Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 15000-00759: accesibility upgrades in parking lot and interior path of travel Date: July 24, 2015 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 15rev-00431 | |||||
SCORE 81 Commercial evse installation 2 volt tesla high powered wall connector for electric car in parking area #302 Date: August 9, 2013 Contractor: Archbold Electric Inc Permit status: Permit issued | Permit id: 13000-02110 | |||||
SCORE 76 Flipboard, suites 2 and 232 homer: ti and u&o for a 4154 sf tenant space on the first floor. Area of work: 214 sf. No change to the exterior of the building. U&o sent 10 30 13 Permit status: Permit issued | Permit id: 13000-01643 | |||||
SCORE 76 (13000-01643) shortening interior wall and changing material of wall. Date: July 17, 2013 Contractor: Jeff Portusach Permit status: Permit issued | Permit id: 13rev-00456 | |||||
SCORE 86 Commercial sewer: replace 35-feet of 4-inch waste from the cleanout at the bathroom to the cleanout at the planter strip. No exterior work at the building. Street work permit under 12str-00080 Date: May 10, 2012 Contractor: Palo Alto Plumbing Permit status: Permit issued | Permit id: 12000-01080 | |||||
SCORE 93 11-2722: deferred submittal for structural drawings for folding partition. Calculations were part of original permit. Date: January 12, 2012 Contractor: Skyline Construction Permit status: Permit issued | Permit id: 12rev-00021 | |||||
SCORE 100 Citi ventures: remodel for (e) first floor tenant. Scope of work includes replacing a moveable partition and creating an office. Permit status: Permit issued | Permit id: 15000-00759 |