Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Replacement of furnace and a/c in sfd. New ducting was installed, but never tested. Trane 2 stage variable speed 97%. Date: March 2, 2015 Contractor: Atlas Heating And Air Conditioning Inc Permit status: Issued | Permit id: B15-0816 | |||||
SCORE 86 Installation of 18 panel photovoltaic system Date: October 22, 2014 Contractor: Jbl Solar Energy Permit status: Finaled | Permit id: B14-4261 | |||||
SCORE 89 Replacement of furnace and a c in sfd. New ducting was installed, but never tested. Trane 2 stage variable speed 97 percent. Date: March 2, 2015 Contractor: Atlas Heating And Air Conditioning Inc Permit type: Residential mechanical | Permit status: Finaled | Current use: Residential | Permit id: B15-0816 | Parcel: 180320038 | |||||
SCORE 100 Demo of shed roof over hot tub - relocate hot tub equipment - disconnect electrical from shed - install 2 sliders and a window - kitchen sink - electrical to provide branch circuit to hot tub - plumbing gas line to hot tub equipment - Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B15-1785 | Parcel: 180320038 |