Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit ![]() Client: Francisville East Lp | Permit status: Completed | Permit id: 244396 | |||||
Zoning use permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 227799 | |||||
Plumbing permit ![]() Client: Francisville East Lp | Permit status: Completed | Permit id: 269867 | |||||
Zoning permit ![]() Client: Francisville East Lp | Permit status: Completed | Permit id: 223895 | |||||
Mechanical permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 304401 | |||||
Electrical permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 300571 | |||||
Zoning use permit ![]() Client: Francisville East Lp | Permit status: Completed | Permit id: 260129 | |||||
Electrical permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 296990 | |||||
Mechanical permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 270963 | |||||
Demolition permit ![]() Client: Francisville East Lp | Permit status: Completed | Permit id: 260172 | |||||
Suppression permit ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit status: Completed | Permit id: 281360 | |||||
Permit for the relocation of lot lines to create six(6) lots from eighteen(18) lots, lots 1 thru 5 for the erection of five attached structures(maximum height nte 35 feet) each with bays, off street parking for one automobile, erection of a three(3) story structure(maximum height nte feet 8 inches) with bays, off street parking for ten(10) automobiles including two(2) handicapped accessible spaces, with garden space, open air seating, a 6feet high 8 feet high fence and a sign, accessory management office, accessory community area for residents only, for use as twenty seven (27) dwelling units. ![]() Client: Francisville East Lp | Applicant: Michael Floyd, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: June 3, 2009 | Permit id: 8671 | |||||
Erection of a three(3) attached structure(maximum height nte 35 feet) with bays, off street paking for one automobile(size and location as shown on the application)for use as a single family dwelling. ![]() Client: Francisville East Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 26, 2009 | Permit id: 227794 | |||||
SCORE 100 Install hvac system in single family dwelling ![]() ![]() Client: Francisville East Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 25, 2010 | Permit id: 270951 | |||||
SCORE 89 Fire alarm only new installation ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 296990 | |||||
SCORE 89 Installation of a 48. 3kw solar pv system. ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: January 19, 2011 | Permit id: 300571 | |||||
SCORE 100 Hvac for 27 unit apt bldg ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 304401 | |||||
For the relocation of lot lines to create 6 lots from 18 existing lots for the development of (5) 3 story sfds, three of which are attached and 2 that are semi detached each lot will have associated pavement walkways, patios and one porous paved, accessory arking space and curb cut, and one underground stormwater management facility each lot will have 18 inch high fencing around a landscape bed in the front of the dwelling along with a 4, 6 and 8 foot high fencing with gates lot 6 will be a 3 story 27 unit apartment bldg. With aaccessory community space and 8 foot high fencing with gates and a management office ![]() Client: Francisville East Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: July 21, 2009 | Permit id: 200407 | |||||
New construction of a three (3) story structure for use as a single family dwelling. ![]() Client: Francisville East Lp | Permit type: New construction permit | Permit status: Completed | Completion date: October 22, 2010 | Permit id: 244396 | |||||
Complete demo of existing building ![]() Client: Francisville East Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 17, 2010 | Permit id: 260129 | |||||
SCORE 100 Complete demo of existing building ![]() ![]() Client: Francisville East Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: March 30, 2010 | Permit id: 260172 | |||||
SCORE 100 New construction,single family,11 fixtures with piping ![]() ![]() Client: Francisville East Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 12, 2010 | Permit id: 269867 | |||||
SCORE 89 Install 150a service, proper grounding & wire single family dwelling as per 2005 nec. ![]() ![]() Client: Francisville East Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: October 21, 2010 | Permit id: 276043 | |||||
For the erection of a three(3) story structure(maximum height nte feet 8 inches) with bays, off street parking for ten(10) automobiles including two(2) handicapped accessible spaces, with garden space, open air seating, a 6 feet high 8 feet high fence (size and location as shown on the application)for use as twenty seven(27) dwelling units , accessory management office, accessory community area for residents only ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 26, 2009 | Permit id: 227799 | |||||
New construction of a 3-story apartment building with (27) 1-bedroom units. Wood frame constructon, concrete grade slab and helical pile footings. Exterior: brick veneer, stucco and vinyl siding ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: New construction permit | Permit status: Completed | Completion date: March 10, 2011 | Permit id: 228021 | |||||
SCORE 100 To install sanitary & water for 136 fixtures. 1st floor 2 floor drains, 7 water closets, 7 lavatories, 4 bath tubs, 5 sinks, 1 mop receptor, 2nd floor 11 water closets,11 lavs,11 tubs,11 sinks, 11 lt. 3rd floor 11 wc,11 lav,11 bt, 11 sinks,11 l tubs ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 268987 | |||||
SCORE 100 Install fire suppression system, fdc, fire service line, as per plans ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Suppression permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 281360 | |||||
SCORE 89 Install power, lighting & switching per plans. ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 284768 | |||||
SCORE 100 Site work sewer connection ![]() ![]() Client: Francisville East Lp | Client Company: Community Ventures | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 12, 2011 | Permit id: 289082 |