Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Renovate existing double - repair replace electrical system, plumbing system, hvac, hang tape float and finish sheetrock, paint interior walls, ceiling and trim, install laminate floor, install kitchen and bath cabinets and countertops, exterior painting, structural termite damage repairs, window reinstallment and remove all trash and debris as per hdlc c a # 16-17515-hdlc. Client: Alma D Kirkland | Permit type: Renovation (structural) | Permit status: Permit issued | Current use: Two-family | |||||
SCORE 82 Renovate existing double - repair replace electrical system, plumbing system, hvac, hang tape float and finish sheetrock, paint interior walls, ceiling and trim, install laminate floor, install kitchen and bath cabinets and countertops, exterior painting, and remove all trash and debris. Client: Alma D Kirkland | Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Two-family |