Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit ![]() Permit status: Completed | Permit id: 724540 | |||||
Administrative permit ![]() Permit status: Completed | Permit id: 554903 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 598308 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 562383 | |||||
Use permit ![]() Permit status: Completed | Permit id: 554000 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 464714 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 603987 | |||||
Certificate for the erection of a first story addition and a rear stair enclosure as part of an existing four (4) story structure for use as a restaurant (minimum thirty (30) seats, food served on non-disposable ware) with live entertainment on the first floor and cellar with accessory storage with an existing architects office on the second floor and for a two (2) family dwelling on the third and fourth floors of an existing attached structure. ![]() Applicant: David G. Orphanides, Esquire | Permit type: Appeal | Permit status: Withdrawn | Permit id: 9119 | |||||
Administrative permit ![]() Permit status: Completed | Permit id: 554903 | |||||
Use permit ![]() Permit status: Completed | Permit id: 724540 | |||||
Use permit ![]() Permit status: Completed | Permit id: 554000 | |||||
Use permit ![]() Permit status: Completed | Permit id: 733560 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 562383 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 598308 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 603987 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 464714 | |||||
Certificate for the erection of a first story addition and a rear stair enclosure as part of an existing four (4) story structure for use as a restaurant (minimum thirty (30) seats, food served on non-disposable ware) with live entertainment on the first floor and cellar with accessory storage with an existing architects office on the second floor and for a two (2) family dwelling on the third and fourth floors of an existing attached structure. ![]() Applicant: David G. Orphanides, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 9119 | |||||
Special exception for a takeout restaurant on 1st floor with all other uses as previously approved in an existing structure. ![]() Applicant: John Christinzio | Permit type: Appeal | Permit status: Granted/prov | Permit id: 29288 | |||||
For level ii alterations w. No change of occupancy classification within an exist. Four (4) story mixed-use office building to include erection of fire-resistance rated construction @ exist. Stairway opening, installation of new stairway within exist. Vertical opening, & erection of new roof & skylights @ stairway enclosure; work areas are not fully sprinklered. All permitted work in accordance with plans approved by the phc dated 04. 14. 13. No change in height or area of exist. Exterior wall openings permitted herein. ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 464714 | |||||
SCORE 100 1-fire alarm main panel strobes, horns & pull station as per nfpa 72 west district (multi family) ![]() ![]() Permit type: Electrical permit | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 603987 | |||||
SCORE 89 Install 11 gfci throughout per plans, per nec code 2008 cc district ![]() ![]() Permit type: Electrical permit | Permit status: Completed | Completion date: May 11, 2017 | Permit id: 766757 | |||||
SCORE 92 For interior alterations to existing space to include new interior partitions and interior finishes, as per approved plans. No signs on this permit. ![]() ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: May 11, 2017 | Permit id: 746925 | |||||
SCORE 100 Alterations: interio0r plumbing; restaurant - the installation shall comply with the philadelphia plumbing code, 2004 ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 770398 | |||||
For an amendment of permit# 464714, issued for level ii alterations w. No change of occupancy classification, for certification of existing building as type iiia construction, correction of occupancy classification of mixed-use building as b r-3, & to modify previously approved stairway construction from steel to wood construction. Certificate of occupancy (co) for documentation purposes only w. Regards to construction type; premises to comply with all applicable provisions of the philadelphia fire & property maintenance codes. ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 523433 | |||||
For the use of wearing apparel and accessories on the first floor. In same building with an existing architects office on second floor and vacant third and fourth floors for uses as permitted in the district. ![]() Permit type: Use permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 554000 | |||||
SCORE 100 Interior electrical alterations in a mixed-use property (business professional office and vacant) - wire (15)luminaires and (4)emergency lights on the stairway only - work will comply with the 2008 nec ![]() ![]() Permit type: Electrical permit | Permit status: Completed | Completion date: January 20, 2015 | Permit id: 562383 | |||||
SCORE 100 All wood sash replacement kits in existing wood openings as per attached drawings approved by the historical commission(9 units total) ![]() ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2015 | Permit id: 598308 | |||||
Certificate of occupancy for the retail sale of wearing apparel and accessories on the first floor of an existing building. No work or alterations associated with this permit. Compliance with fire and property maintenance codes required prior to occupancy. ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: November 5, 2014 | Permit id: 554903 |