Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Renovations to existing 9th floor office space, pcori as shown on the attached mech., plumb., elect. ,fire protection, and architectural dwgs. Interior work only. Date: February 7, 2012 Client: Washington Automotive Company | Applicant: Pcori; John Giuseppe | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1203073 | |||||
Tenant build out of two suites on the 8th floor to include offices, pantries, conference rooms, copier rooms, work rooms, and reception areas. Date: February 1, 2012 Client: The Tower Companies | Applicant: The Tower Companies; Colin Clark | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1201903 | |||||
Interior alteration and repair suite 10 for a tenant expansion to inlcude electrical and mechanical work. Date: August 17, 2012 Client: Washington Automotive Company | Applicant: The Tower Companies; Colin Clark | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1212923 | |||||
Installation of office furniture in an existing office tenant suite. Date: March 30, 2012 Client: Washington Automotive Company | Applicant: Pcori; Jeffrey Owens Technologies Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1205800 | |||||
Renovations to existing 9th floor offices for pcori expansion space as shown on the attached mechanical, electrical, fire protection, and architectural dwgs. Interior work only. Date: May 15, 2012 Applicant: Washington Automotive Co Tower Cons; John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1208639 | |||||
Boiler Date: August 7, 2012 Client: Washington Automotive Company | Applicant: Phillip B Mobley | Permit status: Permit issued | Permit id: Fb1200107 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfsqgelawshfz4kego1jiki Date: February 10, 2012 Client: The Tower Companies | Applicant: David Raine; The Tower Companies; David Raine | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P40312716 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuycfabb5ejpf%2fh Date: March 28, 2012 Client: Washington Automotive Company Tower Construction Co. | Applicant: Paul Thieberger; Washington Auto Tower Construction Co.; Paul Thieberger | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P60258386 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuyccfa6xgwk6yb Date: March 28, 2012 Client: Tower Construction Co | Applicant: Kate Mitchell; Tower Construction Co; Robert Hunter | Permit type: Mechanical | Permit status: Completed | Permit id: Ar60255908 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcmqltunvb95ziy0gok5n8m Date: September 17, 2013 Client: The Tower Companies 20 Tower Oaks Blvd | Applicant: Paul Thieberger; The Tower Compa 20 Tower Oaks Blvd; Paul Thieberger | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27774268 | |||||
Labor and equipment to install flow able concrete in an underground storage tank located under the sidewalk for a tank closure in place Date: April 2, 2013 Client: Tower Construction Company | Applicant: A2z Environmental Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300469 | |||||
Complete closure of 10,0 gallon underground storage tank by putting in flowable concrete slurry. Trucks will be delivering the material. Date: March 22, 2013 Client: Tower Construction Company | Applicant: A2z Environmental Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300452 | |||||
Closure of a 10,0 gallon underground #2 fuel storage tank located under sidewalk by filling tank with pea gravel. Date: March 11, 2013 Client: Tower Construction Company | Applicant: A2z Environmental Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300422 | |||||
Provide equipment to pump 10,0 gallon underground storage tank and obtain soil samples for ddoe Date: February 25, 2013 Client: Tower Company | Applicant: A2z Environmental Group, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300374 | |||||
Pumping and cleaning a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The actual underground tank is located on the ne side of 19th street. This is being done to close the tank in place per ddoe. The work needs to be performed after hours pm to 5 am due to high traffic in the area. Date: February 15, 2013 Client: Tower Construction Company | Applicant: A2z Environmental Group, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300306 | |||||
Final closure of a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The tank will be filled with pea gravel by trucks using a conveyer to put the stone into the tank Date: March 5, 2013 Client: Tower Construction Company | Applicant: A2z Environmental Group, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300401 | |||||
Provide services to pump, clean and fill with flowable fill a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street side of the building. Date: March 11, 2013 Client: Tower Construction Company | Applicant: Tower Construction Company; A2z Environmental Group, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1300014 | |||||
Electrical Date: May 29, 2013 Applicant: Bernard G Kalb | Permit status: Completed | Permit id: E1305592 | |||||
Fire stopping Date: December 10, 2014 Applicant: Knox | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1502422 | |||||
Interior demolition of non-load bearing elements to the first floor lobby and concierge room. Install new door and finishing existing floor. Date: November 21, 2014 Client: The Tower Companies | Applicant: Colin Clark | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1501872 | |||||
Modification to an existing restaurant. Date: December 12, 2014 Applicant: Knox | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1500393 | |||||
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: June 9, 2014 Applicant: Mathias Flores | Permit type: Building | Permit status: Completed | Permit id: Pc12469332 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildtanzf8vkhjuoevgovgbmj Date: October 31, 2014 Client: The Tower Companies The Tower Companies | Applicant: Donald Veals; The Tower Compa The Tower Companies; Donald Veals | Permit type: Electrical | Permit status: Completed | Permit id: E53169261 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilchywb3dcagagh3hd%2fitkfu Date: March 4, 2014 Client: Joey Simpson | Applicant: Joseph Semper; Joey Simpson; Joseph Semper | Permit type: Electrical | Permit status: Completed | Permit id: E38890257 | |||||
