SCORE 98 Addition of 578 s. F. Rooftop community deck for the hub apartment complex. Client: Apartments Hub | Applicant: Craig Bundy | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 84 Installation of a rooftop deck and relocation of existing rooftop mechanical equipment. No change is proposed to the existing height of the building. Client: Apartments Sinton | Applicant: Peak Construction, Llc | Permit type: Building, mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 84 Renovation of covered entry. Client: Apartments Sinton | Applicant: Peak Construction, Llc | Permit type: Building | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 84 Remodel of community room on main level, create fitness room on top level. Add a wet bar in community room. Mechanical work will involve redirecting a supply air duct and installing a ventless gas fired fireplace in the community room, and mechanical work involved in hvac changes for fitness room. Client: Apartments Sinton | Applicant: Peak Construction, Llc | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 99 Drwall repair to units 400, 403, 405,407 and 300. Replace insulation water damage Client: Apartments Hub | Applicant: Disaster Restoration, Inc. | Permit type: Building | Permit status: Cmp | Completion date: June 1, 2007 | Current use: Multifamily dwe | |||||
SCORE 99 R & r existing handicap ramp Date: March 9, 2010 Contractor: Total Concrete Services Inc Client: Apartments Hub | Applicant: Total Concrete Services Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 91 New roof top decks (16) to be built atop existing roof at hub apartments. Decks to be completed by jan 1, 2012 per development agreement dated jan. 25th, 2006. Client: Apartments Hub | Applicant: Milender White Construction Co | Permit type: Building | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 99 Remove existing roofing and install epdm on exisitng apartment building. 8. 23 squares, flat roof. Date: January 6, 2012 Contractor: Academy Roofing Inc Client: Hub Considine | Applicant: Academy Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: January 20, 2012 | Current use: Multifamily dwe | |||||
SCORE 99 Partial tear-off and reroof of a carport structure (associated with a multifamily dwelling unit) epdm over densedeck or equivalent 32 squares on a inchflatinch roof (min 1 4 in 12 slope required for drainage) pre-reroof and mid-roof inspections required. Client: Hub Considine | Applicant: Academy Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Multifamily dwe | |||||
SCORE 56 Tear-off of an existing roofing surface, decking and insulation and reslope drainage plane, install interior roof drains and associated plumbing, install new insulation and new class a roofing surface. Construct 15 residential decks and wing walls totalling 3,2 sf and a common deck of 5 sf to result in a total of 38 sf. Removal of a window in each residential unit and conversion of the window opening to a doorway, install new siding. Includes minor electrical and mechanical modifcations. See adr2012-00077 for supplemental information. Client: Hub Considine | Applicant: David Thermos | Permit type: Building, electrical | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 72 Total tear-off & reroof of mfd, 175 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Date: August 27, 2013 Contractor: Needham Roof Systems Inc Client: Hub Considine | Applicant: Needham Roof Systems Inc | Permit type: Roofing | Permit status: Cmp | Completion date: October 9, 2013 | Current use: Multifamily dwe | |||||
SCORE 72 Overlay of squares of mil tpo membrane with taper insulation on top of existing flat roof. Date: January 7, 2014 Contractor: Needham Roof Systems Inc Client: Hub Considine | Applicant: Needham Roof Systems Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 30, 2014 | Current use: Multifamily dwe | |||||
SCORE 99 Partial tear-off and reroof of a carport structure (associated with a multifamily dwelling unit) epdm over densedeck or equivalent 32 squares on a inchflatinch roof (min 1 4 in 12 slope required for drainage) pre-reroof and mid-roof inspections required. Client: Hub Considine | Permit type: Roofing | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Multifamily dwellings, existing, carport | Permit id: Pmt2013-00320 | |||||
Tear-off of an existing roofing surface, decking and insulation and reslope drainage plane, install interior roof drains and associated plumbing, install new insulation and new class a roofing surface. Construct 15 residential decks and wing walls totalling 3,2 sf and a common deck of 5 sf to result in a total of 38 sf. Removal of a window in each residential unit and conversion of the window opening to a doorway, install new siding. Includes minor electrical and mechanical modifcations. See adr2012-00077 for supplemental information. Date: January 16, 2015 Value: $800,000 Client: Hub Considine | Permit type: Building, electrical, mechanical, plumbing, roofing | Permit status: N&v | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2013-01731 | |||||
SCORE 72 Total tear-off & reroof of mfd, 175 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Client: Hub Considine | Permit type: Roofing | Permit status: Cmp | Completion date: October 9, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-04276 | |||||
SCORE 72 Overlay of squares of mil tpo membrane with taper insulation on top of existing flat roof. Client: Hub Considine | Permit type: Roofing | Permit status: Cmp | Completion date: January 30, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-00084 | |||||
SCORE 99 Remove existing roofing and install epdm on exisitng apartment building. 8. 23 squares, flat roof. Client: Hub Considine | Permit type: Roofing | Permit status: Cmp | Completion date: January 20, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00084 | |||||
Addition of 578 s. F. Rooftop community deck for the hub apartment complex. Date: July 7, 2005 Value: $10 Client: Apartments Hub | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2005-02354 | |||||
SCORE 84 Remodel of community room on main level, create fitness room on top level. Add a wet bar in community room. Mechanical work will involve redirecting a supply air duct and installing a ventless gas fired fireplace in the community room, and mechanical work involved in hvac changes for fitness room. Client: Apartments Sinton | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Multifamily dwellings, remodel | Permit id: Pmt2004-01464 | |||||
SCORE 84 Renovation of covered entry. Client: Apartments Sinton | Permit type: Building | Permit status: N&v | Current use: Multifamily dwellings, remodel | Permit id: Pmt2004-01501 | |||||
SCORE 84 Installation of a rooftop deck and relocation of existing rooftop mechanical equipment. No change is proposed to the existing height of the building. Value: $7,000 Contractor: Peak Construction, Llc Client: Apartments Sinton | Permit type: Building, mechanical | Permit status: N&v | Current use: Multifamily dwellings, alteration | Permit id: Pmt2004-03531 | |||||
Addition of 578 s. F. Rooftop community deck for the hub apartment complex. Date: July 7, 2005 Value: $10,000 Client: Apartments Hub | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2005-02354 | |||||
SCORE 99 Drwall repair to units 400, 403, 405,407 and 300. Replace insulation water damage Client: Apartments Hub | Permit type: Building | Permit status: Cmp | Completion date: June 1, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-00636 | |||||
SCORE 91 New roof top decks (16) to be built atop existing roof at hub apartments. Decks to be completed by jan 1, 2012 per development agreement dated jan. 25th, 2006. Value: $72,608 Contractor: Milender White Construction Co Client: Apartments Hub | Permit type: Building | Permit status: N&v | Current use: Multifamily dwellings, existing, deck, a | Permit id: Pmt2010-01249 | |||||
Renovation of lobby lounge area on ground floor of structure. To include enlarged leasing office, new kitchen cabinetry, countertop, appliances and fixtures, new bath fixtures and accessories, new finishes and lighting Value: $119,993 Client: View The | Permit type: Building, electrical, plumbing | Permit status: Act | Current use: Multifamily dwellings, remodel | Permit id: Pmt2017-04347 |