Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Plumbing for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260019 | |||||
SCORE 86 Elctrical for booth permit for renaissance fair #f3. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 24, 2013 | Permit id: 1303280003 | |||||
SCORE 86 Temporary booth permit for renaissance fair #f3. Applicant: Mooers Joseph | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280001 | |||||
SCORE 96 Renaissance pleasure fair from april 7 thru june 2007 @ santa fe dam Date: April 6, 2007 Contractor: Renaissance Pleasure Fair Applicant: Hackman Dwight | Permit status: Permisud | Expiration date: October 3, 2007 | Permit id: 704040001 | |||||
SCORE 100 Sce company picnic & linemanss rodeo @ santa fe dam may 21 - june 5, 2007 Date: May 15, 2007 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: November 11, 2007 | Permit id: 705150006 | |||||
SCORE 96 Renaissance pleasure fair from april 8 thru june 23 2006 @ santa fe dam Date: April 7, 2006 Contractor: Renaissance Pleasure Fair Applicant: Elkins Andrew | Permit status: Permisud | Expiration date: October 4, 2006 | Permit id: 604070003 | |||||
SCORE 100 Sce company picnic & linemanss rodeo @ santa fe dam from may 22-june 9 2006 Date: May 1, 2006 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: October 28, 2006 | Permit id: 605010002 | |||||
SCORE 96 Mechanical work for fair from april 7 thru june 2007 @ santa fe dam Date: April 6, 2007 Contractor: Renaissance Pleasure Fair Applicant: Hackman Dwight | Permit status: Permisud | Expiration date: October 3, 2007 | Permit id: 704060003 | |||||
SCORE 93 Electrical work for fair from april 7 thru june 2007 @ santa fe dam Date: April 6, 2007 Contractor: Schultz Controls Applicant: Hackman Dwight | Permit status: Permisud | Expiration date: October 3, 2007 | Permit id: 704060010 | |||||
SCORE 96 Electrical work for renaissance fair Date: April 7, 2006 Contractor: Renaissance Pleasure Fair Applicant: Elkins Andrew | Permit status: Permisud | Expiration date: October 4, 2006 | Permit id: 604070036 | |||||
SCORE 93 Electrical for renaissance fair. Date: March 21, 2008 Contractor: Schultz Controls Applicant: Schultz Controls | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 17, 2008 | Permit id: 803210009 | |||||
SCORE 99 Electrical for renaissance fair for #f6. Date: March 25, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 21, 2008 | Permit id: 803250018 | |||||
SCORE 93 2 ejection pumps for the renaissance entertainment fair. Date: March 27, 2008 Contractor: Schultz Controls Applicant: Schultz Controls | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270004 | |||||
SCORE 91 2 lighting fixtures & 3 exhaust fans for renaissance fair #f8. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270010 | |||||
SCORE 99 Electrical for renaissance fair #f4 & #f5. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270044 | |||||
SCORE 99 Electrical for 6 outlets, 1 range hood and 1 amp panel. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270046 | |||||
SCORE 99 Electrical for 6 outlets, 1 rangehood and 1 1 amp panel for #f2. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270047 | |||||
SCORE 99 Electrical for renaissance fair #f3. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270049 | |||||
SCORE 99 12 outlets,3 range hoods & 100amps panel for renaissance fair #f11 & #12. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270052 | |||||
SCORE 99 Electrical for 1 outlet and 1 generator for #f429. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270054 | |||||
SCORE 99 Electrical for 3 outlets, 1 amp panel and 1 generator for #f1. Date: April 3, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 30, 2008 | Permit id: 804030039 | |||||
SCORE 79 Electrical for renaissance fair #f7. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120026 | |||||
SCORE 79 Electrical for renaissance fair #f4. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120028 | |||||
SCORE 91 Electrical for renaissance fair #f8. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120029 | |||||
SCORE 91 Electrical for renaissance fair #f9. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120031 | |||||
SCORE 89 Electrical for renaissance fair #f5 and #f6. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230020 | |||||
SCORE 89 Electrical for renaissance fair #f3. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230022 | |||||
SCORE 74 Electrical permit for renaissance fair #f10. Date: March 30, 2009 Contractor: Mc Rae Construction Applicant: Mc Rae Construction | Permit status: Permisud | Expiration date: September 26, 2009 | Permit id: 903300021 | |||||
SCORE 100 Electrical permit for renaissance fair #385. Date: March 31, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310008 | |||||
SCORE 89 Electrical permit for renaissance fair #383. Date: March 31, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310011 | |||||
SCORE 89 Electrical permit for renaissance fair #245. Date: March 31, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310013 | |||||
SCORE 93 Electrical for renaissance pleasure fair. Date: March 31, 2009 Contractor: Schultz Controls Applicant: Shultz Controls | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310029 | |||||
SCORE 89 Electrical permit for renaissance fair #385. Date: April 2, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 29, 2009 | Permit id: 904020007 | |||||
SCORE 93 Electrical for renaissance pleasure fair. Date: March 23, 2010 Contractor: Schultz Controls Applicant: Shultz Controls | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 23, 2011 | Permit id: 1003230028 | |||||
SCORE 87 Electrical for renaissance fair #f7. Date: March 24, 2010 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 24, 2011 | Permit id: 1003240018 | |||||
SCORE 100 Electrical permit for renaissance fair #385. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250009 | |||||
SCORE 89 Electrical for renaissance fair #f3. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250032 | |||||
SCORE 89 Electrical permit for renaissance fair #427. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250036 | |||||
SCORE 89 Electrical for renaissance fair #f5 and #f6. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250038 | |||||
SCORE 91 Electrical for renaissance fair #f9. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260012 | |||||
SCORE 91 Electrical for renaissance fair #f8. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260013 | |||||
SCORE 74 Electrical permit for renaissance fair #f10. Date: April 1, 2010 Contractor: Disciple Construction Applicant: Disciple Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: April 1, 2011 | Permit id: 1004010019 | |||||
SCORE 89 Electrical permit for renaissance fair #379. Date: April 6, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: April 6, 2011 | Permit id: 1004060004 | |||||
SCORE 59 Electrical for renaissance pleasure fair. Date: March 24, 2011 Contractor: Shultz Solutions Applicant: Shultz Solutions | Permit status: Permisud | Expiration date: March 23, 2012 | Permit id: 1103240039 | |||||
SCORE 86 Misc conduit amp for temp hook up for renaissance fair#f2 Date: March 28, 2011 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 29, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280020 | |||||
SCORE 96 Space #f9-elec for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280037 | |||||
SCORE 89 Electrical for renaissance fair #f3. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310004 | |||||
SCORE 69 Electrical for booth #312 for rernaissance fair. Date: March 31, 2011 Contractor: G J Construction Co Applicant: G J Construction Co | Permit status: Permisud | Expiration date: March 30, 2012 | Permit id: 1103310006 | |||||
SCORE 89 Electrical for renaissance fair #f5 and #f6. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310008 | |||||
SCORE 89 Electrical permit for renaissance fair #379. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1104040017 | |||||
SCORE 79 Space f - elec for temp booth for renaissance faire Date: April 4, 2011 Contractor: Arthur Construction Applicant: Arthur Kenneth | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: April 3, 2012 | Permit id: 1104040026 | |||||
SCORE 100 Electrical permit for renaissance fair #385. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060028 | |||||
SCORE 100 Electrical permit for renaissance fair #f12 and f13. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060034 | |||||
SCORE 100 Electrical for renaissance fair #f11. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060035 | |||||
SCORE 89 Electrical for renaissance fair #427. Date: April 8, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 7, 2012 | Permit id: 1104080011 | |||||
SCORE 88 Renaissance pleasure fair from april 7 to may 20, 2012. Date: March 29, 2012 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290011 | |||||
SCORE 87 Electrical for renaissance fair booth #f7. Date: March 29, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290023 | |||||
SCORE 74 Electrical for temp booth for renaissance faire #f10. Date: March 29, 2012 Contractor: William Ellwanger Construction Applicant: Ellwanger William | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290045 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290050 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire f8. 5 Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290053 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f9. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290057 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8a Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290058 | |||||