Electrical Date: May 22, 2014 Applicant: Ralph E. Jackson | Permit status: Permit issued | Permit id: E1405886 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildei0dowcxdlafiryzbqfga Date: May 17, 2014 Client: L Street Associates | Applicant: Kyle Broadbent; L Street Associates; Scott Broadbent | Permit type: Electrical | Permit status: Permit issued | Permit id: E91355246 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildu%2behw5hr1ckgy2bnizxkp Date: September 26, 2014 Client: L Street | Applicant: James Mazzullo; L Street; James Mazzullo | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: G16472782 | |||||
Interior alteration for dci group suite 400 Date: June 13, 2014 Client: Dci Group | Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1408476 | |||||
Plumbing and gas Date: October 19, 2015 Permit status: Permit issued | Permit id: P1600507 | |||||
Interior demolition to 10th floor office space as shown on the attached arch. Dwgs. Interior work only. No change in use, no struct. Work involved. Date: September 16, 2015 Applicant: John Giuseppe | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500862 | |||||
Electrical Date: September 25, 2012 Client: Washington Automotive Company | Applicant: James F Coley | Permit status: Completed | Permit id: E1209894 | |||||
Interior tenant furniture realignment with infrastructure modification. Date: October 17, 2013 Client: Tower Companies | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1400541 | |||||
Plumbing and gas Date: May 10, 2013 Applicant: Rob Hohl | Permit status: Completed | Permit id: P1304905 | |||||
Interior alteration and repair to suite 802 to include mechanical, plumbing and electrical work as per plans. Date: March 13, 2013 Client: The Tower Companies | Applicant: Colin Clark | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1304373 | |||||
Electrical Date: July 23, 2013 Applicant: Ralph E. Jackson | Permit status: Completed | Permit id: E1307034 | |||||
Renovations to existing 10th floor office space, the washington institute as shown on the attached mechanical, electrical, fire protection, and architectural dwgs. Interior work only. Date: March 19, 2013 Client: The Washington Institute | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1304485 | |||||
Minor interior alteration to existing tenant office space to create new office within existing space. Mechanical, electrical and partition work to cover 2 sf. Date: September 4, 2014 Client: The Washington Institute | Applicant: Evan Obrien/ D Mckeever Services | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1411604 | |||||
Electrical Date: November 19, 2013 Applicant: Bernard G Kalb | Permit status: Completed | Permit id: E1401449 | |||||
Electrical Date: August 20, 2013 Applicant: Emile H. Rieu | Permit status: Completed | Permit id: E1307833 | |||||
Mechanical Date: June 4, 2013 Applicant: Charles T Clynes | Permit status: Permit issued | Permit id: M1301871 | |||||
Interior alteration to combined two suites into one Date: May 21, 2013 Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1304844 | |||||
Interior demolition of non-load bearing elements in suite 705. Date: December 4, 2014 Client: The Tower Companies | Applicant: Colin Clark | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500120 | |||||
Plumbing and gas Date: September 2, 2014 Permit status: Completed | Permit id: P1408255 | |||||
Interior demolition to existing 3rd floor office space as shown on the attached arch. Demolition dwgs. No structural work involved. Interior work only. Date: May 1, 2014 Applicant: John Giuseppe-Ramco | Permit type: Demolition | Permit status: Completed | Permit id: D1400466 | |||||
Renovations to existing 3rd floor office space for pact as shown on the attached mech. Plumb., elect., fire protection, demolition, system furniture, and arch. Dwgs. No change in use, interior work only. No structural work. Date: May 15, 2014 Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1405556 | |||||
Plumbing and gas Date: May 20, 2014 Applicant: Rob Hohl | Permit status: Permit issued | Permit id: P1405679 | |||||
Plumbing and gas Date: May 20, 2014 Applicant: Jay W Lipp | Permit status: Completed | Permit id: P1405668 | |||||
Plumbing and gas Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: P1203040 | |||||
SCORE 96 Plumbing and gas Date: October 9, 2012 Contractor: Phillip B. Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: P1300193 | |||||
SCORE 93 Boiler Date: August 7, 2012 Contractor: Phillip B Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: Fb1200107 | |||||
SCORE 92 Electrical Date: February 10, 2012 Contractor: Wayne O Reep Client: Washington Automotive Company | Permit status: Completed | Permit id: E1203328 | |||||
SCORE 100 Electrical Date: November 7, 2012 Contractor: Ralph Threatt Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300923 | |||||
SCORE 96 Electrical Date: June 26, 2012 Contractor: Ralph E. Jackson Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1207231 | |||||
SCORE 79 Electrical Date: May 22, 2012 Contractor: Eugene Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206072 | |||||
SCORE 96 Electrical Date: May 23, 2012 Contractor: Scott A Broadbent Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206242 | |||||
SCORE 82 Electrical Date: February 15, 2012 Contractor: Stephen J. Adams Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203559 | |||||
SCORE 92 Electrical Date: October 12, 2012 Contractor: John J Crowder Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300345 | |||||
SCORE 96 Electrical Date: February 2, 2012 Contractor: Anthony G Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203181 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1305592 | |||||
Plumbing and gas Date: June 13, 2013 Permit status: Permit issued | Permit id: P1305654 | |||||
SCORE 96 Electrical Date: May 22, 2014 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1405886 | |||||
SCORE 96 Electrical Date: July 7, 2014 Contractor: James W Lasher Permit status: Permit issued | Permit id: E1407004 | |||||
SCORE 93 Interior renovation to 3rd floor office space. Partitions, mechanical, electrical and life safety. Pcori Date: January 28, 2015 Contractor: Sam Hollen Ramco Of Dc Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1503710 | |||||
SCORE 93 Interior renovation to 8th and 9th floor office space. Partitions, furniture, mechanical, electrical and life safety. Pcori Date: May 12, 2015 Contractor: Sam Hollen Ramco Of Dc Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1506548 | |||||
SCORE 93 Interior renovation to 5th floor office space. Partitions, furniture, mechanical, electrical and life safety. Pcori Date: April 20, 2015 Contractor: Sam Hollen Ramco Of Dc Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1506549 | |||||
