Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit Date: September 26, 2016 Permit status: Completed | Permit id: 724540 | |||||
Administrative permit Date: October 30, 2014 Permit status: Completed | Permit id: 554903 | |||||
Alteration permit Date: March 25, 2015 Permit status: Completed | Permit id: 598308 | |||||
Electrical permit Date: September 17, 2014 Permit status: Completed | Permit id: 562383 | |||||
Use permit Date: August 11, 2014 Permit status: Completed | Permit id: 554000 | |||||
Alteration permit Date: July 31, 2013 Permit status: Completed | Permit id: 464714 | |||||
Electrical permit Date: April 30, 2015 Permit status: Completed | Permit id: 603987 | |||||
Certificate for the erection of a first story addition and a rear stair enclosure as part of an existing four (4) story structure for use as a restaurant (minimum thirty (30) seats, food served on non-disposable ware) with live entertainment on the first floor and cellar with accessory storage with an existing architects office on the second floor and for a two (2) family dwelling on the third and fourth floors of an existing attached structure. Date: May 19, 2009 Applicant: David G. Orphanides, Esquire | Permit type: Appeal | Permit status: Withdrawn | Permit id: 9119 | |||||
Administrative permit Date: October 30, 2014 Permit status: Completed | Permit id: 554903 | |||||
Use permit Date: September 26, 2016 Permit status: Completed | Permit id: 724540 | |||||
Use permit Date: August 11, 2014 Permit status: Completed | Permit id: 554000 | |||||
Use permit Date: January 20, 2017 Permit status: Completed | Permit id: 733560 | |||||
Electrical permit Date: September 17, 2014 Permit status: Completed | Permit id: 562383 | |||||
Alteration permit Date: March 25, 2015 Permit status: Completed | Permit id: 598308 | |||||
Electrical permit Date: April 30, 2015 Permit status: Completed | Permit id: 603987 | |||||
Alteration permit Date: July 31, 2013 Permit status: Completed | Permit id: 464714 | |||||
Certificate for the erection of a first story addition and a rear stair enclosure as part of an existing four (4) story structure for use as a restaurant (minimum thirty (30) seats, food served on non-disposable ware) with live entertainment on the first floor and cellar with accessory storage with an existing architects office on the second floor and for a two (2) family dwelling on the third and fourth floors of an existing attached structure. Date: May 19, 2009 Applicant: David G. Orphanides, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 9119 | |||||
Special exception for a takeout restaurant on 1st floor with all other uses as previously approved in an existing structure. Date: November 28, 2016 Applicant: John Christinzio | Permit type: Appeal | Permit status: Granted/prov | Permit id: 29288 | |||||
For level ii alterations w. No change of occupancy classification within an exist. Four (4) story mixed-use office building to include erection of fire-resistance rated construction @ exist. Stairway opening, installation of new stairway within exist. Vertical opening, & erection of new roof & skylights @ stairway enclosure; work areas are not fully sprinklered. All permitted work in accordance with plans approved by the phc dated 04. 14. 13. No change in height or area of exist. Exterior wall openings permitted herein. Date: July 31, 2013 Permit type: Alteration permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 464714 | |||||
SCORE 100 1-fire alarm main panel strobes, horns & pull station as per nfpa 72 west district (multi family) Date: April 30, 2015 Contractor: Tech Electric Services Inc Permit type: Electrical permit | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 603987 | |||||
SCORE 89 Install 11 gfci throughout per plans, per nec code 2008 cc district Date: April 24, 2017 Contractor: Mateen And Sons Permit type: Electrical permit | Permit status: Completed | Completion date: May 11, 2017 | Permit id: 766757 | |||||
SCORE 92 For interior alterations to existing space to include new interior partitions and interior finishes, as per approved plans. No signs on this permit. Date: March 9, 2017 Contractor: Fci Group Llc Permit type: Alteration permit | Permit status: Completed | Completion date: May 11, 2017 | Permit id: 746925 | |||||
SCORE 100 Alterations: interio0r plumbing; restaurant - the installation shall comply with the philadelphia plumbing code, 2004 Date: April 25, 2017 Contractor: Suburban Heating And Plumbing Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 770398 | |||||
For an amendment of permit# 464714, issued for level ii alterations w. No change of occupancy classification, for certification of existing building as type iiia construction, correction of occupancy classification of mixed-use building as b r-3, & to modify previously approved stairway construction from steel to wood construction. Certificate of occupancy (co) for documentation purposes only w. Regards to construction type; premises to comply with all applicable provisions of the philadelphia fire & property maintenance codes. Date: May 19, 2014 Permit type: Administrative permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 523433 | |||||
For the use of wearing apparel and accessories on the first floor. In same building with an existing architects office on second floor and vacant third and fourth floors for uses as permitted in the district. Date: August 11, 2014 Permit type: Use permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 554000 | |||||
SCORE 100 Interior electrical alterations in a mixed-use property (business professional office and vacant) - wire (15)luminaires and (4)emergency lights on the stairway only - work will comply with the 2008 nec Date: September 17, 2014 Contractor: Prompt Plumbing And Mechanical Permit type: Electrical permit | Permit status: Completed | Completion date: January 20, 2015 | Permit id: 562383 | |||||
SCORE 100 All wood sash replacement kits in existing wood openings as per attached drawings approved by the historical commission(9 units total) Date: March 25, 2015 Contractor: Emerald Windows Inc Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2015 | Permit id: 598308 | |||||
Certificate of occupancy for the retail sale of wearing apparel and accessories on the first floor of an existing building. No work or alterations associated with this permit. Compliance with fire and property maintenance codes required prior to occupancy. Date: October 30, 2014 Permit type: Administrative permit | Permit status: Completed | Completion date: November 5, 2014 | Permit id: 554903 |