Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. Ref pa# 2011 10 14 6841. Guard rail only for osha safety requirments; no new roof deck proposed or additional changes. Date: April 22, 2015 Value: $70,000 Permit type: Otc alterations permit | Expiration date: April 8, 2015 | Current use: Apartments | Permit id: 201504083079 | |||||
Add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. Ref pa# 2011 10 14 6841. Guard rail only for osha safety requirments; no new roof deck proposed or additional changes. Date: April 22, 2015 Value: $70,000 Permit type: Otc alterations permit | Expiration date: April 8, 2015 | Current use: Apartments | Permit id: 201504083079 | |||||
Erect 6 story 38 unit residential commercial condominium building. Date: October 14, 2011 Current use: Apartments | Permit id: #201110146841 | |||||
SCORE 100 To erect 6 story 38 unit residential commercial condominium building. Date: October 14, 2011 Value: $17,557,975 Current use: Apartments | Permit id: #201110146841 | |||||
SCORE 100 Demolish 2-story automotive repair bldg. Current use: Auto repairs | Permit id: #201207034043 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011 10 14 6841 & demo pa# 2012 07 03 4043. Current use: Auto repairs | Permit id: #201207205396 | |||||
SCORE 100 Alteration to approved site permit #201110146841. Deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a lightwall versus a court . Impact to layout of the adjacent unit on 2nd fl & up. Addition of a 1 bedrm unit @ the 2nd fl unit #205b Date: November 15, 2012 Current use: Apartments | Permit id: #201211154353 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011 10 14 6841 & demo pa# 2012 07 03 4043. Date: July 20, 2012 Contractor: Cahill Contractors Inc Current use: Auto repairs | Permit id: #201207205396 | |||||
SCORE 100 Erect and operate tower crane for use during construction. Tower crane foundation is part of building foundation. Ref demo pa# 2012 07 03 4043. Site pa# 2011 10 14 6841. Current use: Apartments | Permit id: #201301117807 | |||||
SCORE 100 Alteration to approved site permit #201110146841. Deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a lightwall versus a court . Impact to layout of the adjacent unit on 2nd fl & up. Addition of a 1 bedrm unit @ the 2nd fl unit #205b Date: November 15, 2012 Value: $164,793 Current use: Apartments | Permit id: #201211154353 | |||||
SCORE 100 Shoring revision to issued pa# 201207205396. Reduce the concrete strength to 25 psi in the underpinning piers lintel beams & soldier beam ties. Addresses the surchage effects created by a crane to be used to erect the tower crane. Max outrigger loads of 186 kips are contemplated for the heavies Current use: Retail sales | Permit id: #201306078971 | |||||
SCORE 100 Install evac signs on floors b 1-6 r. N a for the maher ordinance #155-13 Current use: Apartments | Permit id: #201402279430 | |||||
SCORE 100 New fire alarm device for new tenant build out to include 1 duct detector 1 relay module Current use: Apartments | Permit id: #201406188764 | |||||
SCORE 98 Pg&e electric conduit install 4" (service no & size-vault connection) @ street. Date: April 11, 2013 Contractor: A And B Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201304119902 | |||||
SCORE 96 Install car lift system and lights Date: March 7, 2014 Contractor: Klaus Multiparking Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140307701 | |||||
New construction: complete new fire alarm system throughout entire building. Date: March 19, 2014 Permit type: Electrical permit | Permit status: Issued | Permit id: E201403198207 | |||||
To install the television telephone and security wiring for a 39 unit apartment complex. Date: November 20, 2013 Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20131120921 | |||||
SCORE 100 Install 27 roof mounted solar pv modules 3 watts per module install 2 interactive inverters 3. 5 kw 8. 1 kw Date: September 2, 2014 Contractor: Solarcraft Services Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201409022432 | |||||
SCORE 100 Installing new lighting fixtures Date: September 18, 2014 Contractor: Artistic Lighting And Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140918463 | |||||
SCORE 98 Pg&e electric conduit install 4" (service no & size-vault connection) @ street. Date: April 11, 2013 Contractor: A And B Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201304119902 | |||||