SCORE 100 Electrical for temp trailer booth for renaissance faire #f11 Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290061 | |||||
SCORE 100 Electrical for temp booth for renaissance faire f12 & f13 Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290065 | |||||
SCORE 86 Misc conduit 30amp for temp hook up for renaissance fair #f2 Date: March 30, 2012 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 30, 2013 | Permit id: 1203300012 | |||||
SCORE 87 Electrical for generator for fair booth #f7. Date: April 2, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020008 | |||||
SCORE 89 Electrcial permit for renaissance fair #310. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020011 | |||||
SCORE 89 Electrical for booth for renaissance fair #f5 and #f6. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020013 | |||||
SCORE 89 Elctrical for booth permit for renaissance fair #f3. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020020 | |||||
SCORE 75 Electrical for booth #312 for renaissance fair. Date: April 3, 2012 Contractor: Target Electric Co Applicant: Tallon Shawn | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 3, 2013 | Permit id: 1204030048 | |||||
SCORE 96 Electrical for booth #310a for renaissance fair. Date: April 3, 2012 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030052 | |||||
SCORE 88 Renaissance pleasure fair from april 7 to may 19, 2013. Date: March 26, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: March 26, 2014 | Permit id: 1303260014 | |||||
SCORE 96 Electrical for booth #310a for renaissance fair. Date: March 27, 2013 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: March 27, 2014 | Permit id: 1303270043 | |||||
SCORE 86 Electrcial permit for renaissance fair #310. Date: March 28, 2013 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280008 | |||||
SCORE 86 Electrical for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280021 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8a Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010046 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010048 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire f8. 5 Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010050 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f9. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010051 | |||||
SCORE 88 Electrical for temporary trailer booth for renaissance faire #500. Date: April 1, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010067 | |||||
SCORE 100 Electrical for temp booth for renaissance faire f12 & f13 Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020013 | |||||
SCORE 100 Electrical for temp trailer booth for renaissance faire #f11 Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020018 | |||||
SCORE 86 Misc conduit amp for temp hookup for renaissance fair#f Date: April 3, 2013 Contractor: Lacerte Construction Co Applicant: Lacerte Jr Richard H | Permit status: Permisud | Expiration date: April 3, 2014 | Permit id: 1304030044 | |||||
SCORE 82 Electrical for booth #212 for renaissance fair. Date: April 4, 2013 Contractor: William F Steimke Applicant: Steimke William F | Permit status: Finaled | Completion date: May 1, 2013 | Expiration date: April 4, 2014 | Permit id: 1304040019 | |||||
SCORE 88 Renaissance pleasure fair from april 5 to may 18, 2014. Date: March 25, 2014 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: March 25, 2015 | Permit id: 1403250009 | |||||
SCORE 86 Elctrical for booth permit for renaissance fair #f3. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260003 | |||||
SCORE 86 Electrical for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260021 | |||||
SCORE 86 Electrcial permit for renaissance fair #393. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260028 | |||||
SCORE 86 Electrical for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260030 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8a Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260048 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260050 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire f8. 5 Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260053 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f9. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260054 | |||||
SCORE 82 Electrical for booth #207 for renaissance fair. Date: March 28, 2014 Contractor: William F Steimke Applicant: Steimke William F | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280006 | |||||
SCORE 100 Electrical for temp trailer booth for renaissance faire #f11 Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280013 | |||||
SCORE 100 Electrical for temp booth for renaissance faire f12 & f13 Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280014 | |||||
SCORE 96 Electrical for booth #310a for renaissance fair. Date: April 3, 2014 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030046 | |||||
SCORE 96 Electrical permit for renaissance pleasure faire april 4 to may 17, 2015. Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1503250046 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance fair #f8. Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310007 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire f8. 5 Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310008 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance fair #f9. Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310009 | |||||
SCORE 86 Electrical for booth for renaissance fair #f5 and #f6. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010008 | |||||
SCORE 86 Electrical for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010009 | |||||
SCORE 86 Elctrical for booth permit for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010062 | |||||
SCORE 86 Electrcial for renaissance booth fair #318. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020009 | |||||
SCORE 68 Electrical for renaissance fair booth #403. Date: April 3, 2015 Contractor: Chaidez Construction Applicant: Chaidez Cesar | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020025 | |||||
SCORE 100 Electrical for temp booth for renaissance fair f12 & f13 Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030019 | |||||
SCORE 100 Electrical for temp trailer booth for renaissance faire #f3 Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030023 | |||||
SCORE 99 Mechanical for 2 range hoods for #f3. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Permisud | Expiration date: September 27, 2008 | Permit id: 803310004 | |||||
SCORE 99 Mechanical for 1 range hood for #f2. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310006 | |||||
SCORE 99 Mechanical for 3 range hoods for renaissance fair #f11 and #f12. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310007 | |||||
SCORE 99 Mechanical for 3 commercial hoods for renaissance for #f10. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310013 | |||||
SCORE 79 Mechanical for hood for renaissance #f7. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120013 | |||||
SCORE 91 Mechanical for renaissance fair #f8. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120014 | |||||
SCORE 91 Mechanical for renaissance fair #f9. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120015 | |||||
SCORE 100 Mechanical for renaissance fair #f12 and #f13. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Expiration date: September 16, 2009 | Permit id: 903200003 | |||||
SCORE 89 Mechanical for renaissance fair #f5 and #f6. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230007 | |||||
SCORE 89 Mechanical for renaissance fair #f3. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230010 | |||||
SCORE 79 Mechanical permit for renaissance fair #f4. Date: March 30, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 1, 2009 | Expiration date: September 26, 2009 | Permit id: 903300017 | |||||
SCORE 89 Mechanical for renaissance fair #f3. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250019 | |||||
SCORE 96 Space #f8-mech for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280026 | |||||
SCORE 96 Space #f9-mech for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280027 | |||||
SCORE 87 Mechanical for hood for renaissance #f7. Date: March 29, 2011 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: March 28, 2012 | Permit id: 1103290009 | |||||
SCORE 89 Mechanical for renaissance fair #f3. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310005 | |||||
SCORE 89 Mechanical for renaissance fair #f5 and #f6. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310007 | |||||
SCORE 89 Mechanical for renaissance fair #379. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1104040004 | |||||
SCORE 100 Mechanical permit for renaissance fair #f11. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Expiration date: April 5, 2012 | Permit id: 1104060024 | |||||
SCORE 87 Mechanical for renaissance fair booth #f7. Date: March 29, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290004 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire f8. 5 Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290016 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire #f8a Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290020 | |||||
