Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 21 sqft re-roof to (e) sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer owens corning brand and model tru def duration color (if cool roof required) amber (orange) crrc 0890-0009 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: July 19, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 New heater and new condenser Date: August 14, 2017 Contractor: Cool It Heat It Permit type: Addn | Permit status: Completed | Completion date: August 16, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 2, 2017 Contractor: Sun Dynamics Electric Inc Permit type: Addn | Permit status: Completed | Completion date: August 1, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: August 23, 2007 Permit status: Pass | Permit id: Pds2007-1007-20 |