Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Focus mastering audio remixing Date: August 9, 2007 Value: $31,000 Permit status: Issued | Permit id: Bld-07-14795 | |||||
Focus mastering-remodel-suite #100 Permit status: Pending | Permit id: Coo-07-10783 | |||||
SCORE 100 Date: October 12, 2007 Contractor: Ronald Gruhn Permit status: Issued | Permit id: Plb-07-17270 | |||||
SCORE 95 Perform the necessary electrical demo relocate and rewire existing lighting in the warehouse and office to accommodate the new layout wire the new cubicles and offices as needed rough in for low voltage in the new cubicles and offices wire the kitchen equipment Date: June 20, 2014 Contractor: John Williams Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-14-05783 | |||||
SCORE 100 Install kitchen hood, bath fan, remove existing fujitsu mini split move to new locations, install new 6-ton rtu and duct Date: June 25, 2014 Contractor: Richard Kudlacek Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-14-05157 | |||||
SCORE 100 Permits/electrical/commercial/electrical Date: September 22, 2008 Contractor: Joseph Mislivec Permit status: Issued | Permit id: Elc-08-07453 | |||||
SCORE 100 Permits/electrical/commercial/electrical Date: May 1, 2009 Contractor: Joseph Mislivec Permit status: Issued | Permit id: Elc-09-92789 | |||||
SCORE 100 Permits/plumbing/commercial/plumbing Date: September 24, 2008 Contractor: Jeffrey Estabrook Permit status: Issued | Permit id: Plb-08-06062 | |||||
SCORE 95 Focus mastering ductwork, registers, grilles, t-stats Permit status: Issued | Permit id: Mec-07-16133 | |||||
SCORE 95 Jr barger-condensing unit 2ton Date: July 12, 2013 Contractor: Rich Kusleika Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-13-06022 | |||||
Acosta food service Date: September 3, 2014 Permit type: Building - certificate of occupancy | Permit status: Closed | Permit id: Coo-14-00333 | |||||
Focus mastering-remodel-suite #100 Permit status: Pending | Permit id: Coo-07-10783 | |||||
SCORE 62 Communication services, inc/ste 300-500 Permit type: Permits/building/commercial/remodel existing space | Permit status: Issued | Permit id: Bld-08-08467 | |||||
SCORE 100 1) 1. 5 horse power low temperature outdoor condensing unit with matching low temperature evaporator coil with electric defrost. 1) 3 horse power low temperature outdoor condensing unit with matching low temperature evaporators with electric defrost. 1) 2 horse power medium temperature outdoor condensing unit with matching medium temperature evaporator with off cycle defrost. Date: August 6, 2014 Contractor: Kylon Rolles Permit type: Regrigeration/walk-in coolers and freezers | Permit status: Issued | Permit id: Mec-14-06493 | |||||
SCORE 100 Acosta Date: May 22, 2014 Contractor: Jeffrey Estabrook Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-14-03186 | |||||
SCORE 100 Darland corp #3 1 48tfe008-5 heat-cool rooftop new 7. 5ton, 2 udap1 unit heater replacement 100000 Permit type: Permits/mechanical/commercial/heating and air conditioning | Permit status: Issued | Permit id: Mec-08-06153 | |||||
SCORE 100 Acosta foods #300-pyro chem 4 gal fire system. Full operation test of system is required before putting system into service. Test to be witnessed by a city mechanical inspector Date: August 21, 2014 Contractor: Joe Stanek Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-14-06630 | |||||
SCORE 100 Permits/electrical/commercial/electrical Date: May 8, 2009 Contractor: Joseph Mislivec Permit status: Issued | Permit id: Elc-09-92900 | |||||
SCORE 100 Permits/electrical/commercial/electrical Date: May 8, 2009 Contractor: Joseph Mislivec Permit status: Issued | Permit id: Elc-09-92901 |