Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: July 10, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 548443 | |||||
Mechanical permit Date: July 17, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 550074 | |||||
Electrical permit Date: July 1, 2014 Client: Palumbo Erika | Permit status: Expired | Permit id: 546476 | |||||
Alteration permit Date: June 10, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 542050 | |||||
Plumbing permit Date: July 10, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 548443 | |||||
Mechanical permit Date: July 17, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 550074 | |||||
Electrical permit Date: July 1, 2014 Client: Palumbo Erika | Permit status: Expired | Permit id: 546476 | |||||
Alteration permit Date: June 10, 2014 Client: Palumbo Erika | Permit status: Completed | Permit id: 542050 | |||||
SCORE 89 Installation of (1) heat pump system (including ductwork associated accessories). Sfd Date: July 17, 2014 Contractor: Lcd Heating And Air Conditioning Client: Palumbo Erika | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 11, 2014 | Permit id: 550074 | |||||
SCORE 99 Rough in of 6 fixtures 2 wc,2 vanity,1 tub and 1 kitchen sink (sfd) Date: July 10, 2014 Contractor: David Smith Client: Palumbo Erika | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 12, 2014 | Permit id: 548443 | |||||
SCORE 100 Install 100a service complete with circuit panel, re-wire single family building. Work in accordance with 2008 nec Date: July 1, 2014 Contractor: Lectron Electric Client: Palumbo Erika | Permit type: Electrical permit | Permit status: Expired | Completion date: July 1, 2014 | Permit id: 546476 | |||||
SCORE 100 10 square feet of interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated jan 2011. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electric and hvac. Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting stucco work and at least 24 hours prior to starting interior renovation work. Date: June 10, 2014 Contractor: Wan Yuan Construction Inc Client: Palumbo Erika | Permit type: Alteration permit | Permit status: Completed | Completion date: November 26, 2014 | Permit id: 542050 |