Otc alterations permit | Completion date: December 14, 1999 | Expiration date: July 28, 1999 | Current use: Office | Permit id: 9915407 | |||||
App #9903599 permit # for building 881152 Date: September 2, 1999 Value: $125,000 Permit type: Additions alterations or repairs | Completion date: December 14, 1999 | Expiration date: August 4, 1999 | Current use: Warehouse,no frnitur | Permit id: 9915941 | |||||
Install preaction system total of three Date: August 5, 1999 Value: $80,000 Permit type: Otc alterations permit | Expiration date: August 5, 1999 | Current use: Office | Permit id: 9916099 | |||||
Construct reinforced concrete pad for generator Date: February 12, 2000 Value: $5,000 Permit type: Additions alterations or repairs | Expiration date: August 11, 1999 | Current use: Office | Permit id: 9916489 | |||||
Install fuel tank, generator, fuel line rack supports Date: October 3, 2000 Value: $85,000 Permit type: Additions alterations or repairs | Expiration date: September 3, 1999 | Current use: Warehouse,no frnitur | Permit id: 9918573 | |||||
Deletion of fire alarm devices for the 5th floor Date: September 16, 1999 Value: $1 Permit type: Otc alterations permit | Expiration date: September 16, 1999 | Current use: Office | Permit id: 9919528 | |||||
Phase 11 - add detection & fm2 gas to the new underfloor Date: November 29, 1999 Value: $85,400 Permit type: Additions alterations or repairs | Expiration date: October 22, 1999 | Current use: Office | Permit id: 9922544 |