Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Finish two rooms in the basement of 17 donnell street. An internal french drain system currently exists in the entire basement and walls have a vaor barrier, and coated with 1/4 inch of fiberglass/stucco compound. The first room, a laundry area will be carpeted and finished sheetrock in 3 walls as well as ceiling (r19). The fourth wall will be left exposed and decorated as a feature wall (blue wall in drawings). The ceiling will be approximatelly 68+ with several protrusions and soffits to cover the piping. A steam heat pipe will be left exposed (as is). This pipe run along the room at a height of 65 at high point and 62 at lowest. Area under washer and dryer will be tiled. He second room will be finished as a bathroom by adding a wall to enclose the space (see green walls in drawing). The bathroom will contain a shower stall, toilet and vanity/sink an will be vented to outside. Floor and shower stall will be tiled while rest of walls and ceiling will be sheetrocked. Ceiling will have Permit type: Addition/alteration | Completion date: November 25, 2014 | Current use: One-family | Parcel: 229137 | |||||
SCORE 89 Finish two rooms in the basement of 17 donnell street. An internal french drain system currently exists in the entire basement and walls have a vaor barrier, and coated with 1 4 inch of fiberglass stucco compound. The first room, a laundry area will be carpeted and finished sheetrock in 3 walls as well as ceiling (r19). The fourth wall will be left exposed and decorated as a feature wall (blue wall in drawings). The ceiling will be approximatelly 68+ with several protrusions and soffits to cover the piping. A steam heat pipe will be left exposed (as is). This pipe run along the room at a height of 65 at high point and 62 at lowest. Area under washer and dryer will be tiled. He second room will be finished as a bathroom by adding a wall to enclose the space (see green walls in drawing). The bathroom will contain a shower stall, toilet and vanity sink an will be vented to outside. Floor and shower stall will be tiled while rest of walls and ceiling will be sheetrocked. Ceiling will have Permit type: Addition/alteration | Completion date: November 25, 2014 | Current use: One-family | Permit id: 0 | Parcel: 229137 |