Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 27, 2013 Contractor: Aaron M Eriksson Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: October 30, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 27, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 30, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 27, 2013 Contractor: Eriksson Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 30, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 94 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 1, 2017 Contractor: Anderson Heating And Air Conditioning Inc Permit type: Addn | Permit status: Completed | Completion date: March 8, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: October 28, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |