Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr project proposes to drill 3 direct push borings nebbd-68e-1 ? Nebbd-68e-2, nebbd-68e-3 located at 1906 west virginia ave ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals, plus vanadium, pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. Upon completion, boring will be backfilled with bentonite pellets in 2 foot flights. The amount of water to be used to hydrate the bentonite is contingent on field conditions due to presence of shallow groundwater. Prior to completion, the bore Date: November 1, 2013 Client: Robert Garrett District Of Columbia | Applicant: Chris Willett Urs Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400048 | |||||
SCORE 70 Dccr project proposes to drill 3 direct push borings nebbd-68e-1 ? Nebbd-68e-2, nebbd-68e-3 located at 1906 west virginia ave ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals, plus vanadium, pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. Upon completion, boring will be backfilled with bentonite pellets in 2 foot flights. The amount of water to be used to hydrate the bentonite is contingent on field conditions due to presence of shallow groundwater. Prior to completion, the bore Date: November 1, 2013 Contractor: Chris Willett Urs Corporation Client: Robert Garrett District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400048 |