Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Interior remodel of main floor - kitchen and bath, new electrical through out, bath room window (no change in rough openin), cabinets flooring, sheetrock repair and new, paint. J. U. Not historic or yc. R-1-5000, sfd, interior remodel of main floor kitchen and bath, electrical, plumbing and mechanical permits required. J. U. 4/26/ change out 3 windows, 2 basement 1 kitchen no change in rough openings, jukena 5/12/ amended permit to include a beam in an arch way that was discovered while permited work was being done, between dining and living room area, additional plans attached to both sets of plans. Date: April 19, 2010 Contractor: Hansen Residence Permit type: Permit | Permit status: In progress | Completion date: April 19, 2010 | Current use: Residential | Permit id: Bld2010-02459 | |||||
SCORE 84 Install furnace & ac Date: February 17, 2010 Contractor: Cmc Heating And Air Conditioning Llc Permit type: Mechanical | Permit status: On-line ready | Completion date: February 17, 2010 | Current use: Residential | Permit id: Bld2010-00821 | |||||
SCORE 82 Homeowner electric remodel permit of entire s/f dwelling. Date: April 21, 2010 Contractor: Hansen Residence Permit type: Electrical | Permit status: Closed | Completion date: July 27, 2010 | Current use: Residential | Permit id: Bld2010-02536 | |||||
SCORE 82 Adding 3 plumbing fixtures, and 1 water heater for interior remodel of main floor - kitchen and bath. Date: April 21, 2010 Contractor: Hansen Residence Permit type: Plumbing | Permit status: Closed | Completion date: July 27, 2010 | Current use: Residential | Permit id: Bld2010-02537 | |||||
SCORE 64 Install furnace & ac Date: February 17, 2010 Permit type: Mechanical | Permit status: On-line ready | Completion date: February 17, 2010 | Current use: Residential | Permit id: Bld2010-00821 | |||||
SCORE 64 Re-roof house per attached document. K. A. No zoning issues. A. M. Date: January 11, 2010 Contractor: Full Systems Llchansen Residence Permit type: Roofing | Permit status: Closed | Completion date: February 23, 2011 | Current use: Residential | Permit id: Bld2010-00099 | |||||
SCORE 64 Re-roof house per attached document. K. A. No zoning issues. A. M. Date: January 11, 2010 Contractor: Full Systems Llchansen Residence Permit type: Roofing | Permit status: Closed | Completion date: February 23, 2011 | Current use: Residential | Permit id: Bld2010-00099 | |||||
SCORE 64 Install furnace & ac Date: February 17, 2010 Permit type: Mechanical | Permit status: Inspections | Completion date: February 17, 2010 | Current use: Residential | Permit id: Bld2010-00821 | |||||
SCORE 82 Interior remodel of main floor - kitchen and bath, new electrical through out, bath room window (no change in rough openin), cabinets flooring, sheetrock repair and new, paint. J. U. Not historic or yc. R-1-5000, sfd, interior remodel of main floor kitchen and bath, electrical, plumbing and mechanical permits required. J. U. 4 26 change out 3 windows, 2 basement 1 kitchen no change in rough openings, jukena 5 12 amended permit to include a beam in an arch way that was discovered while permited work was being done, between dining and living room area, additional plans attached to both sets of plans. Date: April 19, 2010 Contractor: Hansen Residence Permit status: Inspections | Completion date: April 19, 2010 | Current use: Residential | Permit id: Bld2010-02459 | |||||
SCORE 82 Homeowner electric remodel permit of entire s f dwelling. Date: April 21, 2010 Contractor: Hansen Residence Permit type: Electrical | Permit status: Closed | Completion date: July 27, 2010 | Current use: Residential | Permit id: Bld2010-02536 | |||||
SCORE 82 Adding 3 plumbing fixtures, and 1 water heater for interior remodel of main floor - kitchen and bath. Date: April 21, 2010 Contractor: Hansen Residence Permit type: Plumbing | Permit status: Closed | Completion date: July 27, 2010 | Current use: Residential | Permit id: Bld2010-02537 |