SCORE 100 New construction: 39 units: each unit: install heat pump exhaust fan dryer & kitchen hoods. Common areas: outside air air system exhaust fan & fsd. 3 retail spaces: heat pumps exhaust fan & duct work. Ok rf. Date: April 21, 2014 Contractor: Tuck Aire Heating And Air Conditioning Corp Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140421095 | |||||
SCORE 66 Work category: 3pb; installing 59 shower pans over 31 units Date: December 16, 2013 Contractor: Creative Stone Inc Dba American Tile And S Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131216777 | |||||
SCORE 100 Work category: 3pc; ground up 38 unit condominium project with 3 future retail spaces. Date: February 7, 2013 Contractor: City Front Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130207548 | |||||
SCORE 100 Shoring revision to issued pa# 201207205396. Reduce the concrete strength to 25 psi in the underpinning piers lintel beams & soldier beam ties. Addresses the surchage effects created by a crane to be used to erect the tower crane. Max outrigger loads of 186 kips are contemplated for the heavies Permit type: Building permit | Expiration date: November 1, 2013 | Current use: Retail sales | Permit id: #201306078971 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011/10/14/6841 & demo pa# 2012/07/03/4043. Date: July 20, 2012 Contractor: Cahill Contractors Inc Permit type: Building permit | Current use: Auto repairs | Permit id: #201207205396 | |||||
SCORE 100 New fire alarm device for new tenant build out to include 1 duct detector 1 relay module Permit type: Building permit | Expiration date: October 18, 2014 | Current use: Apartments | Permit id: #201406188764 | |||||
SCORE 100 New boiler installation for 2 dhw Date: June 6, 2014 Contractor: City Front Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140606313 | |||||
SCORE 100 Erect and operate tower crane for use during construction. Tower crane foundation is part of building foundation. Ref demo pa# 2012/07/03/4043. Site pa# 2011/10/14/6841. Permit type: Building permit | Expiration date: March 7, 2014 | Current use: Apartments | Permit id: #201301117807 | |||||
SCORE 95 New construction: complete new fire alarm system throughout entire building. Date: March 19, 2014 Contractor: Pyrocomm Systems Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201403198207 | |||||
SCORE 100 Alteration to approved site permit #201110146841. Deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a "lightwall" versus a "court". Impact to layout of the adjacent unit on 2nd fl & up. Addition of a 1 bedrm unit @ the 2nd fl unit #205b Date: November 15, 2012 Permit type: Building permit | Current use: Apartments | Permit id: #201211154353 | |||||
SCORE 84 To install the television telephone and security wiring for a 39 unit apartment complex. Date: November 20, 2013 Contractor: Citywide Electronic Systems Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20131120921 | |||||
SCORE 100 Alteration to approved site permit #201110146841. Deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a "lightwall" versus a "court". Impact to layout of the adjacent unit on 2nd fl & up. Addition of a 1 bedrm unit @ the 2nd fl unit #205b Date: November 26, 2013 Value: $164,793 Permit type: Building permit | Expiration date: May 26, 2014 | Current use: Apartments | Permit id: #201211154353 | |||||
SCORE 100 Work category: 4pb; fire sprinklers Date: October 24, 2013 Contractor: Rcm Fire Protection Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131024505 | |||||
SCORE 100 Shoring revision to issued pa# 201207205396. Reduce the concrete strength to 25 psi in the underpinning piers lintel beams & soldier beam ties. Addresses the surchage effects created by a crane to be used to erect the tower crane. Max outrigger loads of 186 kips are contemplated for the heavies Permit type: Building permit | Expiration date: November 1, 2013 | Current use: Retail sales | Permit id: #201306078971 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011 10 14 6841 & demo pa# 2012 07 03 4043. Date: July 20, 2012 Contractor: Cahill Contractors Inc Permit type: Building permit | Current use: Auto repairs | Permit id: #201207205396 | |||||
SCORE 100 Erect and operate tower crane for use during construction. Tower crane foundation is part of building foundation. Ref demo pa# 2012 07 03 4043. Site pa# 2011 10 14 6841. Permit type: Building permit | Expiration date: March 7, 2014 | Current use: Apartments | Permit id: #201301117807 | |||||
