Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: December 28, 2009 Client: Francisville East Lp | Permit status: Completed | Permit id: 244396 | |||||
Zoning use permit Date: July 22, 2009 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 227799 | |||||
Plumbing permit Date: April 9, 2010 Client: Francisville East Lp | Permit status: Completed | Permit id: 269867 | |||||
Zoning permit Date: July 1, 2009 Client: Francisville East Lp | Permit status: Completed | Permit id: 223895 | |||||
Mechanical permit Date: March 8, 2011 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 304401 | |||||
Electrical permit Date: October 18, 2010 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 300571 | |||||
Zoning use permit Date: February 17, 2010 Client: Francisville East Lp | Permit status: Completed | Permit id: 260129 | |||||
Electrical permit Date: February 25, 2011 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 296990 | |||||
Mechanical permit Date: May 10, 2010 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 270963 | |||||
Demolition permit Date: February 17, 2010 Client: Francisville East Lp | Permit status: Completed | Permit id: 260172 | |||||
Suppression permit Date: June 25, 2010 Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 281360 | |||||
Permit for the relocation of lot lines to create six(6) lots from eighteen(18) lots, lots 1 thru 5 for the erection of five attached structures(maximum height nte 35 feet) each with bays, off street parking for one automobile, erection of a three(3) story structure(maximum height nte feet 8 inches) with bays, off street parking for ten(10) automobiles including two(2) handicapped accessible spaces, with garden space, open air seating, a 6feet high 8 feet high fence and a sign, accessory management office, accessory community area for residents only, for use as twenty seven (27) dwelling units. Date: March 24, 2009 Client: Francisville East Lp | Applicant: Michael Floyd, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: June 3, 2009 | Permit id: 8671 | |||||
Erection of a three(3) attached structure(maximum height nte 35 feet) with bays, off street paking for one automobile(size and location as shown on the application)for use as a single family dwelling. Date: July 22, 2009 Client: Francisville East Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 26, 2009 | Permit id: 227794 | |||||
SCORE 100 Install hvac system in single family dwelling Date: May 10, 2010 Contractor: Dwd Mechanical Contractor Inc Client: Francisville East Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 25, 2010 | Permit id: 270951 | |||||
SCORE 89 Fire alarm only new installation Date: February 25, 2011 Contractor: Dunbar Electric Llc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 296990 | |||||
SCORE 89 Installation of a 48. 3kw solar pv system. Date: October 18, 2010 Contractor: Mercury Solar Systems Inc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: January 19, 2011 | Permit id: 300571 | |||||
SCORE 100 Hvac for 27 unit apt bldg Date: March 8, 2011 Contractor: Dwd Mechanical Contractor Inc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 304401 | |||||
For the relocation of lot lines to create 6 lots from 18 existing lots for the development of (5) 3 story sfds, three of which are attached and 2 that are semi detached each lot will have associated pavement walkways, patios and one porous paved, accessory arking space and curb cut, and one underground stormwater management facility each lot will have 18 inch high fencing around a landscape bed in the front of the dwelling along with a 4, 6 and 8 foot high fencing with gates lot 6 will be a 3 story 27 unit apartment bldg. With aaccessory community space and 8 foot high fencing with gates and a management office Date: July 1, 2009 Client: Francisville East Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: July 21, 2009 | Permit id: 200407 | |||||
New construction of a three (3) story structure for use as a single family dwelling. Date: December 28, 2009 Client: Francisville East Lp | Permit type: New construction permit | Permit status: Completed | Completion date: October 22, 2010 | Permit id: 244396 | |||||
Complete demo of existing building Date: February 17, 2010 Client: Francisville East Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 17, 2010 | Permit id: 260129 | |||||
SCORE 100 Complete demo of existing building Date: February 17, 2010 Contractor: Domus Inc Client: Francisville East Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: March 30, 2010 | Permit id: 260172 | |||||
SCORE 100 New construction,single family,11 fixtures with piping Date: April 9, 2010 Contractor: Nagellavin Inc Client: Francisville East Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 12, 2010 | Permit id: 269867 | |||||
SCORE 89 Install 150a service, proper grounding & wire single family dwelling as per 2005 nec. Date: April 30, 2010 Contractor: Dunbar Electric Llc Client: Francisville East Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: October 21, 2010 | Permit id: 276043 | |||||
For the erection of a three(3) story structure(maximum height nte feet 8 inches) with bays, off street parking for ten(10) automobiles including two(2) handicapped accessible spaces, with garden space, open air seating, a 6 feet high 8 feet high fence (size and location as shown on the application)for use as twenty seven(27) dwelling units , accessory management office, accessory community area for residents only Date: July 22, 2009 Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 26, 2009 | Permit id: 227799 | |||||
New construction of a 3-story apartment building with (27) 1-bedroom units. Wood frame constructon, concrete grade slab and helical pile footings. Exterior: brick veneer, stucco and vinyl siding Date: December 30, 2009 Client: Francisville East Lp | Client Company: Community Ventures | Permit type: New construction permit | Permit status: Completed | Completion date: March 10, 2011 | Permit id: 228021 | |||||
SCORE 100 To install sanitary & water for 136 fixtures. 1st floor 2 floor drains, 7 water closets, 7 lavatories, 4 bath tubs, 5 sinks, 1 mop receptor, 2nd floor 11 water closets,11 lavs,11 tubs,11 sinks, 11 lt. 3rd floor 11 wc,11 lav,11 bt, 11 sinks,11 l tubs Date: April 9, 2010 Contractor: Nagellavin Inc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 268987 | |||||
SCORE 100 Install fire suppression system, fdc, fire service line, as per plans Date: June 25, 2010 Contractor: Simplexgrinnell Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Suppression permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 281360 | |||||
SCORE 89 Install power, lighting & switching per plans. Date: July 19, 2010 Contractor: Dunbar Electric Llc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 284768 | |||||
SCORE 100 Site work sewer connection Date: July 2, 2010 Contractor: Nagellavin Inc Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 289082 |