Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: August 24, 2017 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Addn | Permit status: Completed | Completion date: September 27, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 21, 2017 Contractor: Rooftop Solar Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: May 26, 2006 Permit status: Pass | Permit id: Pds2006-1007-20 |