Install 27 roof mounted solar pv modules 3 watts per module install 2 interactive inverters 3. 5 kw 8. 1 kw Permit status: Complete | Permit id: E201409022432 | |||||
Pg&e electric conduit install 4" (service no & size-vault connection) @ street. Permit status: Complete | Permit id: E201304119902 | |||||
Install car lift system and lights Permit status: Complete | Permit id: Ew20140307701 | |||||
1) temporary power 200amp; 2) new construction: complete new electrical wiring for 39 units (6 floors) of residential type 1 construction serviced by a 2000amp 120 208v 3 phase main switchboard. Feeder distribution unit branch wiring installation of fixtures f a conduit cctv lines cat 5e data cable drops and catv. All new wiring for each unit lights switches receptacles smoke detectors co detectors 100amp subpanels in each unit. Permit status: Complete | Permit id: E201302078373 | |||||
Demo & correction of electrical wiring at the office located at 1645 pacific ave. 1 light. Permit status: Complete | Permit id: E200904018282 | |||||
Adding ev car charging station 100amp disconnect & meter in garage area. 5-stack meter stack for future ev. Permit status: Complete | Permit id: E201408272313 | |||||
New construction: complete new fire alarm system throughout entire building. Permit status: Complete | Permit id: E201403198207 | |||||
Installing new lighting fixtures Permit status: Filed | Permit id: Ew20140918463 | |||||
Tenant improvement: 1 f: 1-125amp 120 208 subpanel 13 receptacles 6 switches (1) 120ft track light. Permit status: Complete | Permit id: E20140606202 | |||||
To install the television telephone and security wiring for a 39 unit apartment complex. Permit status: Complete | Permit id: Ew20131120921 | |||||
Adding ev car charging station 100amp disconnect & meter in garage area. 5-stack meter stack for future ev. Permit status: Complete | Permit id: E201408272313 | |||||
1) temporary power 200amp; 2) new construction: complete new electrical wiring for 39 units (6 floors) of residential type 1 construction serviced by a 2000amp 120 208v 3 phase main switchboard. Feeder distribution unit branch wiring installation of fixtures f a conduit cctv lines cat 5e data cable drops and catv. All new wiring for each unit lights switches receptacles smoke detectors co detectors 100amp subpanels in each unit. Permit status: Complete | Permit id: E201302078373 | |||||
Install car lift system and lights Permit status: Complete | Permit id: Ew20140307701 | |||||
Pg&e electric conduit install 4" (service no & size-vault connection) @ street. Permit status: Complete | Permit id: E201304119902 | |||||
Install 27 roof mounted solar pv modules 3 watts per module install 2 interactive inverters 3. 5 kw 8. 1 kw Permit status: Complete | Permit id: E201409022432 | |||||
Demo & correction of electrical wiring at the office located at 1645 pacific ave. 1 light. Permit status: Complete | Permit id: E200904018282 | |||||
Installing new lighting fixtures Permit status: Filed | Permit id: Ew20140918463 | |||||
New construction: complete new fire alarm system throughout entire building. Permit status: Complete | Permit id: E201403198207 | |||||
To install the television telephone and security wiring for a 39 unit apartment complex. Permit status: Complete | Permit id: Ew20131120921 | |||||
Tenant improvement: 1 f: 1-125amp 120 208 subpanel 13 receptacles 6 switches (1) 120ft track light. Permit status: Complete | Permit id: E20140606202 | |||||
Permit to operate boiler Date: June 12, 2014 Permit status: Issued | Expiration date: June 12, 2014 | Permit id: 74572 | |||||
Permit to operate boiler Date: September 24, 2015 Permit status: Issued | Expiration date: September 24, 2015 | Permit id: 82832 | |||||
Permit to operate boiler Date: October 6, 2016 Permit status: Issued | Expiration date: October 6, 2016 | Permit id: 90394 | |||||
Permit to operate boiler Date: September 29, 2017 Permit status: Issued | Expiration date: September 29, 2017 | Permit id: 97434 | |||||
Sidewalk permit Date: May 2, 2006 Permit type: Otc alterations permit | Expiration date: May 2, 2006 | Permit id: M37393 | |||||
Parapet. Date: December 15, 1988 Value: $15,000 Permit type: Additions alterations or repairs | Completion date: January 20, 1989 | Expiration date: October 13, 1988 | Current use: Auto repairs | Permit id: 8815464 | |||||
Reroofing. Date: September 14, 1993 Value: $18,550 Permit type: Otc alterations permit | Expiration date: September 14, 1993 | Current use: Prkng garage/public | Permit id: 9315855 | |||||