SCORE 100 Mechanical for temp trailer booth for renaissance faire #f11 Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290023 | |||||
SCORE 100 Mechanical for temp booth for renaissance faire #f12 & f13 Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290025 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f5 and #f6. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020005 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f3. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020006 | |||||
SCORE 86 Mechanical for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280015 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire #f8a Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010014 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire f8. 5 Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010016 | |||||
SCORE 88 Mechanical for temporary trailer booth for renaissane faire #500. Date: April 1, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010024 | |||||
SCORE 100 Mechanical for temp booth for renaissance faire #f12 & f13 Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020006 | |||||
SCORE 100 Mechanical for temp trailer booth for renaissance faire #f11 Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020009 | |||||
SCORE 86 Mechanical for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260016 | |||||
SCORE 86 Mechanical for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260020 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire #f8a Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260029 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire f8. 5 Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260033 | |||||
SCORE 100 Mechanical for temp trailer booth for renaissance faire #f11 Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280006 | |||||
SCORE 100 Mechanical for temp booth for renaissance faire #f12 & f13 Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280007 | |||||
SCORE 86 Mechanical for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010004 | |||||
SCORE 86 Mechanical for booth for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers Joseph | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010031 | |||||
SCORE 86 Mechanical for renaissance fair #318. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020006 | |||||
SCORE 100 Mechanical for temp booth for renaissance fair #f12 & f13 Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030010 | |||||
SCORE 96 Renaissance pleasure fair from april 5th to may 18th. Date: March 21, 2008 Contractor: Renaissance Pleasure Fair Applicant: Stehl Lisa | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 17, 2008 | Permit id: 803210001 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam may 27 - june 12, 2008. Event day june 7, 2008. Date: April 28, 2008 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: October 25, 2008 | Permit id: 804280001 | |||||
SCORE 96 Renaissance pleasure fair from april 4 to may 17, 2009. Date: March 31, 2009 Contractor: Renaissance Pleasure Fair Applicant: Shultz Sandy | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310001 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam june 13,2009. Date: May 26, 2009 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: November 22, 2009 | Permit id: 905260002 | |||||
SCORE 96 Renaissance pleasure fair from april to may 23, 2010. Date: March 23, 2010 Contractor: Renaissance Pleasure Fair Applicant: Shultz Sandy | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: September 19, 2010 | Permit id: 1003230003 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam june 12,20 Date: May 5, 2010 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: November 1, 2010 | Permit id: 1005050002 | |||||
SCORE 96 Renaissance pleasure fair from april 9 to may 22, 2011. Date: March 24, 2011 Contractor: Renaissance Pleasure Fair Applicant: Shultz Sandy | Permit status: Permisud | Expiration date: September 20, 2011 | Permit id: 1103240001 | |||||
SCORE 86 Self contained trailer for cooking for renaissance fair #f2. Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 29, 2011 | Expiration date: September 24, 2011 | Permit id: 1103280002 | |||||
SCORE 96 Space #f9-temp trailer for renaissance faire Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: September 24, 2011 | Permit id: 1103280006 | |||||
SCORE 87 Temporary booth for renaissance fair #f7. Applicant: Weber Christopher | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: September 25, 2011 | Permit id: 1103290001 | |||||
SCORE 69 Temporary booth for renaissance fair #312. Applicant: G J Construction Co | Permit status: Permisud | Expiration date: September 27, 2011 | Permit id: 1103310002 | |||||
SCORE 89 Temporary permit for renaissance fair #f5 and #f6. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: October 1, 2011 | Permit id: 1103310003 | |||||
SCORE 89 Temporary booth for renaissance fair #379. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: October 1, 2011 | Permit id: 1104040005 | |||||
SCORE 79 Space f - temp booth for renaissance faire Applicant: Arthur Kenneth | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: October 1, 2011 | Permit id: 1104040006 | |||||
SCORE 100 Temporary booth for renaissance fair #385. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: October 3, 2011 | Permit id: 1104060010 | |||||
SCORE 100 Temporary booth for renaissance fair #f12 and f13. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: October 3, 2011 | Permit id: 1104060011 | |||||
SCORE 100 Temporary booth for renaissance fair #f11. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: October 3, 2011 | Permit id: 1104060012 | |||||
SCORE 89 Temporary booth for renaissance fair #427. Applicant: John Joseph Mooers Construction | Permit status: Permisud | Expiration date: October 5, 2011 | Permit id: 1104080002 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam from 5-23-11 to 6-14-11 Date: April 11, 2011 Contractor: Southern California Edison Applicant: Hartman Gary | Permit status: Permisud | Expiration date: October 8, 2011 | Permit id: 1104110001 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam june 9, 2012. Date: May 3, 2012 Contractor: Southern California Edison Applicant: Ruiz Reyes | Permit status: Permisud | Expiration date: October 30, 2012 | Permit id: 1104110002 | |||||
SCORE 87 Temporary booth for renaissance fair #f7. Date: March 29, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290005 | |||||
SCORE 74 Temporary booth for renaissance faire #f Date: March 29, 2012 Contractor: William Ellwanger Construction Applicant: Ellwanger William | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290008 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8a. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290012 | |||||
SCORE 100 Temporary trailer booth for renaissance faire #f12 & f13. Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290014 | |||||
SCORE 86 Self contained trailer for cooking for renaissance fair #f2. Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 26, 2012 | Permit id: 1203300003 | |||||
SCORE 89 Temporary booth for renaissance fair #310. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 29, 2012 | Permit id: 1204020001 | |||||
SCORE 89 Temporary booth or renaissance fair #f5 and #f6. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 29, 2012 | Permit id: 1204020002 | |||||
SCORE 89 Temporary booth permit for renaissance fair #f3. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 29, 2012 | Permit id: 1204020003 | |||||
SCORE 75 Temporary booth permit for renaissance fair #312. Applicant: Tallon Shawn | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 30, 2012 | Permit id: 1204030001 | |||||
SCORE 96 Temporary booth permit for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: September 30, 2012 | Permit id: 1204030002 | |||||
SCORE 88 Renaissance pleasure fair from april 6 to may 19, 2013. Date: March 26, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: September 22, 2013 | Permit id: 1303260001 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8a. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 28, 2013 | Permit id: 1304010001 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 28, 2013 | Permit id: 1304010002 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f9. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 28, 2013 | Permit id: 1304010006 | |||||
SCORE 88 Temporary trailer booth for renaissance faire #500. Applicant: Santana Edwin | Permit status: Permisud | Expiration date: September 28, 2013 | Permit id: 1304010007 | |||||
SCORE 100 Temporary trailer booth for renaissance faire #f12 & f13. Applicant: Jayne Justin | Permit status: Permisud | Expiration date: September 29, 2013 | Permit id: 1304020002 | |||||
SCORE 86 Self contained trailer for cooking, for renaissance fair#f Applicant: Lacerte Jr Richard H | Permit status: Permisud | Expiration date: September 30, 2013 | Permit id: 1304030005 | |||||
SCORE 82 Temporary booth permit for renaissance fair #212. Applicant: Steimke William F | Permit status: Finaled | Completion date: May 1, 2013 | Expiration date: October 1, 2013 | Permit id: 1304040003 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam june 8, 2013. Date: May 14, 2013 Contractor: Southern California Edison Applicant: Moreno Leah | Permit status: Permisud | Expiration date: November 10, 2013 | Permit id: 1305140002 | |||||
