Content |
---|
SCORE 98 Maha -; installation of a 16 high x 3 wide tapered to 18" wide at bottom projecting sign per bra design approval. Top section to be perforated aluminum with solid aluminum on lower section 42" high. 1 2 thick painted acrylic letters mounted to face with vinyl "house" graphic. 4 overall projection. Installation of (2) double-sided aluminum blade signs welded . 0 aluminum faces and returns primed and painted with vinyl die cut lettering. Client: Mass Affordable Housing | Permit type: Signs | Permit status: Open | Current use: Comm | Permit id: Alt594488 | Parcel: 1601488010 |
SCORE 98 Maha -; installation of a 16 high x 3 wide tapered to 18" wide at bottom projecting sign per bra design approval. Top section to be perforated aluminum with solid aluminum on lower section 42" high. 1 2 thick painted acrylic letters mounted to face with vinyl "house" graphic. 4 overall projection. Installation of (2) double-sided aluminum blade signs welded . 0 aluminum faces and returns primed and painted with vinyl die cut lettering. Client: Mass Affordable Housing | Permit type: Long form/alteration permit | Expiration date: April 4, 2017 | Current use: Comm | Permit id: Alt594488 | Parcel: 1601488010 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 94 | Charles Welsh | 11 Projects | $24,190 Avg. Project Cost | 6 Years in Business | ![]() |
SCORE 91 | Willliam Mcconney | 50 Projects | $2,694 Avg. Project Cost | 5 Years in Business | ![]() |
SCORE 82 | Anthony J Cefalu | 12 Projects | $4,028 Avg. Project Cost | 2 Years in Business | ![]() |
SCORE 73 | Davis Dam | 8 Projects | $4,913 Avg. Project Cost | 2 Years in Business | ![]() |
SCORE 69 | Thomas M Bannon | 6 Projects | $68,500 Avg. Project Cost | 1 Years in Business | ![]() |