Vehicle ramp repair Date: May 19, 1998 Value: $8,500 Permit type: Otc alterations permit | Expiration date: May 19, 1998 | Current use: Auto repairs | Permit id: 9809084 | |||||
Erect 6 stories, residential condos building. Date: July 18, 2007 Value: $18,000,000 Permit type: New construction | Expiration date: July 18, 2007 | Permit id: 200707187066 | |||||
To erect 6 story 38 unit residential commercial condominium building. Date: October 4, 2012 Value: $13,800,000 Permit type: New construction | Completion date: November 12, 2014 | Expiration date: October 14, 2011 | Permit id: 201110146841 | |||||
Demolish 2-story automotive repair bldg. Date: October 4, 2012 Value: $85,000 Permit type: Demolitions | Completion date: March 7, 2013 | Expiration date: July 3, 2012 | Current use: Auto repairs | Permit id: 201207034043 | |||||
Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011 10 14 6841 & demo pa# 2012 07 03 4043. Date: October 5, 2012 Value: $60,000 Permit type: Additions alterations or repairs | Completion date: June 4, 2014 | Expiration date: July 20, 2012 | Current use: Auto repairs | Permit id: 201207205396 | |||||
Alteration to approved site permit #201110146841. Deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a "lightwall" versus a "court". Impact to layout of the adjacent unit on 2nd fl & up. Addition of a 1 bedrm unit @ the 2nd fl unit #205b Date: November 26, 2013 Value: $20,000 Permit type: Additions alterations or repairs | Completion date: July 1, 2014 | Expiration date: November 15, 2012 | Permit id: 201211154353 | |||||
Street space Date: December 13, 2012 Permit type: Otc alterations permit | Expiration date: December 13, 2012 | Permit id: M362448 | |||||
Erect and operate tower crane for use during construction. Tower crane foundation is part of building foundation. Ref demo pa# 2012 07 03 4043. Site pa# 2011 10 14 6841. Date: March 7, 2013 Value: $20,000 Permit type: Additions alterations or repairs | Completion date: February 19, 2014 | Expiration date: January 11, 2013 | Permit id: 201301117807 | |||||
Shoring revision to issued pa# 201207205396. Reduce the concrete strength to 25 psi in the underpinning piers, lintel beams & soldier beam ties. Addresses the surchage effects created by a crane to be used to erect the tower crane. Max outrigger loads of 186 kips are contemplated for the heavies Date: July 1, 2013 Value: $1 Permit type: Otc alterations permit | Completion date: June 11, 2014 | Expiration date: June 7, 2013 | Current use: Retail sales | Permit id: 201306078971 | |||||
Street space Date: June 27, 2013 Permit type: Otc alterations permit | Expiration date: June 27, 2013 | Permit id: M404587 | |||||
Street space permit (renewal of permit # 1297637 (m404587) Date: December 20, 2013 Permit type: Otc alterations permit | Expiration date: December 20, 2013 | Permit id: M452827 | |||||
Install evac signs on floors b,1-6,r. N a for the maher ordinance #155-13 Date: February 27, 2014 Value: $8,100 Permit type: Otc alterations permit | Completion date: June 10, 2014 | Expiration date: February 27, 2014 | Current use: Vacant lot | Permit id: 201402279430 | |||||
Street space Date: April 30, 2014 Permit type: Otc alterations permit | Expiration date: April 30, 2014 | Permit id: M484067 | |||||
New fire alarm device for new tenant build out to include 1 duct detector, 1 relay module Date: June 18, 2014 Value: $2,000 Permit type: Otc alterations permit | Completion date: June 30, 2014 | Expiration date: June 18, 2014 | Current use: Apartments | Permit id: 201406188764 | |||||
Erect (1) non-electric double faced projecting signs. N a maher ordinance Date: February 13, 2015 Value: $1,000 Permit type: Sign - erect | Expiration date: February 13, 2015 | Current use: Apartments | Permit id: 201502138328 | |||||
Install car lift system and lights Date: March 7, 2014 Permit status: Complete | Completion date: May 16, 2014 | Permit id: Ew20140307701 | |||||
1) temporary power 200amp; 2) new construction: complete new electrical wiring for 39 units (6 floors) of residential type 1 construction serviced by a 2000amp 120 208v, 3 phase main switchboard. Feeder distribution, unit branch wiring, installation of fixtures, f a conduit, cctv lines, cat 5e data cable drops and catv. All new wiring for each unit, lights, switches, receptacles, smoke detectors, co detectors, 100amp subpanels in each unit. Date: February 7, 2013 Permit status: Complete | Completion date: June 30, 2014 | Permit id: E201302078373 | |||||