SCORE 96 Electrical Date: February 12, 2015 Contractor: John A Traylor Permit status: Completed | Permit id: E1503300 | |||||
SCORE 96 Electrical Date: May 19, 2015 Contractor: Ronnie E Wright Permit status: Completed | Permit id: E1505933 | |||||
SCORE 96 Mechanical Date: March 19, 2015 Contractor: Dominic E Totaro Permit status: Permit issued | Permit id: M1501409 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildklqipyhpcmu6y1fzwkkny Date: April 24, 2015 Client: The Tower Companies 20 Tower Oaks Blvd | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P76907850 | |||||
SCORE 96 Plumbing and gas Date: January 13, 2015 Contractor: David L. Hahn Permit status: Permit issued | Permit id: P1502619 | |||||
SCORE 96 Plumbing and gas Date: March 10, 2015 Contractor: Robert W. Parsons Permit status: Permit issued | Permit id: P1504048 | |||||
Plumbing and gas Date: October 19, 2015 Permit status: Completed | Permit id: P1600507 | |||||
SCORE 96 Plumbing and gas Date: November 12, 2015 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1601246 | |||||
SCORE 100 Plumbing and gas Date: November 9, 2015 Contractor: John Mcdonald Permit status: Permit issued | Permit id: P1601155 | |||||
SCORE 93 Electrical Date: November 12, 2015 Contractor: Daniel A Barbieri Permit status: Permit issued | Permit id: E1601271 | |||||
SCORE 96 Plumbing and gas Date: January 19, 2016 Contractor: Robert W. Parsons Permit status: Completed | Permit id: P1603010 | |||||
Plumbing and gas Date: March 2, 2016 Permit status: Permit issued | Permit id: P1604192 | |||||
SCORE 96 Electrical Date: February 17, 2016 Contractor: Herbert D Laut Permit status: Permit issued | Permit id: E1603796 | |||||
SCORE 96 Electrical Date: June 28, 2016 Contractor: Wesley R. Davis Permit status: Permit issued | Permit id: E1607627 | |||||
SCORE 89 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilexy1zx9d2ksffz8ymf8%2bhm Date: October 23, 2015 Contractor: John Giuseppe John Giuseppe Philip Hauhn Client: John Giuseppe | Permit type: Electrical | Permit status: Permit issued | Permit id: E66397562 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildu%2behw5hr1ckgy2bnizxkp Date: September 26, 2014 Contractor: James Mazzullo L Street James Mazzullo Client: L Street | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: G16472782 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildtanzf8vkhjuoevgovgbmj Date: October 31, 2014 Client: The Tower Companies The Tower Companies | Permit type: Electrical | Permit status: Completed | Permit id: E53169261 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilchywb3dcagagh3hd%2fitkfu Date: March 4, 2014 Contractor: Joseph Semper Joey Simpson Joseph Semper Client: Joey Simpson | Permit type: Electrical | Permit status: Completed | Permit id: E38890257 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildei0dowcxdlafiryzbqfga Date: May 17, 2014 Client: L Street Associates | Permit type: Electrical | Permit status: Permit issued | Permit id: E91355246 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuyccfa6xgwk6yb Date: March 28, 2012 Client: Tower Construction Co | Permit type: Mechanical | Permit status: Completed | Permit id: Ar60255908 | |||||
SCORE 93 Boiler Date: August 7, 2012 Contractor: Phillip B Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: Fb1200107 | |||||
SCORE 82 Provide equipment to pump 10,0 gallon underground storage tank and obtain soil samples for ddoe Date: February 25, 2013 Contractor: A2z Environmental Group Llc Client: Tower Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300374 | |||||
SCORE 56 Provide services to pump, clean and fill with flowable fill a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street side of the building. Date: March 11, 2013 Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1300014 | |||||
SCORE 75 Tenant build out of two suites on the 8th floor to include offices, pantries, conference rooms, copier rooms, work rooms, and reception areas. Date: February 1, 2012 Contractor: The Tower Companies Colin Clark Client: The Tower Companies | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1201903 | |||||
SCORE 56 Renovations to existing 9th floor office space, pcori as shown on the attached mech., plumb., elect. ,fire protection, and architectural dwgs. Interior work only. Date: February 7, 2012 Contractor: Pcori John Giuseppe Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1203073 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcmqltunvb95ziy0gok5n8m Date: September 17, 2013 Client: The Tower Companies 20 Tower Oaks Blvd | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27774268 | |||||
SCORE 82 Pumping and cleaning a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The actual underground tank is located on the ne side of 19th street. This is being done to close the tank in place per ddoe. The work needs to be performed after hours pm to 5 am due to high traffic in the area. Date: February 15, 2013 Contractor: A2z Environmental Group Llc Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300306 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1305592 | |||||
Plumbing and gas Date: June 13, 2013 Permit status: Permit issued | Permit id: P1305654 | |||||
SCORE 56 Provide services to pump, clean and fill with flowable fill a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street side of the building. Date: March 11, 2013 Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1300014 | |||||
SCORE 56 Renovations to existing 9th floor offices for pcori expansion space as shown on the attached mechanical, electrical, fire protection, and architectural dwgs. Interior work only. Date: May 15, 2012 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208639 | |||||
SCORE 82 Final closure of a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The tank will be filled with pea gravel by trucks using a conveyer to put the stone into the tank Date: March 5, 2013 Contractor: A2z Environmental Group Llc Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300401 | |||||
SCORE 56 Installation of office furniture in an existing office tenant suite. Date: March 30, 2012 Contractor: Pcori Jeffrey Owens Technologies Inc Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1205800 | |||||
SCORE 96 Electrical Date: May 22, 2014 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1405886 | |||||
SCORE 96 Electrical Date: July 7, 2014 Contractor: James W Lasher Permit status: Permit issued | Permit id: E1407004 | |||||