SCORE 86 Temporary booth for renaissance fair #393. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 29, 2014 | Permit id: 1403260005 | |||||
SCORE 86 Temporary booth or renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 29, 2014 | Permit id: 1403260006 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8a. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 22, 2014 | Permit id: 1403260008 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 22, 2014 | Permit id: 1403260009 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8. 5. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 22, 2014 | Permit id: 1403260010 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f9. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: September 22, 2014 | Permit id: 1403260012 | |||||
SCORE 82 Temporary booth permit for renaissance fair #207. Applicant: Steimke William F | Permit status: Permisud | Expiration date: September 24, 2014 | Permit id: 1403280001 | |||||
SCORE 100 Temporary trailer booth for renaissance faire #f11. Applicant: Jayne Justin | Permit status: Permisud | Expiration date: September 24, 2014 | Permit id: 1403280004 | |||||
SCORE 100 Temporary trailer booth for renaissance faire #f12 & f13. Applicant: Jayne Justin | Permit status: Permisud | Expiration date: September 24, 2014 | Permit id: 1403280005 | |||||
SCORE 96 Temporary booth permit for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: September 30, 2014 | Permit id: 1404030001 | |||||
SCORE 100 Sce company picnic and linemans rodeo at santa fe dam june 7, 2014. Date: April 3, 2014 Contractor: Southern California Edison Applicant: Moreno Leah | Permit status: Permisud | Expiration date: September 30, 2014 | Permit id: 1404030004 | |||||
SCORE 86 Temporary booth for renaissance fair #318. Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: September 30, 2015 | Permit id: 1504020001 | |||||
SCORE 68 Temporary booth permit for renaissance fair #403. Applicant: Chaidez Cesar | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: September 30, 2015 | Permit id: 1504020002 | |||||
SCORE 96 Renaissance pleasure faire from april 4 to may 17, 2015. Applicant: Sibole Brad | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: September 30, 2015 | Permit id: 1504020004 | |||||
SCORE 100 Temporary trailer booth for renaissance faire #f3. Applicant: Jayne Justin | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: September 30, 2015 | Permit id: 1504030004 | |||||
SCORE 93 Plumbing for renaissance fair. Date: March 21, 2008 Contractor: Schultz Controls Applicant: Schultz Controls | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 17, 2008 | Permit id: 803210002 | |||||
SCORE 99 Plumbing for renaissance fair for #f6. Date: March 25, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 21, 2008 | Permit id: 803250008 | |||||
SCORE 99 Plumbing for renaissance fair for #f9. Date: March 26, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 22, 2008 | Permit id: 803260027 | |||||
SCORE 93 1 interceptor, sinks & 22 greywater systems for the renaissance entertainment fair. Date: March 27, 2008 Contractor: Schultz Controls Applicant: Schultz Controls | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270003 | |||||
SCORE 99 2 sinks, 1 water heater & 2 gas lines for renaissance fair #f4 & #f5. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270032 | |||||
SCORE 99 Plumbing for 2 sinks and 1 water heater for #f2. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270033 | |||||
SCORE 99 2 sinks, 1 water heater & 1 gas regulator for renaissance fair #f3. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270034 | |||||
SCORE 99 2 sinks & 1 water heater for renaissance fair #f11 & #f12. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270039 | |||||
SCORE 99 Plumbing for renaissance fair #f10. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310010 | |||||
SCORE 99 Plumbing for 2 sinks and 1 water heater for #f1. Date: April 3, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 30, 2008 | Permit id: 804030021 | |||||
SCORE 79 Plumbing for renaissance fair #f7. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: September 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120018 | |||||
SCORE 79 Plumbing for renaissance fair #f4. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120019 | |||||
SCORE 91 Plumbing for renaissance fair #f8. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120021 | |||||
SCORE 91 Plumbing for renaissance fair #f9. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120024 | |||||
SCORE 100 Plumbing for renaissance fair #f11. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Expiration date: September 16, 2009 | Permit id: 903200004 | |||||
SCORE 100 Plumbing for renaissance fair #f12 and #f13 and sewer ejector pump. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Expiration date: September 16, 2009 | Permit id: 903200005 | |||||
SCORE 89 Plumbing for renaissance fair #f5 and #f6. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230014 | |||||
SCORE 89 Plumbing for renaissance fair #f3. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230015 | |||||
SCORE 74 Plumbing permit for renaissance fair #f10. Date: March 30, 2009 Contractor: Mc Rae Construction Applicant: Mc Rae Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 26, 2009 | Permit id: 903300006 | |||||
SCORE 100 Plumbing permit for renaissance fair #385. Date: March 31, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310007 | |||||
SCORE 93 Plumbing for renaissance pleasure fair. Date: March 31, 2009 Contractor: Schultz Controls Applicant: Shultz Controls | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310024 | |||||
SCORE 89 Plumbing permit for renaissance fair #385. Date: April 2, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 29, 2009 | Permit id: 904020004 | |||||
SCORE 93 Plumbing for renaissance pleasure fair. Date: March 23, 2010 Contractor: Schultz Controls Applicant: Shultz Controls | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 23, 2011 | Permit id: 1003230022 | |||||
SCORE 100 Plumbing permit for renaissance fair #385. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250006 | |||||
SCORE 89 Plumbing for renaissance fair #f5 and #f6. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250026 | |||||
SCORE 74 Plumbing permit for renaissance fair #f10. Date: April 1, 2010 Contractor: Disciple Construction Applicant: Disciple Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: April 1, 2011 | Permit id: 1004010004 | |||||
SCORE 93 Plumbing for renaissance pleasure fair. Date: March 24, 2011 Contractor: Schultz Controls Applicant: Shultz Controls | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 23, 2012 | Permit id: 1103240035 | |||||
SCORE 86 Temporary water line hook up for renaissance fair #f2. Date: March 28, 2011 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 29, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280012 | |||||
SCORE 96 Space #f8-plmg for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280034 | |||||
SCORE 87 Plumbing for renaissance fair #f7. Date: March 29, 2011 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: March 28, 2012 | Permit id: 1103290013 | |||||
SCORE 69 Plumbing for booth #312 for renaissance fair. Date: March 31, 2011 Contractor: G J Construction Co Applicant: G J Construction Co | Permit status: Permisud | Expiration date: March 30, 2012 | Permit id: 1103310005 | |||||
SCORE 89 Plumbing for renaissance fair #f3. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310006 | |||||
SCORE 89 Plumbing for renaissance fair #f5 and #f6. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310009 | |||||
SCORE 79 Space f - plmg for temp booth for renaissance faire Date: April 4, 2011 Contractor: Arthur Construction Applicant: Arthur Kenneth | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: April 3, 2012 | Permit id: 1104040024 | |||||
SCORE 100 Plumbing permit for renaissance fair #385. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060015 | |||||
SCORE 100 Plumbing permit for renaissance fair #f12 and f13. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060018 | |||||
SCORE 88 Plumbing for renaissance pleasure fair from april 7 to may 20, 2012. Date: March 29, 2012 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290005 | |||||
SCORE 87 Plumbing for reanaissance fair booth #f7. Date: March 29, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290014 | |||||
SCORE 74 Plumbing for temp. Booth for renaissance faire #f10. Date: March 29, 2012 Contractor: William Ellwanger Construction Applicant: Ellwanger William | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290031 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8 Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290033 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. 5. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290035 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f9. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290038 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8a. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290039 | |||||
SCORE 100 Plumbing for temp trailer booth for renaissance faire #f11. Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290043 | |||||
