Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 2 detached patio covers totalling 8 sq. Ft. And 13 kw roof mt solar to be installed on patio covers and panel change out. If a re-roof project is proposed, the following specifications apply. Existing roofing material: proposed roofing material: manufacturer: brand and model: color (if cool roof required): built-up roofing assembly system number per attached listing report (if applicable): specific exemption from cool roof requirements (if applicable): required building inspector field verification (if applicable): note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. 4 3 15-added panel change out-kp Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: April 6, 2015 | Permit id: Pds2015-Resacc- | |||||
2 detached patio covers totalling 8 sq. Ft. And 13 kw roof mt solar to be installed on patio covers and panel change out. If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. 4/3/15-added panel change out-kp Date: January 15, 2015 Value: $16,800 Permit type: New residential acc structure | Permit status: Completed | Completion date: April 6, 2015 | Permit id: Pds2015-Resacc- | |||||
SCORE 96 2 detached patio covers totalling 8 sq. Ft. And 13 kw roof mt solar to be installed on patio covers and panel change out. If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. 4 3 15-added panel change out-kp Permit type: New residential acc structure | Permit status: Completed | Completion date: April 6, 2015 | Permit id: Pds2015-Resacc- | |||||
Rough electric Date: April 3, 2015 Permit status: Pass | Permit id: Pds2015-Resacc- |