Content |
---|
Remodel - homeowner as gc for interior kitchen, master bath, master closet, and powder room remodel. All work on main level, 436 sf total, 195 sf in kitchen, 241 sf for other work. Scope includes adding prep sink, structural and non-structural wall reconfiguartion, replacement of 4 windows and 1 exterior door, reconfiguration of kitchen, closet, bath, and powder room spaces. Includes associated meps. ![]() ![]() Client: Michael Lotte | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Single family detached dwelling, remodel | Permit id: Pmt2017-00751 |
SCORE 77 New pv system that is flush mounted and grid tied. 3 kw. Client: Sibylle Hechtel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 29, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-04200 |
Overlay of southern portion of western wing of residence with dimensional shingles, only one layer currently exists, maximum 2 layers. 6. 7 squares, roof pitch represented by applicant to be 4:12. ![]() ![]() Client: Sibylle Hechtel | Permit type: Roofing | Permit status: Cmp | Completion date: June 13, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02593 |
Replacement of existing forced air hvac system with new boiler. System to include combination of in-floor and baseboard heat. ![]() ![]() Client: Sibylle Hechtel | Permit type: Mechanical | Permit status: Cmp | Completion date: November 16, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-02940 |
SCORE 59 Replacement of existing forced air hvac system with new boiler. System to include combination of in-floor and baseboard heat. ![]() ![]() Client: Sibylle Hechtel | Applicant: Sibylle Hechtel | Permit type: Mechanical | Permit status: Iss | Current use: Single family d |
SCORE 99 Tear-off & reroof of sfd, 5 squares of asphalt shingles on front side of the pitched roof, with a pitch represented as 12 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. ![]() ![]() Client: Michael Lotte | Applicant: Arapahoe Roofing & Sheet Metal, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: October 3, 2013 | Current use: Single family d |
SCORE 99 Tear-off & reroof of sfd, 5 squares of asphalt shingles on front side of the pitched roof, with a pitch represented as 12 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Michael Lotte | Permit type: Roofing | Permit status: Cmp | Completion date: October 3, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04109 |
SCORE 96 Total tear-off & reroof of sfd, 9 squares of asphalt shingles on a pitch represented as 4 12 and mansard wall. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. ![]() ![]() Client: James Tangler | Applicant: Mountain Rooftops Inc | Permit type: Roofing | Permit status: Iss | Current use: Single family d |
SCORE 96 Total tear-off & reroof of sfd, 9 squares of asphalt shingles on a pitch represented as 4 12 and mansard wall. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: James Tangler | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03426 |
SCORE 100 Replace gas service ![]() ![]() Client: Sibylle Hechtel | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |