Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
![]() Permit id: 04-01-245 | Parcel: 001010001000 | |||||
SCORE 100 Install 3 4" water meter; new sfd parella 1b ![]() ![]() Permit id: 04-0156 | |||||
SCORE 100 Pool-excavator relocating soil shall obtain permission & required permits from local municipal agencies and adjacent owners prior to soil relocation or use of adjacent property. Back yard pool access shall have permission from the owner(s) of lot(s) easement(s) prior to work. All work shall comply with city standards. A pre-inspection is required! Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape ![]() ![]() Permit id: 04-0918 | Parcel: 014511001000 |