Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
2 amp electrical service upgrade Date: August 9, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: August 15, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 6, 2016 Contractor: T A K Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 18, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 70 2 amp electrical service upgrade Date: August 9, 2013 Contractor: Rory Higgins Electric Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 15, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 59 26 sf re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material composition proposed roofing material composition manufacturer malarkey brand and model ecoasis costa color (if cool roof required) n/a built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) climate zone 7 required building inspector field verification (if applicable) na note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 8, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: July 13, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: August 15, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |