Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: August 26, 2016 Client: Nguyen Thang Q | Permit status: Completed | Permit id: 689195 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf) for a single family household living with one(1) car parking space accessed by a shear driveway on each lot. Size and location as shown in the application. Date: May 17, 2016 Client: Nguyen Tommy | Applicant: Louis Wolfrom | Permit type: Appeal | Permit status: Granted | Permit id: 27846 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf) for a single family household living with one(1) car parking space accessed by a rear shear driveway on each lot. Size and location as shown in the application. Date: May 17, 2016 Client: Nguyen Thang Q | Applicant: Louis Wolfrom | Permit type: Appeal | Permit status: Granted | Permit id: 27855 | |||||
Zoning use permit Date: August 26, 2016 Client: Nguyen Thang Q | Permit status: Completed | Permit id: 689195 | |||||
New construction permit Date: January 24, 2017 Client: Nguyen Thang Q | Permit status: Active | Permit id: 729505 | |||||
Zoning admin review Date: November 23, 2016 Client: Nguyen Tommy | Permit status: Completed | Permit id: 731001 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf) for a single family household living with one(1) car parking space accessed by a rear shear driveway on each lot. Size and location as shown in the application. Date: May 17, 2016 Client: Nguyen Thang Q | Applicant: Louis Wolfrom | Permit type: Appeal | Permit status: Granted | Permit id: 27855 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf) for a single family household living with one(1) car parking space accessed by a shear driveway on each lot. Size and location as shown in the application. Date: May 17, 2016 Client: Nguyen Tommy | Applicant: Louis Wolfrom | Permit type: Appeal | Permit status: Granted | Permit id: 27846 | |||||
SCORE 89 Installation of (1) hvac unit with a c (including ductwork and all associated accessories). Sfd Date: June 15, 2017 Contractor: Sanks Mechanical Client: Nguyen Tommy | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 791978 | |||||
SCORE 100 Install sanitary drain and water lines to all fixtures. 3 wc,3 lavs,1 tub,1 shower,1 hwh and 1 wm. Install a new 5" lateral,curb trap,fai,1" water (sfd)- "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"the installation will comply with the philadelphia plumbing code 2004 Date: June 5, 2017 Contractor: Drain Masters Plumbing Llc Client: Nguyen Tommy | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2017 | Permit id: 788988 | |||||
SCORE 96 Amend existing building permit #729502 to include underpinning as per plans Date: April 13, 2017 Contractor: Msj Contractors Llc Client: Nguyen Tommy | Permit type: Administrative permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 768391 | |||||
SCORE 100 For the installation of an automatic sprinkler system in accordance with nfpa 13d throughout a new, three (3) story with a roof deck access structure, single-family dwelling, using a new 1" combined fire water service line, as per plans. Date: March 31, 2017 Contractor: Oneida Fire Protection Client: Nguyen Thang Q | Permit type: Suppression permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 764928 | |||||
SCORE 89 Install (1) 80,0 btu 95% gas furnace with 4 ton a c and all required ductwork. Date: April 11, 2017 Contractor: Sanks Mechanical Client: Nguyen Thang Q | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 774449 | |||||
For the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf) for a single family household living with one(1) car parking space accessed by a shear driveway on each lot. Size and location as shown in the application. Size and location as shown in the application. Date: August 26, 2016 Client: Nguyen Tommy | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 26, 2016 | Permit id: 677053 | |||||
SCORE 100 Install 200amp main service,install circuit panel,all wiring throughout and install phone and cable tv wiring per 2008 nec (sfd) Date: April 18, 2017 Contractor: Baldwin Electrical Const Llc Client: Nguyen Thang Q | Permit type: Electrical permit | Permit status: Completed | Completion date: November 15, 2017 | Permit id: 775856 | |||||
SCORE 100 Install 2 amp main service install circuit panel. Install all wiring throughout, install phone and cable tv wiring. As per 2008 nec east district Date: May 2, 2017 Contractor: Baldwin Electrical Const Llc Client: Nguyen Tommy | Permit type: Electrical permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 779745 | |||||
SCORE 100 For the installation of an automatic sprinkler system in accordance with nfpa 13d for a new, three (3) story attached structure with roof deck and pilot house, to be used as single-family household living, using a new 1" combined fire domestic line, as per plans. Date: April 21, 2017 Contractor: Oneida Fire Protection Client: Nguyen Tommy | Permit type: Suppression permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 770978 | |||||
SCORE 86 Construction of a new 3 story sfh with roof deck accessed by pilot house as per approved zoning plans. Date: January 24, 2017 Contractor: Agupol Contractors Llc Client: Nguyen Thang Q | Permit type: New construction permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 729505 | |||||
SCORE 100 Install all sanitary drain and water lines to all fixtures 3 wc,3 lavs,3 showers,1 tub,1 ks,1 wm,1 hwh,curb trap,1" water service and 5" lateral pa20170951802 (sfd)the installation shall comply with the philadelphia plumbing code, 2004. Self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection". Date: April 11, 2017 Contractor: Drain Masters Plumbing Llc Client: Nguyen Thang Q | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 774459 | |||||
For the erection of an attached structure ( nte 38 high); roof deck accessed by a pilot house ( nte sf)for a single family household living with one(1) car parking space accessed by a shear driveway on each lot. Size and location as shown in the application. Date: August 26, 2016 Client: Nguyen Thang Q | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 26, 2016 | Permit id: 689195 |