SCORE 100 Plumbing for temp booth for renaissance faire #f12 & f13. Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290046 | |||||
SCORE 86 Temporary water line hook up for for renaissance fair #f2. Date: March 30, 2012 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 30, 2013 | Permit id: 1203300007 | |||||
SCORE 75 Plumbing for booth #312 for renaissance fair. Date: April 3, 2012 Contractor: Target Electric Co Applicant: Tallon Shawn | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 3, 2013 | Permit id: 1204030022 | |||||
SCORE 96 Plumbing for booth #310a for renaissance fair. Date: April 3, 2012 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030024 | |||||
SCORE 88 Plumbing for renaissance pleasure fair from april 6 to may 19, 2013. Date: March 26, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: March 26, 2014 | Permit id: 1303260006 | |||||
SCORE 96 Plumbing for booth #310a for renaissance fair. Date: March 27, 2013 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: March 27, 2014 | Permit id: 1303270034 | |||||
SCORE 86 Plumbing for reanaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280017 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8a. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010026 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8 Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010028 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. 5. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010030 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f9. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010031 | |||||
SCORE 88 Plumbing for temporary trailer booth for renaissance faire #500. Date: April 1, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010039 | |||||
SCORE 100 Plumbing for temp booth for renaissance faire #f12 & f13. Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020010 | |||||
SCORE 100 Plumbing for temp trailer booth for renaissance faire #f11. Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020014 | |||||
SCORE 86 Temporary water line hookup for renaissance fair #f10. Date: April 3, 2013 Contractor: Lacerte Construction Co Applicant: Lacerte Jr Richard H | Permit status: Permisud | Expiration date: April 3, 2014 | Permit id: 1304030032 | |||||
SCORE 82 Plumbing for booth #212 for renaissance fair. Date: April 4, 2013 Contractor: William F Steimke Applicant: Steimke William F | Permit status: Finaled | Completion date: May 1, 2013 | Expiration date: April 4, 2014 | Permit id: 1304040015 | |||||
SCORE 88 Plumbing for renaissance pleasure fair from april 5 to may 18, 2014. Date: March 25, 2014 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: March 25, 2015 | Permit id: 1403250007 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8a. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260032 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8 Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260034 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. 5. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260041 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f9. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260042 | |||||
SCORE 82 Plumbing for booth #207 for renaissance fair. Date: March 28, 2014 Contractor: William F Steimke Applicant: Steimke William F | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280003 | |||||
SCORE 100 Plumbing for temp trailer booth for renaissance faire #f11. Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280011 | |||||
SCORE 100 Plumbing for temp booth for renaissance faire #f12 & f13. Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280012 | |||||
SCORE 86 Plumbing for reanaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1404020011 | |||||
SCORE 96 Plumbing for booth #310a for renaissance fair. Date: April 3, 2014 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030021 | |||||
SCORE 96 Plumbing permit for renaissance faire april 4 to may 17,2015 Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1503250034 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. 5. Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310005 | |||||
SCORE 86 Plumbing for booth permit for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020004 | |||||
SCORE 68 Plumbing for renaissance fair booth #403. Date: April 3, 2015 Contractor: Chaidez Construction Applicant: Chaidez Cesar | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020015 | |||||
SCORE 100 Plumbing for temp trailer booth for renaissance faire #f3. Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030015 | |||||
SCORE 99 Sewer for renaissance fair for #f6. Date: March 25, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 21, 2008 | Permit id: 803250002 | |||||
SCORE 99 Sewer for renaissance fair for #f9. Date: March 26, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: April 4, 2008 | Expiration date: September 22, 2008 | Permit id: 803260008 | |||||
SCORE 91 Sewer for renaissance fair for #f9. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 30, 2009 | Expiration date: September 23, 2008 | Permit id: 803270001 | |||||
SCORE 91 Sewer for renaissance fair f8. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270002 | |||||
SCORE 91 Sewer for renaissance fair #f8. 5. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270003 | |||||
SCORE 99 Sewer for renaissance fair #f4 & #f5. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270009 | |||||
SCORE 99 Sewer for renaissance fair for #f2. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 28, 2009 | Expiration date: September 23, 2008 | Permit id: 803270010 | |||||
SCORE 99 Sewer for renaissance fair #f3. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270011 | |||||
SCORE 99 Sewer for renaissance fair #f11 & #f12. Date: March 27, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270012 | |||||
SCORE 100 Sewer for renaissance fair #f12 and f13. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Consdtruction | Permit status: Permisud | Expiration date: September 16, 2009 | Permit id: 803310004 | |||||
SCORE 99 Sewer for renaissance for for #f1. Date: April 3, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 30, 2008 | Permit id: 804030009 | |||||
SCORE 79 Sewer for renaissance fair #f7. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120005 | |||||
SCORE 79 Sewer for renaissance fair #f4. Date: March 12, 2009 Contractor: William H Gunn Construction Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120006 | |||||
SCORE 91 Sewer for renaissance fair #f8. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120007 | |||||
SCORE 91 Sewer for renaissance fair #f9. Date: March 12, 2009 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 8, 2009 | Permit id: 903120009 | |||||
SCORE 89 Sewer for renaissance fair #f5 and #f6. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230002 | |||||
SCORE 89 Sewer for renaissance fair #f3. Date: March 23, 2009 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230003 | |||||
SCORE 74 Sewer permit for renaissance fair #f10. Date: March 30, 2009 Contractor: Mc Rae Construction Applicant: Mc Rae Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 26, 2009 | Permit id: 903300003 | |||||
SCORE 100 Sewer permit for renaissance fair #385. Date: March 31, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310001 | |||||
SCORE 87 Sewer for renaissance fair #f7 Date: March 24, 2010 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 24, 2011 | Permit id: 1003240007 | |||||
SCORE 100 Sewer for renaissance fair #f11. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250001 | |||||
SCORE 100 Sewer permit for renaissance fair #385. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250002 | |||||
SCORE 89 Sewer for renaissance fair #f3. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250005 | |||||
SCORE 89 Sewer for renaissance fair #f5 and #f6. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250006 | |||||
SCORE 91 Sewer for renaissance fair #f9. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260003 | |||||
SCORE 74 Sewer permit for renaissance fair #f10. Date: April 1, 2010 Contractor: Disciple Construction Applicant: Disciple Cnstruction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: April 1, 2011 | Permit id: 1004010002 | |||||
SCORE 86 Temporary hook up to sewer for renaissance fair #f2. Date: March 28, 2011 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 29, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280001 | |||||
SCORE 96 Space #f8-sewer for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280003 | |||||
SCORE 87 Sewer for renaissance fair #f7 Date: March 29, 2011 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: March 28, 2012 | Permit id: 1103290002 | |||||
SCORE 89 Sewer for renaissance fair #f5 and #f6. Date: April 4, 2011 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310002 | |||||
SCORE 79 Space f - sewer for temp booth for renaissance faire Date: April 4, 2011 Contractor: Arthur Construction Applicant: Arthur Kenneth | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: April 3, 2012 | Permit id: 1104040004 | |||||
SCORE 100 Sewer permit for renaissance fair #385. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060002 | |||||
SCORE 100 Sewer for renaissance fair #f11. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060003 | |||||
SCORE 100 Sewer for renaissance fair #f12 anf #f13. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 6, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060004 | |||||