Install 27 roof mounted solar pv modules, 3 watts per module, install 2 interactive inverters, 3. 5 kw, 8. 1 kw Date: September 2, 2014 Permit status: Complete | Completion date: November 5, 2014 | Permit id: E201409022432 | |||||
Pg&e electric conduit install, 4" (service no & size-vault connection) @ street. Date: April 11, 2013 Permit status: Complete | Completion date: June 30, 2014 | Permit id: E201304119902 | |||||
Tenant improvement: 1 f: 1-125amp 120 208 subpanel, 13 receptacles, 6 switches, (1) 120ft track light. Date: June 6, 2014 Permit status: Complete | Completion date: June 26, 2014 | Permit id: E20140606202 | |||||
To install the television, telephone and security wiring for a 39 unit apartment complex. Date: November 20, 2013 Permit status: Complete | Completion date: June 30, 2014 | Permit id: Ew20131120921 | |||||
Demo & correction of electrical wiring at the office located at 1645 pacific ave. 1 light. Date: April 1, 2009 Permit status: Complete | Completion date: April 8, 2009 | Permit id: E200904018282 | |||||
Installing new lighting fixtures Date: September 18, 2014 Permit status: Expired | Permit id: Ew20140918463 | |||||
Adding ev car charging station 100amp disconnect & meter in garage area. 5-stack meter stack for future ev. Date: August 27, 2014 Permit status: Complete | Completion date: September 3, 2014 | Permit id: E201408272313 | |||||
Work category: 4pb; fire sprinklers Date: October 24, 2013 Permit status: Complete | Completion date: May 23, 2014 | Expiration date: October 24, 2013 | Permit id: Pw20131024505 | |||||
New boiler installation for 2 dhw Date: June 6, 2014 Permit status: Complete | Completion date: June 9, 2014 | Expiration date: June 6, 2014 | Permit id: Pp20140606313 | |||||
Work category: 3pb; installing 59 shower pans over 31 units Date: December 16, 2013 Permit status: Complete | Completion date: June 2, 2014 | Expiration date: December 16, 2013 | Permit id: Pw20131216777 | |||||
Work category: 3pc; ground up 38 unit condominium project with 3 future retail spaces. Date: February 7, 2013 Permit status: Complete | Completion date: June 2, 2014 | Expiration date: February 7, 2013 | Permit id: Pw20130207548 | |||||
8in storm drain, 8in side sewer to 10in combined sewer, 8in storm drain & (1) one man hole. Date: January 6, 2014 Permit status: Complete | Completion date: January 10, 2014 | Expiration date: January 6, 2014 | Permit id: Pp20140106165 | |||||
New construction: 39 units: each unit: install heat pump, exhaust fan, dryer & kitchen hoods. Common areas: outside air air system exhaust fan & fsd. 3 retail spaces: heat pumps, exhaust fan & duct work. Ok rf. Date: April 21, 2014 Permit status: Expired | Expiration date: April 21, 2014 | Permit id: Pm20140421095 | |||||
SCORE 100 Install evac signs on floors b 1-6 r. N/a for the maher ordinance #155-13 Permit type: Building permit | Expiration date: August 27, 2014 | Current use: Apartments | Permit id: #201402279430 | |||||
SCORE 100 Shoring revision to issued pa# 201207205396. Reduce the concrete strength to 25 psi in the underpinning piers lintel beams & soldier beam ties. Addresses the surchage effects created by a crane to be used to erect the tower crane. Max outrigger loads of 186 kips are contemplated for the heavies Permit type: Building permit | Expiration date: November 1, 2013 | Current use: Retail sales | Permit id: #201306078971 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011 10 14 6841 & demo pa# 2012 07 03 4043. Date: July 20, 2012 Contractor: Cahill Contractors Inc Permit type: Building permit | Current use: Auto repairs | Permit id: #201207205396 | |||||
SCORE 99 Tenant improvement: 1/f: 1-125amp 120/208 subpanel 13 receptacles 6 switches (1) 120ft track light. Date: June 26, 2014 Contractor: Helix Electric Inc Permit type: Electrical permit | Permit status: Complete | Permit id: E20140606202 | |||||
SCORE 100 Erect and operate tower crane for use during construction. Tower crane foundation is part of building foundation. Ref demo pa# 2012 07 03 4043. Site pa# 2011 10 14 6841. Permit type: Building permit | Expiration date: March 7, 2014 | Current use: Apartments | Permit id: #201301117807 | |||||
SCORE 100 Shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. New construction pa# 2011/10/14/6841 & demo pa# 2012/07/03/4043. Permit type: Building permit | Expiration date: October 5, 2013 | Current use: Auto repairs | Permit id: #201207205396 |