Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 24, 2014 Contractor: Wulff Mechanical Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2014-Resalt- | |||||
SCORE 93 2 amps upgrade for existing sfd Date: July 17, 2007 Contractor: Vaughn Electric Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 183-341-05-00 | |||||
SCORE 99 Demolition of pool (e) sfd. Note: _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa pds offices (55 overland ave., suite 110) for more information. Date: March 19, 2015 Contractor: Allstar Demolition Inc Permit type: Demolition all other buildings | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 183-341-05-00 |