SCORE 87 Sewer for renaissance fair booth #f7. Date: March 29, 2012 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290002 | |||||
SCORE 74 Sewer for temporary booth for renaissance faire #f Date: March 29, 2012 Contractor: William Ellwanger Construction Applicant: Ellwanger William | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290006 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290007 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f11. Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 29, 2013 | Permit id: 1203290012 | |||||
SCORE 86 Temporary hook up to sewer for renaissance fair #f2. Date: March 30, 2012 Contractor: Lacerte Construction Co Applicant: Lacerte Construction Co | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: March 30, 2013 | Permit id: 1203300002 | |||||
SCORE 89 Sewer for booth for renaissance fair #f5 and #f6. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020009 | |||||
SCORE 96 Sewer for temporary booth for renaissance fair #310a. Date: April 3, 2012 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030009 | |||||
SCORE 86 Sewer for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280007 | |||||
SCORE 91 Sewer for renaissance fair #f8. Date: April 1, 2013 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010006 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. 5. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010007 | |||||
SCORE 96 Sewer for temporary trailer booth for renaissance faire #f9. Date: April 1, 2013 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010008 | |||||
SCORE 88 Sewer for temporary booth for renaissance faire #500. Date: April 1, 2013 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010012 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f11. Date: April 2, 2013 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020004 | |||||
SCORE 86 Temporary sewer hookup for renaissance fair #f10. Date: April 3, 2013 Contractor: Lacerte Construction Co Applicant: Lacerte Jr Richard H | Permit status: Permisud | Expiration date: April 3, 2014 | Permit id: 1304030006 | |||||
SCORE 88 Connect to public sewer. Date: March 25, 2014 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: March 25, 2015 | Permit id: 1403250012 | |||||
SCORE 86 Sewer for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260007 | |||||
SCORE 86 Sewer for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260008 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8a. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260015 | |||||
SCORE 91 Sewer for renaissance fair #f8. Date: March 26, 2014 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260016 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. 5. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260017 | |||||
SCORE 96 Sewer for temporary trailer booth for renaissance faire #f9. Date: March 26, 2014 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: March 26, 2015 | Permit id: 1403260018 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f11. Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280001 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f12 f13. Date: March 28, 2014 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: March 28, 2015 | Permit id: 1403280003 | |||||
SCORE 96 Sewer for temporary booth for renaissance fair #310a. Date: April 3, 2014 Contractor: Calasia Construction Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030006 | |||||
SCORE 86 Sewer for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010012 | |||||
SCORE 86 Sewer for booth for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020003 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance fair #f12 f13. Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030002 | |||||
SCORE 89 Building permit for renaissance fair #f3. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230029 | |||||
SCORE 89 Building permit for renaissance fair #f5,#f6. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230032 | |||||
SCORE 91 Building permit for renaissance fair #f8. Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 19, 2009 | Permit id: 903230033 | |||||
SCORE 91 Building permit for renaissance fair #f9. Applicant: Wright Ralph | Permit status: Permisud | Expiration date: September 19, 2009 | Permit id: 903230035 | |||||
SCORE 91 Building permit for temporary trailer for renaissance fair #f8. Applicant: Wright Ralph | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 22, 2009 | Permit id: 903260051 | |||||
SCORE 74 Building permit for renaissance fair #f10. Applicant: Mc Rae Construction | Permit status: Permisud | Expiration date: September 26, 2009 | Permit id: 903300038 | |||||
SCORE 79 Building permit for renaissance fair #f7. Applicant: William H Gunn Construction | Permit status: Permisud | Expiration date: September 26, 2009 | Permit id: 903300051 | |||||
SCORE 79 Building permit for renaissance fair #f4. Applicant: William H Gunn Construction | Permit status: Finaled | Completion date: April 1, 2009 | Expiration date: September 26, 2009 | Permit id: 903300052 | |||||
SCORE 100 Building permit for renaissance fair #f11. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310010 | |||||
SCORE 100 Building permit for renaissance fair #f12 and #f13. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310013 | |||||
SCORE 100 Building permit for renaissance fair #385. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310016 | |||||
SCORE 89 Building permit for renaissance fair #383. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310031 | |||||
SCORE 89 Building permit for renaissance fair #245. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 27, 2009 | Permit id: 903310033 | |||||
SCORE 89 Building permit for renaissance fair #385. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 3, 2009 | Expiration date: September 29, 2009 | Permit id: 904020027 | |||||
SCORE 87 Building permit for renaissance fair #f7. Applicant: Weber Christopher | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 24, 2011 | Permit id: 1003240045 | |||||
SCORE 100 Building permit for renaissance fair #f11. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250018 | |||||
SCORE 100 Building permit for renaissance fair #385. Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250024 | |||||
SCORE 89 Building permit for renaissance fair #f3. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250063 | |||||
SCORE 89 Building permit for renaissance fair #427. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250066 | |||||
SCORE 89 Building permit for renaissance fair #f5,#f6. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250067 | |||||
SCORE 91 Building permit for renaissance fair #f9. Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260015 | |||||
SCORE 91 Building permit for renaissance fair #f8. Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260020 | |||||
SCORE 74 Building permit for renaissance fair #f10. Applicant: Disciple Construction & Electrical | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: April 1, 2011 | Permit id: 1004010029 | |||||
SCORE 89 Building permit for renaissance fair #379. Applicant: John Joseph Mooers Construction | Permit status: Permisud | Completion date: October 5, 2010 | Expiration date: April 6, 2011 | Permit id: 1004060025 | |||||
SCORE 66 Addition of office to existing restroom. Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Permisud | Expiration date: September 11, 2000 | Permit id: 9903170038 | |||||
SCORE 95 Boat house addition of outlets, fixtures, equipment, fan transformers, 1 amp panel, 225 amp panel Date: March 20, 2000 Contractor: Pima Corp Dba Advanced Construction Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Permisud | Expiration date: September 16, 2000 | Permit id: 3200044 | |||||
SCORE 95 Comfort room addition. Refrig compressors, fan coil, fan Date: March 20, 2000 Contractor: Pima Corp Dba Advanced Construction Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Permisud | Expiration date: September 16, 2000 | Permit id: 3200019 | |||||
SCORE 95 Comfort room addition fixtures. Date: March 20, 2000 Contractor: Pima Corp Dba Advanced Construction Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Permisud | Expiration date: September 16, 2000 | Permit id: 3200048 | |||||
SCORE 95 Addition of fixtures for boat house. Date: March 20, 2000 Contractor: Pima Corp Dba Advanced Construction Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Permisud | Expiration date: September 16, 2000 | Permit id: 3200049 | |||||
SCORE 66 A brand new boathouse. Engineer: James D. Black Associates | Applicant: County Of Los Angels Parks/rec | Permit status: Finaled | Completion date: November 6, 2001 | Expiration date: December 24, 2000 | Permit id: 3150028 | |||||
SCORE 93 Plumbing for fair from april 7 thru june 2007 @ santa fe dam Date: April 6, 2007 Contractor: Schultz Controls Applicant: Hackman Dwight | Permit status: Permisud | Expiration date: October 3, 2007 | Permit id: 704060003 | |||||
SCORE 86 Mechanical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010003 | |||||
SCORE 86 Mechanical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280002 | |||||
SCORE 86 Electrical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 24, 2013 | Permit id: 1303280004 | |||||
