Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount commercial solar pv for comm bldg total system size in kilowatts 136 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 17, 2014 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: March 3, 2015 | Permit id: Pds2014-Comalt- | |||||
SCORE 81 T. I to convert existing 1875 sqft office space to hilton head gym (suite #202) which includes creating 1 sqft bathroom (ada) w 47 lf interior partitions, remove 42 sqft doors, re-wiring for light fixtures, adding new hvac and ductwork. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: November 25, 2015 | Permit id: Pds2015-Comalt- | |||||
32 sq ft tenant improvement from vacant office (never a tenant) to 2 office suites for hope 4 cancer institute consisting of a total of 13 offices, two break rooms, 1 lounge, 2 conference rooms, 2 staff open office areas 248 lf of interior metal stud walls, 2 vestibule. 1 service and one utility room misc epm for plumbing lighting and mechanical distribution.(duct work) Date: August 31, 2016 Value: $171,355 Permit type: Commercial alteration-addn | Permit status: Open | Permit id: Pds2016-Comalt- | |||||
Final Date: November 23, 2015 Permit status: Pass | Permit id: Pds2015-Comalt- |