SCORE 92 Electrical Date: February 10, 2012 Contractor: Wayne O Reep Client: Washington Automotive Company | Permit status: Completed | Permit id: E1203328 | |||||
Electrical Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: E1203396 | |||||
Electrical Date: May 1, 2012 Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1205543 | |||||
SCORE 96 Electrical Date: February 2, 2012 Contractor: Anthony G Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203181 | |||||
SCORE 92 Electrical Date: October 12, 2012 Contractor: John J Crowder Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300345 | |||||
SCORE 96 Electrical Date: June 12, 2012 Contractor: Scott A Broadbent Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206787 | |||||
SCORE 96 Electrical Date: March 5, 2012 Contractor: Ralph E. Jackson Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1204043 | |||||
SCORE 82 Electrical Date: February 15, 2012 Contractor: Stephen J. Adams Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203559 | |||||
SCORE 79 Electrical Date: May 22, 2012 Contractor: Eugene Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206072 | |||||
SCORE 96 Electrical Date: June 26, 2012 Contractor: Ralph E. Jackson Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1207231 | |||||
SCORE 100 Electrical Date: November 7, 2012 Contractor: Ralph Threatt Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300923 | |||||
Plumbing and gas Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: P1203053 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuycfabb5ejpf%2fh Date: March 28, 2012 Client: Washington Automotive Company Tower Construction Co. | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P60258386 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfsqgelawshfz4kego1jiki Date: February 10, 2012 Contractor: David Raine The Tower Companies David Raine Client: The Tower Companies | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P40312716 | |||||
Plumbing and gas Date: June 8, 2012 Client: Washington Automotive Company | Permit status: Permit issued | Permit id: P1205714 | |||||
SCORE 96 Plumbing and gas Date: October 9, 2012 Contractor: Phillip B. Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: P1300193 | |||||
SCORE 96 Electrical Date: February 17, 2016 Contractor: Herbert D Laut Permit status: Permit issued | Permit id: E1603796 | |||||
SCORE 96 Electrical Date: June 28, 2016 Contractor: Wesley R. Davis Permit status: Permit issued | Permit id: E1607627 | |||||
Plumbing and gas Date: March 2, 2016 Permit status: Permit issued | Permit id: P1604192 | |||||
Plumbing and gas Date: July 13, 2016 Permit status: Permit issued | Permit id: P1607749 | |||||
SCORE 96 Plumbing and gas Date: January 19, 2016 Contractor: Robert W. Parsons Permit status: Completed | Permit id: P1603010 | |||||
SCORE 56 Three illuminated sign replacing existing Date: June 15, 2016 Contractor: N A; The Tower Comapnies; Bob Biroonak Client: The Tower Comapnies | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1600338 | |||||
SCORE 79 Closure of a 10,0 gallon underground #2 fuel storage tank located under sidewalk by filling tank with pea gravel. Date: March 11, 2013 Contractor: A2z Environmental Group Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300422 | |||||
SCORE 79 Complete closure of 10,0 gallon underground storage tank by putting in flowable concrete slurry. Trucks will be delivering the material. Date: March 22, 2013 Contractor: A2z Environmental Group Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300452 | |||||
SCORE 79 Labor and equipment to install flow able concrete in an underground storage tank located under the sidewalk for a tank closure in place Date: April 2, 2013 Contractor: A2z Environmental Group Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300469 | |||||
SCORE 93 Interior alteration for dci group suite 400 Date: June 13, 2014 Contractor: Janice Marut Permit Pushers Client: Dci Group | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1408476 | |||||
SCORE 93 Modification to an existing restaurant. Date: December 12, 2014 Contractor: Knox Permit type: Alteration and repair | Permit status: Completed | Permit id: B1500393 | |||||
SCORE 93 Fire stopping Date: December 10, 2014 Contractor: Knox Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1502422 | |||||
SCORE 100 Interior demolition of non-load bearing elements to the first floor lobby and concierge room. Install new door and finishing existing floor. Date: November 21, 2014 Contractor: Colin Clark Client: The Tower Companies | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1501872 | |||||
SCORE 56 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: June 9, 2014 Contractor: Mathias Flores Permit type: Building | Permit status: Completed | Permit id: Pc12469332 | |||||
SCORE 61 Three illuminated sign replacing existing Date: June 15, 2016 Contractor: The Tower Comapnies; Bob Biroonak Client: The Tower Comapnies | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1600338 | |||||
SCORE 93 Boiler Date: August 7, 2012 Contractor: Phillip B Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: Fb1200107 | |||||
SCORE 56 Renovations to existing 9th floor offices for pcori expansion space as shown on the attached mechanical, electrical, fire protection, and architectural dwgs. Interior work only. Date: May 15, 2012 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208639 | |||||
SCORE 56 Installation of office furniture in an existing office tenant suite. Date: March 30, 2012 Contractor: Pcori; Jeffrey Owens Technologies Inc Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1205800 | |||||
SCORE 75 Tenant build out of two suites on the 8th floor to include offices, pantries, conference rooms, copier rooms, work rooms, and reception areas. Date: February 1, 2012 Contractor: The Tower Companies; Colin Clark Client: The Tower Companies | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1201903 | |||||
SCORE 56 Renovations to existing 9th floor office space, pcori as shown on the attached mech., plumb., elect. ,fire protection, and architectural dwgs. Interior work only. Date: February 7, 2012 Contractor: Pcori; John Giuseppe Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1203073 | |||||
Electrical Date: May 1, 2012 Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1205543 | |||||
SCORE 96 Electrical Date: February 2, 2012 Contractor: Anthony G Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203181 | |||||
SCORE 92 Electrical Date: October 12, 2012 Contractor: John J Crowder Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300345 | |||||