SCORE 86 Sewer for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Completion date: April 17, 2015 | Expiration date: September 30, 2015 | Permit id: 1504010002 | |||||
SCORE 86 Temporary booth permit for renaissance fair #f2. Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: September 30, 2015 | Permit id: 1504010005 | |||||
SCORE 96 Sewer for temporary booth for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: September 23, 2013 | Permit id: 1303270003 | |||||
SCORE 86 Plumbing for booth permit for renaissance fair #f3. Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260002 | |||||
SCORE 86 Temporary booth permit for renaissance fair #f3. Applicant: Mooers Joseph | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260001 | |||||
SCORE 91 Building permit for temporary trailer for renaissance fair #f8 1 2. Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260017 | |||||
SCORE 86 Electrical for booth #310a for renaissance fair. Date: April 3, 2012 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030052 | |||||
SCORE 86 Electrical for booth #310a for renaissance fair. Date: March 27, 2013 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: March 27, 2014 | Permit id: 1303270043 | |||||
SCORE 89 Electrcial permit for renaissance fair #310. Date: March 28, 2013 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280008 | |||||
SCORE 89 Electrical for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280021 | |||||
SCORE 89 Elctrical for booth permit for renaissance fair #f3. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260003 | |||||
SCORE 89 Electrical for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260021 | |||||
SCORE 89 Electrcial permit for renaissance fair #393. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260028 | |||||
SCORE 89 Electrical for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260030 | |||||
SCORE 86 Electrical for booth #310a for renaissance fair. Date: April 3, 2014 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030046 | |||||
SCORE 89 Electrical for booth for renaissance fair #f5 and #f6. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010008 | |||||
SCORE 89 Electrical for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010009 | |||||
SCORE 89 Elctrical for booth permit for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010062 | |||||
SCORE 89 Electrcial for renaissance booth fair #318. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020009 | |||||
SCORE 89 Mechanical for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280015 | |||||
SCORE 89 Mechanical for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260016 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260020 | |||||
SCORE 89 Mechanical for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010004 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers Joseph | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010031 | |||||
SCORE 89 Mechanical for renaissance fair #318. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020006 | |||||
SCORE 86 Temporary booth permit for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: September 30, 2012 | Permit id: 1204030002 | |||||
SCORE 89 Temporary booth for renaissance fair #393. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 29, 2014 | Permit id: 1403260005 | |||||
SCORE 89 Temporary booth or renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: September 29, 2014 | Permit id: 1403260006 | |||||
SCORE 86 Temporary booth permit for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: September 30, 2014 | Permit id: 1404030001 | |||||
SCORE 89 Temporary booth for renaissance fair #318. Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: September 30, 2015 | Permit id: 1504020001 | |||||
SCORE 86 Plumbing for booth #310a for renaissance fair. Date: April 3, 2012 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030024 | |||||
SCORE 86 Plumbing for booth #310a for renaissance fair. Date: March 27, 2013 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: March 27, 2014 | Permit id: 1303270034 | |||||
SCORE 89 Plumbing for reanaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280017 | |||||
SCORE 89 Plumbing for reanaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1404020011 | |||||
SCORE 86 Plumbing for booth #310a for renaissance fair. Date: April 3, 2014 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030021 | |||||
SCORE 89 Plumbing for booth permit for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020004 | |||||
SCORE 86 Sewer for temporary booth for renaissance fair #310a. Date: April 3, 2012 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2013 | Permit id: 1204030009 | |||||
SCORE 89 Sewer for renaissance fair booth #f7. Date: March 28, 2013 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280007 | |||||
SCORE 89 Sewer for renaissance fair booth #f7. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260007 | |||||
SCORE 89 Sewer for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260008 | |||||
SCORE 86 Sewer for temporary booth for renaissance fair #310a. Date: April 3, 2014 Contractor: Calasia Construction, Inc Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: April 3, 2015 | Permit id: 1404030006 | |||||
SCORE 89 Sewer for renaissance fair booth #f7. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010012 | |||||
SCORE 89 Sewer for booth for renaissance fair #f2. Date: April 3, 2015 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Finaled | Completion date: April 24, 2015 | Expiration date: April 2, 2016 | Permit id: 1504020003 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire f8. 5 Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010010 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f8. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010024 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance fair #f8a. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010030 | |||||
SCORE 89 Electrical for temp trailer booth for renaissance faire #322 Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010036 | |||||
SCORE 89 Electrical for temp trailer booth for renaissance faire #f Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010038 | |||||
SCORE 89 Electrical for trailer booth for renaissance fair #f3 & #f4. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010042 | |||||
SCORE 89 Electrical for temp trailer booth for renaissance faire #f5. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010043 | |||||
SCORE 96 Electrical for renaissance pleasure faire from april 9 to may 22, 2016. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604040019 | |||||
SCORE 100 Electrical for temp. Booth for renaissance faire f12 & f13. Date: April 8, 2016 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604040024 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance faire #f9. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010005 | |||||
SCORE 96 Mechanical for temp trailer booth for renaissance faire f8a Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010014 | |||||
SCORE 89 Mechanical for temp trailer booth for renaissance faire #322 Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010017 | |||||
SCORE 89 Mechanical for temp. Trailer booth for renaisance faire #f Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010018 | |||||
SCORE 89 Mechanical for trailer booth for renaissance faire #f3 & #f4 Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010020 | |||||
SCORE 100 Mechanical for temp booth for renaissance faire #f12 & #f13. Date: April 8, 2016 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604040013 | |||||
SCORE 88 Temporary booth permit for renaissance fair #320. Applicant: Santana Edwin | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604010001 | |||||
SCORE 96 Temporary trailer booth for renaissance faire #f8a. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604010008 | |||||
SCORE 89 Temporary trailer booth for renaissance faire #f5. Applicant: Mooers Joe | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604010014 | |||||
SCORE 96 Renaissance pleasure faire from april 9 to may 22, 2016. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604040003 | |||||
SCORE 100 Temporary trailer booth for renaissance fair #f12 & f13. Applicant: Jayne Justin | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604040004 | |||||
SCORE 89 Temporary trailer booth for renaissance faire #520. Applicant: Mooers Joe | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604080002 | |||||
SCORE 88 Electrical for renaissance fair booth #320. Date: April 7, 2016 Contractor: Edwin Santana Jr Applicant: Santana Edwin | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010002 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f9. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604010003 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. 5. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604010007 | |||||
SCORE 96 Plumbing for temp trailer booth for renaissance faire #f8. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010015 | |||||
SCORE 96 Plumbing for temp trailer booth for rennaissance faire #f8a. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010019 | |||||
SCORE 89 Plumbing for temp trailer booth for renaissance faire #f10. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010021 | |||||
SCORE 89 Plumbing for trailer booth for renaissance faire #f3 & #f4. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010023 | |||||
