Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Sub permit cannot be issued until bld2015-057 is approved. Any unpermitted work will result in a swo and fines. Repair plumbing for remodel of home Date: September 1, 2015 Contractor: Inline Plumbing Permit type: Plumbing | Permit status: Applicant info required | Completion date: September 1, 2015 | Current use: Residential | Permit id: Bld2015-07055 | |||||
SCORE 100 Please arrange payment of the balance due. Kitchen, family room, main level remodel Date: August 21, 2015 Contractor: Zap Electric Llc Permit type: Electrical | Permit status: Applicant info required | Completion date: September 1, 2015 | Current use: Residential | Permit id: Bld2015-06932 | |||||
SCORE 61 Moving interior walls on the main floor to make room for a bigger kitchen, creating a master bathroom, adding a 2nd bathroom on the main floor and removing a sunroom room and reframing walls and roof on existing foundation to create a master bedroom and office. This scope of work will involve some new spot footings, structure framing, some new electrical, new plumbing and insulation. We will also be installing new windows and doors and removing the aluminum siding and replace with wood siding on the exterior and installing new shingles on the roof. Date: July 23, 2015 Contractor: Jackson And Leroy Remodeling Permit type: Permit | Permit status: Corrections required | Completion date: September 2, 2015 | Current use: Residential | Permit id: Bld2015-05700 | |||||
SCORE 100 Water heater install Date: March 6, 2014 Contractor: Whipple Service Champions Permit type: Plumbing | Permit status: Completed | Completion date: March 6, 2014 | Current use: Residential | Permit id: Bld2014-01453 | |||||
SCORE 64 Repair plumbing for remodel of home Date: September 1, 2015 Contractor: Inline Plumbingrita Pingree Permit type: Plumbing | Permit status: Inspections | Completion date: September 16, 2015 | Current use: Residential | Permit id: Bld2015-07055 | |||||
SCORE 64 Kitchen, family room, main level remodel Date: August 21, 2015 Contractor: Zap Electric Llcpingree Remodel Permit type: Electrical | Permit status: Inspections | Completion date: September 3, 2015 | Current use: Residential | Permit id: Bld2015-06932 | |||||
SCORE 64 Moving interior walls on the main floor to make room for a bigger kitchen, creating a master bathroom, adding a 2nd bathroom on the main floor and removing a sunroom room and reframing walls and roof on existing foundation to create a master bedroom and office. This scope of work will involve some new spot footings, structure framing, some new electrical, new plumbing and insulation. We will also be installing new windows and doors and removing the aluminum siding and replace with wood siding on the exterior and installing new shingles on the roof. Date: July 23, 2015 Permit type: Permit | Permit status: Inspections | Completion date: September 16, 2015 | Current use: Residential | Permit id: Bld2015-05700 | |||||
SCORE 64 Water heater install Date: March 6, 2014 Contractor: Whipple Service Championscoombs Install Permit type: Plumbing | Permit status: Inspections | Completion date: March 6, 2014 | Current use: Residential | Permit id: Bld2014-01453 | |||||
Install 11 solar panels onto south side of roof r. M. A. H. D. W. Date: October 12, 2012 Permit type: Permit | Permit status: Pass | Completion date: March 7, 2013 | Current use: Residential | Permit id: Bld2012-07588 | |||||
Elec work to install solar panels Date: October 12, 2012 Permit type: Electrical | Permit status: Pass | Completion date: October 18, 2012 | Current use: Residential | Permit id: Bld2012-07589 | |||||
Replace windows on main level and basement, cut 2 larger openings for egress on basement windows, r-1/7000, not historic, wells at max 3 deep 6 wide in side yard, east tb as Date: February 22, 2011 Permit type: Permit | Permit status: Pass | Completion date: January 30, 2013 | Current use: Residential | Permit id: Bld2011-01090 | |||||
SCORE 61 Moving interior walls on the main floor to make room for a bigger kitchen, creating a master bathroom, adding a 2nd bathroom on the main floor and removing a sunroom room and reframing walls and roof on existing foundation to create a master bedroom and office. This scope of work will involve some new spot footings, structure framing, some new electrical, new plumbing and insulation. We will also be installing new windows and doors and removing the aluminum siding and replace with wood siding on the exterior and installing new shingles on the roof. Date: March 18, 2016 Contractor: Rita Pingree House Remodelrandy Page Permit status: Closed | Current use: Residential | Permit id: Bld2015-05700 | |||||
SCORE 56 Replace windows on main level and basement, cut 2 larger openings for egress on basement windows, r-1/7000, not historic, wells at max 3 deep 6 wide in side yard, east tb as Date: February 22, 2011 Contractor: Judson Enterprises Inc.Coombs Residence Permit status: Closed | Completion date: January 30, 2013 | Current use: Residential | Permit id: Bld2011-01090 | |||||
SCORE 59 Install 11 solar panels onto south side of roof r. M. A. H. D. W. Date: October 12, 2012 Permit status: Closed | Completion date: March 7, 2013 | Current use: Residential | Permit id: Bld2012-07588 | |||||
SCORE 59 Elec work to install solar panels Date: October 12, 2012 Permit type: Electrical | Permit status: Closed | Completion date: October 18, 2012 | Current use: Residential | Permit id: Bld2012-07589 |