Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Re-roof apartment building with 3-tab shingles, squares, 9:12 pitch. Date: July 11, 2002 Contractor: A A A Roofing And Insulation Client: K F | Applicant: A A A Roofing & Insulation | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 72 Replace deck boards and railings, direct replacement of existing, possible replacement of a few joists, scope of work does not include significant removal or replacement of existing structure, on second floor deck in front of multi-family residence. Client: Llc Eha | Applicant: Mark Hagemann | Permit type: Building | Permit status: Cmp | Completion date: March 16, 2009 | Current use: Multifamily dwe | |||||
SCORE 95 Tear-off & reroof of apt. Bidg., 24 squares of asphalt shingles on a pitch represented as 6 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. There is also part of the roof that is flat. Date: December 13, 2013 Contractor: Black Roofing Inc Client: Pine 1915.0 | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Tear-off & reroof of apt. Bidg., 24 squares of asphalt shingles on a pitch represented as 6 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. There is also part of the roof that is flat. Client: Pine | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-07010 | |||||
SCORE 100 Re-roof apartment building with 3-tab shingles, squares, 9:12 pitch. Client: K F | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2002-02906 |