SCORE 89 Plumbing for temp trailer booth for renaissance faire #f5. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604010024 | |||||
SCORE 96 Plumbing permit for renaissance pleasure faire april 9, to may 22, 2016. Installation of temporary 2" water and sewer. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604040017 | |||||
SCORE 100 Plumbing for temp booth for renaissance faire #f12 and #f13. Date: April 8, 2016 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604040020 | |||||
SCORE 89 Electrical for temp trailer booth for renaissance faire #f2. Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604070001 | |||||
SCORE 89 Plumbing for temp. Trailer booth for renaissance faire Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604080005 | |||||
SCORE 96 Sewer for temporary trailer booth for renaissance faire #f9. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010001 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. 5. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: October 4, 2016 | Permit id: 1604010002 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010004 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8a. Date: April 7, 2016 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 7, 2017 | Permit id: 1604010009 | |||||
SCORE 89 Sewer for temp trailer booth for renaissance fair #f10. Applicant: Mooers John | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604010010 | |||||
SCORE 89 Sewer for temp trailer booth for renaissance faire #f3 & #f4 Applicant: Mooers John | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604010012 | |||||
SCORE 89 Temporary trailer booth for renaissance faire #f3 & #f4. Applicant: Mooers John | Permit status: Permisud | Expiration date: October 5, 2016 | Permit id: 1604010013 | |||||
SCORE 89 Sewer for temp trailer booth for renaissance faire #f12,#f13 Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604040004 | |||||
SCORE 89 Sewer for temp trailer booth for renaissance faire #f2. Date: April 8, 2016 Contractor: Future Construction Group, Inc Applicant: Mooers Joe | Permit status: Permisud | Expiration date: April 8, 2017 | Permit id: 1604070002 | |||||
SCORE 99 Mechanical for 1 range hood for renaissance for #f6. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310009 | |||||
SCORE 100 Plumbing for renaissance fair #f12 and #f13 and sewer ejector pump. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250005 | |||||
SCORE 96 Space #f9-plmg for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280036 | |||||
SCORE 91 4 sinks,1 water heater, 9 gas outlets & water line for renaissance fair #f8. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270006 | |||||
SCORE 89 Plumbing for booth for renaissance fair #f5 and #f6. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020008 | |||||
SCORE 89 Temporary booth permit for renaissance fair #f3. Applicant: Mooers Joseph | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260001 | |||||
SCORE 89 Plumbing for booth for renaissance fair #f5 and #f6. Date: April 2, 2014 Contractor: Future Construction Group, Inc Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260019 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8. 5. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290009 | |||||
SCORE 96 Sewer for temporary trailer booth for renaissance faire #f9. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Permisud | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290010 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8a. Date: March 29, 2012 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: March 29, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290011 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f12 f13. Date: March 29, 2012 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: September 25, 2012 | Permit id: 1203290013 | |||||
SCORE 91 2 kitchen exhaust hoods for renaissance fair #f9. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270004 | |||||
SCORE 91 3 exhaust fans & 1 generator for renaissance fair #f9. Date: March 27, 2008 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 23, 2008 | Permit id: 803270007 | |||||
SCORE 99 Mechanical for renaissance fair #f4 & #f5. Date: March 31, 2008 Contractor: Armstrong Construction Applicant: Armstrong Construction | Permit status: Finaled | Completion date: January 26, 2009 | Expiration date: September 27, 2008 | Permit id: 803310005 | |||||
SCORE 87 Mechanical for hood for renaissance #f7. Date: March 24, 2010 Contractor: Christopher Weber Applicant: Weber Christopher | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 24, 2011 | Permit id: 1003240010 | |||||
SCORE 100 Mechanical for renaissance fair #f11. Date: March 25, 2010 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250004 | |||||
SCORE 89 Mechanical for renaissance fair #f5 and #f6. Date: March 25, 2010 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 25, 2011 | Permit id: 1003250022 | |||||
SCORE 91 Sewer for renaissance fair #f8 1 2. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260004 | |||||
SCORE 91 Mechanical for renaissance fair #f8. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260006 | |||||
SCORE 96 Space #f8 1/2 -plmg for temp trailer for renaissance faire Date: March 28, 2011 Contractor: Sibole Construction Applicant: Willows Fare Inc | Permit status: Permisud | Expiration date: March 27, 2012 | Permit id: 1103280035 | |||||
SCORE 100 Mechanical permit for renaissance fair #f12 and f13. Date: April 6, 2011 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Finaled | Completion date: April 7, 2011 | Expiration date: April 5, 2012 | Permit id: 1104060019 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280002 | |||||
SCORE 89 Electrical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280004 | |||||
SCORE 96 Electrical for temp trailer booth for renaissance fair #f8a Date: April 3, 2015 Contractor: Sibole Construction Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310006 | |||||
SCORE 89 Mechanical for booth for renaissance fair #f5 and #f6. Applicant: Mooers John | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010003 | |||||
SCORE 89 Temporary booth permit for renaissance fair #f2. Applicant: Mooers John | Permit status: Finaled | Completion date: May 1, 2015 | Expiration date: April 2, 2016 | Permit id: 1504010005 | |||||
SCORE 100 Mechanical for temp trailer booth for renaissance faire #f3 Date: April 3, 2015 Contractor: J C Carpentry And Construction Applicant: Jayne Justin | Permit status: Finaled | Completion date: April 17, 2015 | Expiration date: April 2, 2016 | Permit id: 1504030013 | |||||
SCORE 100 Electrical for renaissance fair #f11. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Completion date: April 3, 2009 | Expiration date: September 16, 2009 | Permit id: 903200001 | |||||
SCORE 100 Electrical for renaissance fair #f12 and f13. Date: March 20, 2009 Contractor: J C Carpentry And Construction Applicant: J C Carpentry & Construction | Permit status: Permisud | Completion date: April 3, 2009 | Expiration date: September 16, 2009 | Permit id: 903200002 | |||||
SCORE 91 Water line for renaissance fair #f8 1/2. Date: March 26, 2010 Contractor: Ralph Wright Applicant: Wright Ralph | Permit status: Finaled | Completion date: October 5, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260005 | |||||
SCORE 96 Space #f8 1 2 -sewer for temp trailer for renaissance faire Applicant: Willows Fare Inc | Permit status: Finaled | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280004 | |||||
SCORE 96 Space #f9-sewer for temp trailer for renaissance faire Applicant: Willows Fare Inc | Permit status: Permisud | Completion date: April 5, 2011 | Expiration date: March 27, 2012 | Permit id: 1103280005 | |||||
SCORE 89 Temporary booth permit for renaissance fair #f3. Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: April 8, 2011 | Expiration date: April 3, 2012 | Permit id: 1103310001 | |||||
SCORE 89 Plumbing for booth permit for renaissance fair #f3. Date: April 2, 2012 Contractor: John Joseph Mooers Construction Applicant: John Joseph Mooers Construction | Permit status: Finaled | Completion date: March 27, 2013 | Expiration date: April 2, 2013 | Permit id: 1204020010 | |||||
SCORE 86 Sewer for temporary booth for renaissance fair #310a. Applicant: Fernandez Diego | Permit status: Permisud | Expiration date: March 27, 2014 | Permit id: 1303270003 | |||||
SCORE 89 Temporary booth permit for renaissance fair #f3. Applicant: Mooers Joseph | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280001 | |||||
SCORE 89 Elctrical for booth permit for renaissance fair #f3. Applicant: Mooers John | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303280003 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance faire #f8a. Applicant: Sibole Brad | Permit status: Permisud | Expiration date: April 1, 2014 | Permit id: 1304010004 | |||||
SCORE 100 Sewer for temp trailer booth for renaissance faire #f12 f13. Applicant: Jayne Justin | Permit status: Permisud | Expiration date: April 2, 2014 | Permit id: 1304020003 | |||||
SCORE 89 Plumbing for booth permit for renaissance fair #f3. Applicant: Mooers John | Permit status: Permisud | Expiration date: April 2, 2015 | Permit id: 1403260002 | |||||
SCORE 96 Sewer for temp trailer booth for renaissance fair #f8a. Applicant: Sibole Brad | Permit status: Finaled | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Permit id: 1503310001 |