Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit status: Completed | Permit id: 672510 | |||||
Addition permit ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit status: Active | Permit id: 672513 | |||||
Zoning use permit ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit status: Completed | Permit id: 672510 | |||||
Addition permit ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit status: Completed | Permit id: 672513 | |||||
Permit for storage of operable and inoperable vehicles (equipment and material storage yards and buildings) (no dismantling or wrecking of used motor vehicles) and auto repair shop (personal vehicle repair and maintenance) in an existing one story structure. ![]() Client: Bonino Joseph Sr Bonino Rachel | Applicant: Shawn Ward, Esq. | Permit type: Appeal | Permit id: 29595 | |||||
SCORE 65 Rebuild bathroom alongside interior finish work. Separate permit reqd for certificate of occupancy (co) & any plumbing or electrical work. ![]() ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit type: Alteration permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 745872 | |||||
SCORE 93 Install 2 amp electrical service. Install 6 fluorescent lights. Install 3 receptacles. Install 1 bathroom light per 2008 nec (commercial) ![]() ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 745411 | |||||
For storage of operable and inoperable vehicles (equipment and material storage yards and buildings) (no dismantling or wrecking of used motor vehicles) and auto repair shop (personal vehicle repair and maintenance)in an existing one story structure. Per proviso - all vehicle repairs indoors. No sign on this permit. ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit type: Use permit | Permit status: Completed | Completion date: July 7, 2017 | Permit id: 741963 | |||||
SCORE 65 Remove existing partially collapsed fire damaged frame roof per plan; installation of new cmu block walls above existing 16" thick wall to raise roof height; installation of steel bar joists bearing on front and rear walls with new class a rubber roof on rigid insulation and metal decking, provide door opening at exterior wall and strength overhead door lintels per engineers plan.. Separate permits required for interior fitout and all mechanical, electrical, plumbing and fire suppression work. Certificate of occupancy to be obtained under separate cover fitout review ![]() ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit type: Addition permit | Permit status: Completed | Completion date: November 25, 2016 | Permit id: 672513 | |||||
SCORE 96 Add toilet & sink the installation will comply with the philadelphia plumbing code 2004 ![]() ![]() Client: Bonino Joseph Sr Bonino Rachel | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 759084 |