SCORE 96 Electrical Date: June 12, 2012 Contractor: Scott A Broadbent Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206787 | |||||
SCORE 96 Electrical Date: March 5, 2012 Contractor: Ralph E. Jackson Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1204043 | |||||
SCORE 82 Electrical Date: February 15, 2012 Contractor: Stephen J. Adams Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1203559 | |||||
SCORE 96 Electrical Date: May 23, 2012 Contractor: Scott A Broadbent Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206242 | |||||
SCORE 79 Electrical Date: May 22, 2012 Contractor: Eugene Samburg Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1206072 | |||||
SCORE 96 Electrical Date: June 26, 2012 Contractor: Ralph E. Jackson Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1207231 | |||||
SCORE 100 Electrical Date: November 7, 2012 Contractor: Ralph Threatt Client: Washington Automotive Company | Permit status: Permit issued | Permit id: E1300923 | |||||
SCORE 92 Electrical Date: February 10, 2012 Contractor: Wayne O Reep Client: Washington Automotive Company | Permit status: Completed | Permit id: E1203328 | |||||
Electrical Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: E1203396 | |||||
SCORE 96 Plumbing and gas Date: October 9, 2012 Contractor: Phillip B. Mobley Client: Washington Automotive Company | Permit status: Permit issued | Permit id: P1300193 | |||||
Plumbing and gas Date: June 8, 2012 Client: Washington Automotive Company | Permit status: Permit issued | Permit id: P1205714 | |||||
Plumbing and gas Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: P1203040 | |||||
Plumbing and gas Date: February 9, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: P1203053 | |||||
Plumbing and gas Date: February 21, 2012 Client: Washington Automotive Company | Permit status: Completed | Permit id: P1203324 | |||||
SCORE 84 Pumping and cleaning a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The actual underground tank is located on the ne side of 19th street. This is being done to close the tank in place per ddoe. The work needs to be performed after hours pm to 5 am due to high traffic in the area. Date: February 15, 2013 Contractor: A2z Environmental Group, Llc Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300306 | |||||
SCORE 84 Final closure of a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street nw side of the facility. The tank will be filled with pea gravel by trucks using a conveyer to put the stone into the tank Date: March 5, 2013 Contractor: A2z Environmental Group, Llc Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300401 | |||||
SCORE 84 Provide equipment to pump 10,0 gallon underground storage tank and obtain soil samples for ddoe Date: February 25, 2013 Contractor: A2z Environmental Group, Llc Client: Tower Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300374 | |||||
SCORE 56 Provide services to pump, clean and fill with flowable fill a 10,0 gallon #2 heating oil underground storage tank located under the sidewalk on the 19th street side of the building. Date: March 11, 2013 Client: Tower Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1300014 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1305592 | |||||
Plumbing and gas Date: June 13, 2013 Permit status: Permit issued | Permit id: P1305654 | |||||
SCORE 96 Electrical Date: July 7, 2014 Contractor: James W Lasher Permit status: Permit issued | Permit id: E1407004 | |||||
SCORE 96 Electrical Date: May 22, 2014 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1405886 | |||||
SCORE 100 Interior demolition to 10th floor office space as shown on the attached arch. Dwgs. Interior work only. No change in use, no struct. Work involved. Date: September 16, 2015 Contractor: John Giuseppe Permit type: Demolition | Permit status: Permit issued | Permit id: D1500862 | |||||
SCORE 59 Install 1 illum. Store front sign Date: March 27, 2015 Contractor: Gelberg Signs; Triangle Signs Client: Tower Construction Co | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500199 | |||||
SCORE 100 Renovations to existing 10th floor office space, tycko and zavareei llp as per third party approved mech., plumb., elect. Fire protection, and arch. Dwgs. By kta, submitted electronically via projectdox. Interior work only. No change in use, no struct. Work involved. Date: November 10, 2015 Contractor: John Giuseppe Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1600001 | |||||
SCORE 93 Renovations to existing 7th floor office space, cnfa as per the attached mech. Elect. Fire protection, demolition, and arch. Dwgs. Interior work only. No change in use no struct. Work involved. Projectdox. Date: September 9, 2015 Contractor: John Giusepperamco Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1509791 | |||||
SCORE 93 Renovations to existing 6th floor elevator lobby and corridors as shown on the attached mech., elect., fire protection, demolition, and arch. Dwgs. Interior work only. No change in use. No struct. Work involved. Date: December 9, 2015 Contractor: John Giusepperamco Client: The Tower Companies | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602629 | |||||
SCORE 93 Interior renovation to 3rd floor office space. Partitions, mechanical, electrical and life safety. Pcori Date: January 28, 2015 Contractor: Sam Hollen Ramco Of Dc, Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1503710 | |||||
SCORE 93 Interior renovation to 8th and 9th floor office space. Partitions, furniture, mechanical, electrical and life safety. Pcori Date: May 12, 2015 Contractor: Sam Hollen Ramco Of Dc, Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1506548 | |||||
SCORE 93 Interior renovation to 5th floor office space. Partitions, furniture, mechanical, electrical and life safety. Pcori Date: April 20, 2015 Contractor: Sam Hollen Ramco Of Dc, Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1506549 | |||||
SCORE 93 Renovations to existing 10th floor common corridor as shown on the attached mech., electrical, fire protection, and arch. Dwgs. Interior work only. No change in use. No struct. Work involved. Apprx. 8 sf within scope of work. Date: September 18, 2015 Contractor: John Giusepperamco Permit type: Alteration and repair | Permit status: Completed | Permit id: B1512843 | |||||
SCORE 93 Electrical Date: November 12, 2015 Contractor: Daniel A Barbieri Permit status: Permit issued | Permit id: E1601271 | |||||
SCORE 96 Electrical Date: March 23, 2015 Contractor: John A Traylor Permit status: Permit issued | Permit id: E1504308 | |||||
SCORE 100 Plumbing and gas Date: November 9, 2015 Contractor: John Mcdonald Permit status: Permit issued | Permit id: P1601155 | |||||
SCORE 96 Plumbing and gas Date: March 10, 2015 Contractor: Robert W. Parsons Permit status: Permit issued | Permit id: P1504048 | |||||
SCORE 96 Plumbing and gas Date: January 13, 2015 Contractor: David L. Hahn Permit status: Permit issued | Permit id: P1502619 | |||||
SCORE 96 Electrical Date: February 12, 2015 Contractor: John A Traylor Permit status: Completed | Permit id: E1503300 | |||||
SCORE 96 Electrical Date: May 19, 2015 Contractor: Ronnie E Wright Permit status: Completed | Permit id: E1505933 | |||||
SCORE 96 Electrical Date: February 18, 2015 Contractor: Ronnie E Wright Permit status: Completed | Permit id: E1503412 | |||||
SCORE 96 Electrical Date: July 23, 2015 Contractor: John A Traylor Permit status: Completed | Permit id: E1507790 | |||||
SCORE 96 Electrical Date: June 3, 2015 Contractor: Ronnie E Wright Permit status: Completed | Permit id: E1506278 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeildklqipyhpcmu6y1fzwkkny Date: April 24, 2015 Client: The Tower Companies 20 Tower Oaks Blvd | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P76907850 | |||||
SCORE 96 Plumbing and gas Date: November 12, 2015 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1601246 | |||||
Plumbing and gas Date: October 19, 2015 Permit status: Completed | Permit id: P1600507 | |||||
SCORE 96 Mechanical Date: March 19, 2015 Contractor: Dominic E Totaro Permit status: Permit issued | Permit id: M1501409 | |||||
SCORE 61 Three illuminated sign replacing existing Date: June 15, 2016 Contractor: The Tower Comapnies; Bob Biroonak Client: The Tower Comapnies | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1600338 | |||||
SCORE 56 Remove the control panel and replace the devices for the clean agent system. Just replace the fire alarm panel for the fire alarm system. Date: June 28, 2016 Contractor: 1828 L Street Assoc; Bfpe Intl Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609883 | |||||
SCORE 56 Interior remodel of existing resturant space - no change or use or structural work - no fire sprinkler work. Approx. 18 sf. Date: May 17, 2016 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605942 | |||||
SCORE 59 Revise bldg. Permit b1611507, 10th floor office space for consilio to show changes to hvac system in lan room 1039 all as shown on the electronically submitted revised mechanical, electrical, and plumb. Dwgs. No change in use. Original approved plans have been uploaded and found in support documents. Date: October 19, 2016 Contractor: 1828 L Street Associates Llc; John Giusepperamco Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1613085 | |||||
SCORE 56 Installing communication conduit and fiber optic cable reference public space permit pa122087 Date: May 25, 2016 Contractor: 24 7 Midatlantic Network; Richard Shelmerdine Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600740 | |||||
SCORE 96 Electrical Date: June 28, 2016 Contractor: Wesley R. Davis Permit status: Permit issued | Permit id: E1607627 | |||||
SCORE 96 Electrical Date: February 17, 2016 Contractor: Herbert D Laut Permit status: Permit issued | Permit id: E1603796 | |||||
Plumbing and gas Date: July 13, 2016 Permit status: Permit issued | Permit id: P1607749 | |||||
Plumbing and gas Date: March 2, 2016 Permit status: Permit issued | Permit id: P1604192 | |||||
SCORE 96 Plumbing and gas Date: January 19, 2016 Contractor: Robert W. Parsons Permit status: Completed | Permit id: P1603010 | |||||
SCORE 79 Renovations within an existing 10th floor office space consilio suite 1070, adding 2 new offices, one coat closet, and 2 workstations as shown on the attached mech., elect, fire protection demolition, and arch. Dwgs. Interior work only. No change in use. No structural work involved. 4 sf. Date: June 5, 2017 Contractor: John M. Giuseppe Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709163 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuyccfa6xgwk6yb Date: March 28, 2012 Client: Tower Construction Co | Permit type: Mechanical | Permit status: Completed | Permit id: Ar60255908 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile3a%2fpuxpuycfabb5ejpf%2fh Date: March 28, 2012 Client: Washington Automotive Company Tower Construction Co. | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P60258386 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfsqgelawshfz4kego1jiki Date: February 10, 2012 Contractor: David Raine; The Tower Companies; David Raine Client: The Tower Companies | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P40312716 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcmqltunvb95ziy0gok5n8m Date: September 17, 2013 Client: The Tower Companies 20 Tower Oaks Blvd | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27774268 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildtanzf8vkhjuoevgovgbmj Date: October 31, 2014 Client: The Tower Companies The Tower Companies | Permit type: Electrical | Permit status: Completed | Permit id: E53169261 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilchywb3dcagagh3hd%2fitkfu Date: March 4, 2014 Contractor: Joseph Semper; Joey Simpson; Joseph Semper Client: Joey Simpson | Permit type: Electrical | Permit status: Completed | Permit id: E38890257 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildei0dowcxdlafiryzbqfga Date: May 17, 2014 Client: L Street Associates | Permit type: Electrical | Permit status: Permit issued | Permit id: E91355246 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildu%2behw5hr1ckgy2bnizxkp Date: September 26, 2014 Contractor: James Mazzullo; L Street; James Mazzullo Client: L Street | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: G16472782 | |||||
SCORE 93 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilexy1zx9d2ksffz8ymf8%2bhm Date: October 23, 2015 Contractor: John Giuseppe; John Giuseppe; Philip Hauhn Client: John Giuseppe | Permit type: Electrical | Permit status: Permit issued | Permit id: E66397562 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildoumfgvitfkmnhctdi%2bn3%2b Date: April 23, 2015 Contractor: Nickolas Desimone; Ruth Gressor; Stephen Gates Client: Ruth Gressor | Permit type: Electrical | Permit status: Completed | Permit id: E49269851 | |||||
SCORE 93 Replace hoist cables: elev #3 estimated cost of work : covered under maintenance contract [2000. 00]. Elevator control service license period : 04/14/2015-11/30/2015 Date: July 13, 2015 Contractor: Elcon Enterprises Inc Client: Tower Companies | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1502549 | |||||
