Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 18, 2017 Contractor: Manzanita Equity Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 96 Water heater replacement, no modifications or alternations to existing system Date: May 29, 2015 Contractor: California Delta Mechanical Inc Permit type: Addn | Permit status: Issued expired | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 8, 2017 Contractor: Vivint Solar Developer Llc Permit type: Addn | Permit status: Completed | Completion date: December 28, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 96 Water heater replacement, no modifications or alternations to existing system Date: May 29, 2015 Contractor: California Delta Mechanical Inc Permit type: Hra water heater r&r | Permit status: Issued expired | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 8, 2017 Contractor: Vivint Solar Developer Llc Permit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 18, 2017 Contractor: Manzanita Equity Inc Permit type: Hvac change out | Permit status: Issued | Permit id: Pds2017-Resalt- | Parcel: 6784804200 |