Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Kalmia bridge project-telecom cables need rerouting to have clear work area for crane scheduled to be on site. This will require placing a pole on e beach side, rerouting cables then removing pole on w beach side. Date: December 5, 2013 Contractor: Verizon Permit type: Over head work; aerial telecom connection, over head work; pole installation (single or first one), over head work; pole removal (single or first one) | Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | |||||
SCORE 95 Install 23 poles and 2302 of wire on kalmia road and west beach drive, nw as indicated on the attached prints. Use of typicals. Wr #3343041 (gjn) at 1 calendar days Date: October 27, 2010 Contractor: Pepco Phi Holdings Inc Permit type: Over head work; string telecom wire/fiber, over head work; pole installation (each addl) | Permit status: Permit expired | Expiration date: May 2, 2011 | Permit id: Pa58323 | |||||
SCORE 95 Over head work; string telecom wire fiber, over head work; pole installation (each addl) Date: November 2, 2010 Contractor: Pepco Phi Holdings Inc Permit status: 8 | Expiration date: May 2, 2011 | Permit id: Pa58323 | |||||
SCORE 95 Over head work; aerial telecom connection, over head work; pole installation (single or first one), over head work; pole removal (single or first one) Contractor: Verizon Permit status: 3 | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 95 Kalmia bridge project-telecom cables need rerouting to have clear work area for crane scheduled to be on site. This will require placing a pole on e beach side, rerouting cables then removing pole on w beach side. Contractor: Verizon Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 95 Over head work; aerial telecom connection, over head work; pole installation (single or first one), over head work; pole removal (single or first one) Contractor: Verizon Permit status: 3 | Expiration date: February 14, 2014 | Permit id: 0 | |||||
SCORE 95 Kalmia bridge project-telecom cables need rerouting to have clear work area for crane scheduled to be on site. This will require placing a pole on e beach side, rerouting cables then removing pole on w beach side. Contractor: Verizon Permit status: Cancel/withdrawn | Expiration date: February 14, 2014 | Permit id: 0 |