SCORE 61 Three illuminated sign replacing existing Date: June 15, 2016 Contractor: The Tower Comapnies; Bob Biroonak Client: The Tower Comapnies | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1600338 | |||||
SCORE 86 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee24e%2bzbtoli3wr3gaqrna Date: July 13, 2016 Client: Sanford Malakoff | Permit type: Electrical | Permit status: Permit issued | Permit id: E85845485 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildnjs0lxijy9or69yp%2bc0ly Date: September 28, 2016 Permit type: Mechanical | Permit status: Permit issued | Permit id: Ar46103080 | |||||
SCORE 96 Electrical Date: July 19, 2017 Contractor: Herbert D Laut Permit status: Permit issued | Permit id: E1708479 | |||||
Plumbing and gas Date: July 24, 2017 Permit status: Permit issued | Permit id: P1707748 | |||||
SCORE 75 Interior alteration and repair suite 10 for a tenant expansion to inlcude electrical and mechanical work. Date: August 17, 2012 Contractor: The Tower Companies Colin Clark Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1212923 | |||||
SCORE 96 Electrical Date: November 30, 2016 Contractor: Anthony G Samburg Permit status: Permit issued | Permit id: E1701661 | |||||
SCORE 75 Interior alteration and repair suite 10 for a tenant expansion to inlcude electrical and mechanical work. Date: August 17, 2012 Contractor: The Tower Companies; Colin Clark Client: Washington Automotive Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1212923 | |||||
SCORE 96 Electrical Date: November 30, 2016 Contractor: Anthony G Samburg Permit status: Permit issued | Permit id: E1701661 | |||||
SCORE 100 Interior alteration to combined two suites into one Date: May 21, 2013 Contractor: George Delgado Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304844 | |||||
SCORE 93 Renovations to existing 10th floor office space, the washington institute as shown on the attached mechanical, electrical, fire protection, and architectural dwgs. Interior work only. Date: March 19, 2013 Contractor: John Giusepperamco Client: The Washington Institute | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304485 | |||||
SCORE 89 Minor interior alteration to existing tenant office space to create new office within existing space. Mechanical, electrical and partition work to cover 2 sf. Date: September 4, 2014 Contractor: Evan Obrien D Mckeever Services Client: The Washington Institute | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1411604 | |||||
SCORE 100 Interior alteration and repair to suite 802 to include mechanical, plumbing and electrical work as per plans. Date: March 13, 2013 Contractor: Colin Clark Client: The Tower Companies | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304373 | |||||
SCORE 100 Interior tenant furniture realignment with infrastructure modification. Date: October 17, 2013 Contractor: George Delgado Client: Tower Companies | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1400541 | |||||
SCORE 77 Electrical Date: August 20, 2013 Contractor: Emile H. Rieu Permit status: Completed | Permit id: E1307833 | |||||
SCORE 77 Electrical Date: August 20, 2013 Contractor: Emile H. Rieu Permit status: Completed | Permit id: E1307833 | |||||
SCORE 77 Electrical Date: August 20, 2013 Contractor: Emile H. Rieu Permit status: Completed | Permit id: E1307833 | |||||
SCORE 96 Electrical Date: November 19, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1401449 | |||||
SCORE 96 Electrical Date: November 19, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1401449 | |||||
SCORE 96 Electrical Date: November 19, 2013 Contractor: Bernard G Kalb Permit status: Completed | Permit id: E1401449 | |||||
SCORE 93 Electrical Date: September 25, 2012 Contractor: James F Coley Client: Washington Automotive Company | Permit status: Completed | Permit id: E1209894 | |||||
SCORE 96 Electrical Date: July 23, 2013 Contractor: Ralph E. Jackson Permit status: Completed | Permit id: E1307034 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Brian J Gaquin Permit status: Completed | Permit id: E1305603 | |||||
SCORE 96 Electrical Date: June 4, 2013 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1305766 | |||||
SCORE 93 Electrical Date: June 7, 2013 Contractor: James F Coley Permit status: Permit issued | Permit id: E1305869 | |||||
SCORE 92 Mechanical Date: June 4, 2013 Contractor: Charles T Clynes Permit status: Permit issued | Permit id: M1301870 | |||||
SCORE 93 Plumbing and gas Date: May 10, 2013 Contractor: Rob Hohl Permit status: Completed | Permit id: P1304905 | |||||
Plumbing and gas Date: July 17, 2013 Permit status: Permit issued | Permit id: P1306453 | |||||
SCORE 96 Electrical Date: June 4, 2013 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1305766 | |||||
SCORE 93 Electrical Date: June 7, 2013 Contractor: James F Coley Permit status: Permit issued | Permit id: E1305869 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Brian J Gaquin Permit status: Completed | Permit id: E1305603 | |||||
SCORE 92 Mechanical Date: June 4, 2013 Contractor: Charles T Clynes Permit status: Permit issued | Permit id: M1301870 | |||||
Plumbing and gas Date: July 17, 2013 Permit status: Permit issued | Permit id: P1306453 | |||||
SCORE 93 Plumbing and gas Date: May 10, 2013 Contractor: Rob Hohl Permit status: Completed | Permit id: P1304905 | |||||
SCORE 93 Electrical Date: September 25, 2012 Contractor: James F Coley Client: Washington Automotive Company | Permit status: Completed | Permit id: E1209894 | |||||
SCORE 93 Electrical Date: September 25, 2012 Contractor: James F Coley Client: Washington Automotive Company | Permit status: Completed | Permit id: E1209894 | |||||
SCORE 92 Mechanical Date: June 4, 2013 Contractor: Charles T Clynes Permit status: Permit issued | Permit id: M1301870 | |||||
SCORE 93 Electrical Date: June 7, 2013 Contractor: James F Coley Permit status: Permit issued | Permit id: E1305869 | |||||
SCORE 96 Electrical Date: June 4, 2013 Contractor: Ralph E. Jackson Permit status: Permit issued | Permit id: E1305766 | |||||
SCORE 96 Electrical Date: July 23, 2013 Contractor: Ralph E. Jackson Permit status: Completed | Permit id: E1307034 | |||||
SCORE 96 Electrical Date: May 29, 2013 Contractor: Brian J Gaquin Permit status: Completed | Permit id: E1305603 | |||||
Plumbing and gas Date: July 17, 2013 Permit status: Permit issued | Permit id: P1306453 | |||||
SCORE 93 Plumbing and gas Date: May 10, 2013 Contractor: Rob Hohl Permit status: Completed | Permit id: P1304905 | |||||
