Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. Install 6. 7kw solar array. Date: March 1, 2016 Contractor: Pinnacle Roofing Profess Llc Permit type: Electrical | Permit status: Permit closed | Completion date: June 15, 2016 | Expiration date: March 1, 2017 | Current use: Single family / duplex | Permit id: 6521577 |