Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Bathroom renovation Date: April 19, 2016 Contractor: Dean Phillips Plumbingangela Dean Permit type: Plumbing | Permit status: Inspections | Completion date: April 19, 2016 | Current use: Residential | Permit id: Bld2016-03661 | |||||
SCORE 81 Remove & replace only. Electrical remodel of upper level bathroom and hall Date: May 11, 2016 Contractor: Spartan Electric Incbathroom Remodel Permit type: Electrical | Permit status: Inspections | Completion date: May 11, 2016 | Current use: Residential | Permit id: Bld2016-04471 | |||||
SCORE 84 Remove and replace existing stairs, same footprint using existing footings. Stairs connected to existing wall. Replace all rotting wood. No change in footprint, electrical permit required. Date: April 11, 2014 Contractor: Schneider Enterprises Lc Permit status: Pass | Completion date: April 16, 2014 | Current use: Residential | Permit id: Bld2014-02385 | |||||
SCORE 64 24-2 watt roof mount Date: September 11, 2014 Permit type: Solarpv | Permit status: Pass | Completion date: October 10, 2014 | Current use: Residential | Permit id: Bld2014-06617 | |||||
SCORE 59 Replace 23 windows, bedrooms must meet egress, no change in rough opening, all windows on main and 2nd floor; r-1-50 sfd ju Date: September 8, 2009 Contractor: United Subcontractors, Inc.Kowallis Residence Permit status: In progress | Completion date: September 8, 2009 | Current use: Residential | Permit id: Bld2009-05410 | |||||
SCORE 80 Service change sfd Date: April 11, 2014 Contractor: Noot Electric, Llc Permit type: Electrical | Permit status: Pass | Completion date: April 25, 2014 | Current use: Residential | Permit id: Bld2014-02393 | |||||
SCORE 59 Bathroom renovation room reconfiguration. M. E. P. Reqd. Date: February 4, 2016 Contractor: J B Construction Services Incangela Dean Permit status: Closed | Completion date: October 19, 2016 | Current use: Residential | Permit id: Bld2016-00907 |