SCORE 56 Interior demolition to suite 10 the washington institute on near east policy as shown on the attached arch. Demolition dwgs. No change in use, ho structural work, interior work only. 5855 sf. Date: December 23, 2016 Permit type: Demolition | Permit status: Permit issued | Permit id: D1700158 | |||||
Plumbing and gas Date: September 2, 2014 Permit status: Completed | Permit id: P1408255 | |||||
Plumbing and gas Date: September 2, 2014 Permit status: Completed | Permit id: P1408255 | |||||
Plumbing and gas Date: September 2, 2014 Permit status: Completed | Permit id: P1408255 | |||||
Plumbing and gas Date: September 2, 2014 Permit status: Completed | Permit id: P1408255 | |||||
SCORE 93 Renovations to existing 3rd floor office space for pact as shown on the attached mech. Plumb., elect., fire protection, demolition, system furniture, and arch. Dwgs. No change in use, interior work only. No structural work. Date: May 15, 2014 Contractor: John Giusepperamco Permit type: Alteration and repair | Permit status: Completed | Permit id: B1405556 | |||||
SCORE 93 Interior demolition to existing 3rd floor office space as shown on the attached arch. Demolition dwgs. No structural work involved. Interior work only. Date: May 1, 2014 Contractor: John Giusepperamco Permit type: Demolition | Permit status: Completed | Permit id: D1400466 | |||||
SCORE 100 Interior demolition of non-load bearing elements in suite 705. Date: December 4, 2014 Contractor: Colin Clark Client: The Tower Companies | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500120 | |||||
SCORE 93 Renovations to existing 7th floor spec. Suite as shown on the attached mech. Elect. Fire protection, demolition, and arch. Dwgs. Interior work only. No change in use. No struct. Work involved. Date: July 15, 2015 Contractor: John Giusepperamco Client: The Tower Co. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1510109 | |||||
SCORE 96 Plumbing and gas Date: May 20, 2014 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1405668 | |||||
SCORE 96 Plumbing and gas Date: May 20, 2014 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1405668 | |||||
SCORE 96 Plumbing and gas Date: May 20, 2014 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1405668 | |||||
SCORE 96 Plumbing and gas Date: May 20, 2014 Contractor: Jay W Lipp Permit status: Completed | Permit id: P1405668 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2014 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1405679 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2014 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1405679 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2014 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1405679 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2014 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1405679 | |||||
Plumbing and gas Date: February 26, 2015 Permit status: Completed | Permit id: P1503800 | |||||
Plumbing and gas Date: February 26, 2015 Permit status: Completed | Permit id: P1503800 | |||||
Plumbing and gas Date: January 30, 2015 Permit status: Completed | Permit id: P1503101 | |||||
Plumbing and gas Date: January 30, 2015 Permit status: Completed | Permit id: P1503101 | |||||
SCORE 93 Interior alterations to part of 7th fl., cnfa, removal of door and wall, relocation outlets within individual offices as shown on the attached arch. Dwgs. Interior work only, no change in use. No structural, mech., plumb., work involved. Date: April 21, 2015 Contractor: John Giusepperamco Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1506647 | |||||
SCORE 96 Electrical Date: March 4, 2015 Contractor: Anthony G Samburg Permit status: Permit issued | Permit id: E1503778 | |||||
SCORE 96 Electrical Date: March 4, 2015 Contractor: Anthony G Samburg Permit status: Permit issued | Permit id: E1503778 | |||||
SCORE 96 Electrical Date: February 27, 2015 Contractor: John A Traylor Permit status: Permit issued | Permit id: E1503670 | |||||
SCORE 96 Electrical Date: February 27, 2015 Contractor: John A Traylor Permit status: Permit issued | Permit id: E1503670 | |||||
Plumbing and gas Date: August 17, 2015 Permit status: Permit issued | Permit id: P1508313 | |||||
Plumbing and gas Date: August 17, 2015 Permit status: Permit issued | Permit id: P1508313 | |||||
Plumbing and gas Date: June 17, 2015 Permit status: Permit issued | Permit id: P1506686 | |||||
Plumbing and gas Date: June 17, 2015 Permit status: Permit issued | Permit id: P1506686 | |||||
SCORE 92 Plumbing and gas Date: June 16, 2015 Contractor: Lloyd Gates Permit status: Permit issued | Permit id: P1506648 | |||||
SCORE 92 Plumbing and gas Date: June 16, 2015 Contractor: Lloyd Gates Permit status: Permit issued | Permit id: P1506648 | |||||
SCORE 93 In conjunction with bldg. Permit b1602629, permission to work monday thru saturday 7pm to 7am starting feb. 8th ending march 8th contact at site is bret gomilla, 703-338-7277, building security 202-573-3208. Date: February 5, 2016 Contractor: John Giusepperamco Client: The Tower Companies | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600349 | |||||
SCORE 56 In conjunction with bldg. Permit b1602629, permission to work monday thru saturday 7pm to 7am starting march 9th, ending april 9th. Contact at site bret gomilla, 703-338-7277, security officer, 202-573-3208. Date: March 9, 2016 Contractor: The Tower Companies; John Giusepperamco Client: The Tower Companies | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600484 | |||||
SCORE 93 Plumbing and gas Date: October 20, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1700471 | |||||
SCORE 93 Plumbing and gas Date: October 20, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1700471 | |||||
SCORE 59 Renovations to 10th floor office space, consilio as shown on the electronically submitted mech, plumb., elect., fire protection, demolition, and arch. Dwgs. Interior work only. No change in use, no struct. Work. Date: August 25, 2016 Contractor: 1828 L Street Associates Llc; John Giusepperamco Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1611507 | |||||
SCORE 93 Plumbing and gas Date: October 20, 2016 Contractor: Rob Hohl Permit status: Completed | Permit id: P1700471 | |||||
SCORE 93 Provide and install new elevator cab interiors to include new cab ceiling, main & auxiliary car operating panels for elevators 2-6. Remove and refurbish existing car panels for elevator #1. Provide and install new cab ceilings, main & auxiliary car operating panels for elevator #1. Estimated cost of work : 694,647. 49 Date: March 2, 2017 Contractor: Elcon Enterprises Inc Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1603479 |