Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Install furnace Date: March 7, 2016 Contractor: Action Plumbing Heating And Air Permit type: Mechanical | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-02059 | |||||
Existing tile roof will be removed and replaced with architectural asphalt shingles. It is not known whether ice and water are currently installed. They will be installed to code when complete. Date: August 31, 2016 Permit type: Roofing | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-08231 | |||||
SCORE 100 Date: March 7, 2016 Contractor: Na Permit id: Bld2016-02059 | |||||
SCORE 100 Date: September 1, 2016 Contractor: Na Permit id: Bld2016-08231 | |||||
Fencing Date: April 28, 2017 Permit status: Inspections | Current use: Residential | Permit id: Bld2017-03433 | |||||
SCORE 69 Solarpv Date: June 6, 2017 Contractor: Redsun Construction. Llc Permit status: Inspections | Current use: Residential | Permit id: Bld2017-04698 | |||||
SCORE 93 Electrical Date: June 21, 2017 Contractor: Shield Electric Permit status: Closed | Current use: Residential | Permit id: Bld2017-05364 |